Loading...
HomeMy WebLinkAboutBy-law No. 2009-088 THE CORPORATION OF THE MUNICIPALITY OF BAYHAM BY-LAW 2009 -088 A BY-LAW TO ADOPT A ROAD ACCESS AND/OR WATER/SEWER SERVICES PERMIT POLICY& PROCEDURE WHEREAS the Council of the Corporation of the Municipality of Bayham deems it necessary and expedient to establish a permit system to regulate municipal road access requests and municipal services installations; NOW THEREFORE THE CORPORATION OF THE MUNICIPALITY OF BAYHAM HEREBY ENACTS AS FOLLOWS: 1. THAT the "Road Access and/or Water/Sewer Services Permit Policy& Procedure"be established as detailed in Schedule "A" attached hereto. 2. THAT the license fees shall be as per Schedule"B" attached to and forming part of this by-law. 3. THAT this by-law shall come into full force and effect upon final passing. READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 16TH DAY OF JULY 2009. A A ill A /1-i Ti'Y f'' ERK C BY-LAW 2009-088 SCHEDULE "A" BAYS MUNICIPALITY OF BAYHAM 4i1.* ,�� PROCEDURE r� p°'1Uaity SUBJECT: ROAD ACCESS AND/OR WATER/SEWER SERVICES PERMIT EFFECTIVE DATE: April 16, 2009 Revised June 4, 2009 PURPOSE: To establish a policy and guideline for property owner(s)requests for municipal road access, water and/or sewer services installations from the mains to the property line. SCOPE: All Municipal staff shall follow this policy and guideline. Policy Effective immediately, all requests for road access,water main connections and sewer main connections shall be subject to the approval of a "Road Access and/or Water/Sewer Services Permit". Exception: for requests to install water/sewer services to three or more adjacent lots, a Development Agreement shall be required. Procedure 1. Each request for a municipal road access shall require a "Road Access and/or Water/Sewer Services Permit". 2. A request for a connection to the water main and/or sewer main to a property line for up to a maximum of two adjacent lots shall require one "Road Access and/or Water/Sewer Services Permit" 3. Copies of the permit application are available from the Chief Building Official,Manager of Public Works,Water/Wastewater Superintendent and filing cabinet at front reception. 4. A property owner must complete, sign and submit the permit application to the municipal office for processing with the applicable fee as per the most current Rates and Fees By-law. 5. The appropriate staff member(Manager of Public Works and/or Water/Wastewater Superintendent) shall review the permit application for SCHEDULE 'A' Cont'd completeness, specify the requirements for the proposed works and determine the amount of security deposit. It will be at the discretion of municipal staff to determine the need for a formal written estimate for works upon which to base the security deposit amount. The applicant shall obtain and provide such written estimate to municipal staff. 6. The appropriate staff member shall provide signed approval on the permit. 7. A photocopy of the permit shall be provided to the property owner. S. It is the property owner's responsibility to notify the office for an inspection of completed works. 9. The appropriate staff member shall inspect the works and if complete, sign and date the original permit. 10. If the works are not completed to the municipality's satisfaction, the appropriate staff member shall contact the property owner to discuss the outstanding concerns and determine a completion date. 11. Once all works are approved as complete, the permit shall be filed as applicable: • in the designated roll file or • in the case of a severance and a roll number is not determined, it shall be placed in File P11.RAWSS in the RMS Filing System for reference in future development or • provided to the Chief Building Official to attach to an active building permit 12. In the case of the permit being a condition of an application for consent: a) the Road Access portion of the permit must be approved to satisfy the condition of severance. Installation of the access would remain the responsibility of the builder as per the approved permit. Should the builder require a change to the permit, a new permit with the applicable fee is required. b) the Water/Sewer Services portion of the permit must be approved, services installed and full restoration completed to the satisfaction of the municipality to satisfy the condition of consent. BY-LAW 2009-088 SCHEDULE 'B' PERMIT FEES Road Access $160.00 Water Service Connection $170.00 Sewer Service Connection $170.00