Loading...
HomeMy WebLinkAboutBy-law No. 2005-134 THE CORPORATION OF THE MUNICIPALITY OF BAYHAM BY-LAW NO.2005-134 BEING A BY-LAW TO AUTHORIZE THE EXECUTION OF A SITE PLAN AGREEMENT WITH PETER AND YVONNE STEYAERT AND EMIEL JANSSENS WHEREAS subsection 41(2) of the Planning Act, R.S.O. 1990 Chapter P.13 provides in part that where in an official plan an area is shown or described as a proposed site plan control area, the council of the local municipality in which the proposed area is situate may,by by-law, designate the whole or any part of such area as a site plan control area. AND WHEREAS the Municipality of Bayham has enacted a Site Plan Control Area By- law pursuant to Section 41 of the said Planning Act. AND WHEREAS subsection 41 (4) of the said Planning Act provides in part that no person shall undertake any development in an area designated under subsection(2)unless the council of the municipality or, where a referral has been made under subsection (12), the Municipal Board has approved one or both, as the council may determine, of the following: 1. Plans showing the location of all buildings and structures to be erected and showing the location of all facilities and works to be provided in conjunction therewith and of all facilities and works required under clause(7) (a). AND WHEREAS Erie Shores Wind Farm Limited Partnership, acting as agent for Peter and Yvonne Steyaert and Emiel Janssens, has applied to the Municipality of Bayham for site plan approval under the Planning Act, R.S.O. 1990, Chapter P.13, as amended. AND WHEREAS the Council of the Corporation of the Municipality of Bayham now deems it necessary to enter into a site plan agreement with Peter and Yvonne Steyaert and Emiel Janssens. NOW THEREFORE THE COUNCIL OF THE CORPORATION OF THE MUNICIPALITY OF BAYHAM ENACTS AS FOLLOWS: 1. THAT the Mayor and Clerk be and they are hereby authorized and directed to execute the site plan agreement between the Corporation of the Municipality of Bayham and Peter and Yvonne Steyaert and Ernie! Janssens, attached hereto as Schedule"A"and forming part of this by-law. 2. THAT this By-law and executed agreement shall be registered in the Land Registry Office for the Registry Division of Elgin(No. 11). READ A FIRST AND SECOND TIME this 156 day of December;2005. READ A THIRD TIME AND FINALLY PASSED this 15th day of December, 2005. /A / . A_ _IrIF34-4\ 1-167:-L-n MA 01 C 311 Province Do Process Software Ltd. (416)322-6911 D Vi Ontario Form 4—Land Registration Reform Act 1 (1)Registry ❑X Land Titles ❑ (2) Page 1 of 12 pages (3)Property Block Property Identifier(s) Additional: See ❑ Schedule C'"" '' (4)Nature of Document t"- SITE PLAN AGREEMENT x--t t . 1 cn (5)Consideration Z co'1 0 Dollars$ w t: D ® • . r-+ (6)Description w _ West Half of Lot 24, Concession 1, Geographic Township of Bayham, o _ Municipality of Bayham,County of EIgin, re .., (. : containing one hundred and fifteen acres more or Iess, opart of which includes Lots "One" and "A" according to Registered Plan 217. New Property Identifiers Additional: See ❑Schedule Executions (7) This (a)Redescription (b;.Schedule for: Additional: Document New EasementAdditional See Contains: Plan/Sketch ❑ Description ❑X Parties ❑ Other ❑}C Schedule ❑ (8)This Document provides as follows: SITE PLAN AGREEMENT between PETER STEYAERT,YVONNE STEYAERT and EMIEL JANSSENS and ERIE SHORES WIND FARM GENERAL PARTNER INC.AS TRUSTEE FOR ERIE SHORES WIND FARM GENERAL PARTNER TRUST AS GENERAL OF THE ERIE SHORES WIND FARM LIMITED PARTNERSHIP and THE CORPORATION OF THE MUNICIPALITY OF BAYHAM. Continued on Schedule❑ (9)This Document relates to instrument number(s) (10)Party(ies) (Set out Status or Interest) Name(s) Signature(s) Date of Signature Y M 0 THE CORPORATION OF THE MUNICIPALITY OF BAYHAM BY ITS SOLICITORS, GIBSON,LINTON,TOTH, per: 2007 04 I/ CAMPBELL & BENNETT SCOTT K. CAMPBELL I (11) Address far Service P. O. Box 160, Straffordville,Ontario,NOJ 1Y0 (12)Party(ies) (Set out Status or Interest) Name(s) Signature(s) Date of Signature Y M D (13) Address for Service II (14)Municipal Address of Property (15)Document Prepared by: Fees and Tax J ORegistration Fee Gibson,Linton,Toth, Campbell& w Not Assigned Bennettco 36 Broadway,Box S Lu Tillsonburg, Ontario ir N4G 4H3 ° re \^ Ai Total J Document prepared using Farmt Ware LandForms SITE PLAN AGREEMENT BETWEEN PETER STEYAERT, YVONNE STEYAERT, AND EMIEL JANSSENS AND ERIE SHORES WIND FARM GENERAL PARTNER INC., AS TRUSTEE FOR ERIE SHORES WIND FARM GENERAL PARTNER TRUST AS GENERAL PARTNER OF THE ERIE SHORES WIND FARM LIMITED PARTNERSHIP AND THE CORPORATION OF THE MUNICIPALITY OF BAYHAM Part Lot 24, Concession 1 "<: �,1a ' A P'n �� THIS AGREEMENT made this 30th day of January,2006. BETWEEN: PETER STEYAERT, YVONNE STEYAERT, AND EMIEL JANSSENS, AND ERIE SHORES WIND FARM GENERAL PARTNER INC., AS TRUSTEE FOR ERIE SHORES WIND FARM GENERAL PARTNER TRUST AS GENERAL PARTNER OF THE ERIE SHORES WIND FARM LIMITED PARTNERSHIP Hereinafter called the"OWNER" OF THE FIRST PART -AND- THE CORPORATION OF THE