Loading...
HomeMy WebLinkAboutBy-law No. 2003-087 THE CORPORATION OF THE MUNICIPALITY OF BAYHAM BY-LAW NO.2003-087 A BY-LAW TO AMEND BY-LAW 2002-49, BEING A BY-LAW TO PROVIDE FOR DRAINAGE WORKS IN THE MUNICIPALITY OF BAYHAM IN THE COUNTY OF ELGIN (SPROUL EXTENSION& BRANCH("A") WHEREAS the Council of the Municipality of Bayham in the County of Elgin in accordance with the Sections 4 and 78 of the Drainage Act, R.S.O. 1990, on September 19, 2002 by By-law 2002-49 adopted Engineer's Report No. 97099, prepared by Spriet Associates, dated May 17, 2002 with an estimated total cost of $119, 900.00 to construct the drainage works on the lands and roads described.as: Part of Lots 1 to 4,Concessions 1 and 3, in the Municipality of Bayham, in the County of Elgin; AND WHEREAS the actual cost of the construction has now been determined to be$123,445.13 AND WHEREAS $123,445.13 is the amount to be contributed by the municipality for construction of the drainage works on the above noted lands; AND WHEREAS Council deems it expedient to amend the schedule of net assessment to reflect a total cost of $123,445.13 NOW THEREFORE the Council of the Municipality of Bayham enacts as follows: THAT the actual costs of the drainage works attached hereto as Schedule"A"amending the Schedule ofNet Assessment attached to By-law 2002-49 is hereby adopted; THAT The Corporation of the Municipality of Bayham may borrow,on the credit of the Corporation,the amount of$123,445.13,being the amount necessary for construction of the drainage works; THAT all other terms and conditions of By-law 200$249 are hereby confirmed; AND THAT this by-law shall come into full force and effect upon the passing thereof READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 2" DAY OF OCTOBER 2003. ,* ( � I.4, ' P )3Jz cdo - -e,s, , Municipality of Bayham Municipal Drain Maintenance Schedule Name of Drain: Sproule Dr Extension Drain#: By-Law#: Date: Construction Engineer's Estimated Cost: 119900 Repair Location: Assessment for Repair: 119900 Costs for Repairs: 123445.13 Roll number Lot&Conc Construction Assess Repair$ Allowances Grant Net Costs 8-009 Conc 1 Pt Lot 3 5904 $6,078.57 $2,670.00 $2,026.19 $1,382.38 8-011 Conc 1 Pt Lot 4&5 7930 $8,164.47 $4,010.00 $2,721.49 $1,432.98 8-027 Conc 2 Pt Lot 2 2007 $2,066.34 $688.78 $1,377.56 8-024 Conc 2 Pt Lot 2 268 $275.92 $91.97 $183.95 8-023 Conc 2 Pt Lot 3 21145 $21,770.20 $14,650.00 $7,256.73 ($136.53) 8-034 Conc 2 Pt Lot 3 3530 $3,634.37 $100.00 $1,211.46 $2,322.92 8-03502 Conc 2 Pt Lot 3 52 $53.54 $53.54 8-03501 Conc 2 Pt Lot 3 61 $62.80 $62.80 8-035 Conc 2 Pt Lot 3 161 $165.76 $165.76 8-035 Conc 2 Pt Lot 3 214 $220.33 $73.44 $146.88 8-03601 Conc 2 Pt Lot 3 60 $61.77 $61.77 8-036 Conc 2 Pt Lot 3 164 $168.85 $168.85 8-033 Conc 2 Pt Lot 3 2890 $2,975.45 $920.00 $991.82 $1,063.63 8-032 Conc 2 Pt Lot 3 3186 $3,280.20 $1,690.00 $1,093.40 $496.80 8-039 Conc 2 Pt Lot 3&4 2437 $2,509.06 $836.35 $1,672.70 8-022 Conc 2 Pt Lot 4 5556 $5,720.28 $1,710.00 $1,906.76 $2,103.52 8-021 Conc 2 Pt Lot 4&5 118 $121.49 $40.50 $80.99 8-062 Conc 3 Pt Lot 1 526 $541.55 $180.52 $361.03 8-063 Conc 3 Pt Lot 1,2&3 3156 $3,249.31 $1,083.10 $2,166.21 8-065 Conc 3 Pt Lot 2 3693 $3,802.19 $1,267.40 $2,534.79 8-066 Conc 3 Pt Lot 2 3769 $3,880.44 $1,293.48 $2,586.96 8-07001 Conc 3 Pt Lot 3 2061 $2,121.94 $707.31 $1,414.63 8-070 Conc 3 Pt Lot 3 1905 $1,961.33 $653.78 $1,307.55 8-069 Conc 3 Pt Lot 3 3294 $3,391.39 $1,130.46 $2,260.93 8-068 Conc 3 Pt Lot 3 124 $127.67 $127.67 8-072 Conc 3 Pt Lot 3&4 1084 $1,116.05 $372.02 $744.03 8-075 Conc 3 Pt Lot 3&4 129 $132.81 $44.27 $88.54 County of Elgin Nova Scotia Line 1712 $1,762.62 $1,762.62 Municipality of Bayham Vienna Line 1210 $1,245.78 $1,245.78 Municipality of Bayham Saxton Road 254 $261.51 $261.51 Municipality of Bayham Saxton Road Crossing 5200 $5,353.75 $5,353.75 Municipality of Bayham Vienna-Ditch 1600 $1,647.31 $1,647.31 Branch A 8-034 Conc 2 Pt Lot 3 709 $729.96 $243.32 $486.64 8-03502 Conc 2 Pt Lot 3 364 $374.76 $374.76 8-03501 Conc 2 Pt Lot 3 375 $386.09 $386.09 8-035 Conc 2 Pt Lot 3 1826 $1,879.99 $1,879.99 8-035 Conc 2 Pt Lot 3 1566 $1,612.30 $770.00 $537.43 $304.87 8-03601 Conc 2 Pt Lot 3 375 $386.09 $386.09 8-036 Conc 2 Pt Lot 3 469 $482.87 $482.87 8-033 Conc 2 Pt Lot 3 2969 $3,056.79 $1,160.00 $1,018.93 $877.86 8-032 Conc 2 Pt Lot 3 2985 $3,073.26 $1,024.42 $2,048.84 8-039 Conc 2 Pt Lot 3&4 494 $508.61 $169.54 $339.07 8-070 Conc 3 Pt Lot 3 1020 $1,050.16 $350.05 $700.11 8-069 Conc 3 Pt Lot 3 5381 $5,540.10 $150.00 $1,846.70 $3,543.40 8-068 Conc 3 Pt Lot 3 461 $474.63 $474.63 Municipality of Bayham Vienna Line 2806 $2,888.97 $2,888.97 Municipality of Bayham Vienna Line Crossing 6700 $6,898.10 $6,898.10 Municipality of Bayham Vienna Tile Drain 6000 $6,177.40 $6,177.40 119900 123,445.13 27,830.00 30,861.63 64,753.50 Drains/Sproule Or Ext,Br Axis 09/25/2003