MUNICIPALITY OF BAYHAM Hereinafter called the"MUNICIPALITY" OF THE SECOND PART WHEREAS the Owner is the owner in fee simple and the owner of an easement in gross of the lands situate in the Municipality of Bayham, in the County of Elgin being Part of Lot 24, Concession 1,more particularly described in Schedule"A"attached hereto(and hereafter referred to as the"Lands"); AND WHEREAS the Official Plan of the Municipality of Bayham in effect, designates the entirety of the Municipality as a site plan control area; AND WHEREAS the Owner intends to develop the lands in accordance with the Site Plan attached hereto,as Si t 'A'2(and hereafter referred to as the"Plan"); Exhibit "A" and "A-1" AND WHEREAS the Municipality, as a condition of development of the lands requires the Owner to enter into a Development Agreement; NOW THEREFORE in consideration of other good and valuable consideration and the sum of Two Dollars ($2.00)of lawful money of Canada by each to the other paid(the receipt whereof is acknowledged by each), the Owner hereby covenants and agrees with the Municipality as follows: 1. The Owner agrees that no building permit will be available until the Plan has been approved by the Municipality, and further agrees that work will not commence prior to the issuance of the building permit. 2. The following Schedules, which are identified by the signatures of the parties to this Agreement, and which are attached hereto, are hereby made a part of this Agreement, as fully and to all intents and purposes as though recited in full herein: EXHIBIT"A"and"A-1"-SITE PLAN EXHIBIT"B"-CERTIFICATE OF COMPLIANCE 3. Schedule"A"hereto describes the lands affected by this Agreement. 4. Exhibit"A"and"A-I" -Site Plan, shows: a) the location and height of all buildings and structures to be erected; b) the location of vehicular entrances and exits; c) the location and provision of off-street vehicular loading and parking facilities, including driveways for emergency vehicles; d) walkways and all other means of pedestrian access; e) the location and provision of fences, trees and all ground cover or facilities for landscaping the lands and protecting the adjoining lands and shows the lighting including flood lighting,of the land or any building or structure thereon; f) the location and provision for the collection and storage of garbage and other waste material; g) lot grading information, indicating overland flow to and from adjacent properties, collection and disposal of surface water and storm water management (if deemed necessary by the Municipality) 5. The Owner agrees that the building or buildings will be erected in accordance with the plan(s) approved, subject only to such changes as have received advance approval. 6. The Owner agrees that the site development and servicing will be in accordance with the plan(s) as approved, subject only to such changes as have received advance approval. 7. The Owner further agrees that: a) final grades and elevations, and any culvert installations, will be established to the satisfaction of the Municipality. The Owner will provide proof of final grades and elevations certified by a professional Iand surveyor or civil engineer, prior to the final release of the Letter of Credit. b) all necessary provisions for service connections on site will be made to the satisfaction of the Municipality. c) construction work will be carried forward expeditiously in good and workmanlike manner, in accordance with good trade practice and so to cause a minimum of nuisance. d) all necessary precautions to avoid dust, noise and other nuisance and to provide for the public safety will, so far as possible, be taken and which comply with The Construction Safety Act. e) all necessary care will be taken to see that mud and soil is not tracked or spilled onto any public street, and where such tracking occurs, the street shall be cleaned at the end of each working day. 1) garbage disposal facilities will be an enclosed type located as shown on the Site Plan designed in a manner satisfactory to the Municipality. g) unless otherwise provided, all parking lots and walkways will be finished with hot-mix asphalt, concrete or paving stones to the satisfaction of the Municipality and have permanent bumper curbing along all parking areas that abut the property limits. h) no topsoil shall be stockpiled on any other portion of the Owner's lands except those lands identified in Schedule"A"to this agreement; and all topsoil shall be stockpiled and maintained in a manner which allows for the maintenance of weeds; and the Municipality may go in and do the same at the Owner's expense, and collect the cost in like manner either as municipal taxes or from the Letter of Credit deposited as performance security. i) stock-piling of snow will not be allowed on the site where it will constitute a hazard in the opinion of the Municipality. j) the electrical servicing of the property shall be subject to the approval of Hydro One. k) upon failure by the Owner to do any act during the development period herein, that the public safety or convenience requires, in accordance with this Agreement,upon seven(7) days written notice, the Municipality, in addition to any other remedy, may go in and do same at the Owner's expense, and collect the cost in like manner either as municipal taxes or from the Letter of Credit deposited as performance security. 1) the Municipality may treat any breach of this Agreement as a breach of the Building By- Law, and upon twenty-four (24) hours written notice to the Owner, stop work until the breach is rectified. m) nothing in this Agreement constitutes waiver of the owner's duty to comply with any by- law of the Municipality or any other law. 8. The Owner shall: a) be responsible for consulting with Hydro One regarding any matters that relate to services provided by Hydro One. 9. The Owner shall be responsible for consulting with and obtaining any necessary approval from all regulatory bodies such as, but not limited to, the Long Point Region Conservation Authority and the Ministry of the Environment. 10. The Owner shall satisfy all the requirements in relation to the fire protection for the building(s)to the satisfaction of the Municipality's Fire Chief. 11. The Owner agrees to pay for damages to public property including but not limited to municipal drain, ditches, street surfaces, storm and sanitary sewer systems, which may occur during the period of construction. Any such repair may be undertaken by the Municipality at the expense of the Owner,within thirty(30)days notice. 12. Any and all lighting shall be installed and maintained so as to not, in the opinion of the Municipality, interfere with the use or enjoyment of adjacent properties, or with the safe flow of traffic on abutting or adjacent streets. 13. The Owner shall landscape and maintain plants and ground cover acceptable to the Municipality, on those lands so indicated on the Site Plan. 14. If the Ontario Building Code requires that an Architect or Professional Engineer or both, shall be responsible for the field review of any new building or extension,provided for in this Agreement, the Owner shall not occupy or use or permit to be occupied or used, any said new building or extension,until after an Architect or Professional Engineer has given to the Municipality, a letter addressed to the Municipality, and signed by the said Architect or Professional Engineer, certifying that all construction and/or services on or in the said lands, required for this development or redevelopment, newly installed by the Owner in connection with this development or redevelopment,have been installed and/or constructed in a manner satisfactory to the Architect or Professional Engineer. 15. The Municipality, through its servants, officers and agents, including it's Chief Building Official, Fire Chief, and Municipal Engineer, may, from time to time, and at any time, enter on the premises of the Owner to inspect: a) the progress of development; b) the state of maintenance as provided for in this Agreement. 16. In the event of any servant, officer or agent of the Municipality, determining, upon inspection, that the development is not proceeding in the strict accord with the plans and specifications filed, such servant, officer or agent shall forthwith,place a notice requiring all work to be stopped upon the premises and forward a copy, by registered mail, to the Owner at the last known address, on the last revised assessment roll, and the Owner shall forthwith correct the deficiency or deviation. 17. In the event of any servant, officer or agent of the Municipality, upon inspection, be of the opinion that the state of maintenance is not satisfactory, such servant, officer or agent shall forthwith, forward notice of such opinion, by registered mail, to the Owner, at the last known address, and the Owner shall forthwith correct the deficiency or appeal to the Council of the Municipality of Bayham,as hereinafter provided. 18. In the event that the Owner should disagree with the opinion of the servant, officer or agent of the Municipality, as to the state of maintenance, such Owner shall appear before the Council of the Municipality of Bayham, which after hearing the Owner, shall express its opinion as to whether the maintenance is satisfactory, by resolution, which shall constitute a final determination of the matter. 19. In the event that the Owner shall fail to obey a stop work order issued under Section 17 hereof, the Owner recognizes the right of the Municipality to apply to the Courts for a restraining order. 20. In the event that an Owner shall fail to correct a deviation or deficiency after notice pursuant to Section 17 or after notice of an opinion, which the Council of the Municipality of Bayham determines is correct, under Section 17, the Council of the Municipality of Bayham, may by by- law, direct, on default of the matter or thing being done by the Owner, after two (2) week's notice, to it by registered mail, at the last known address of the Owner, pursuant to the last revised assessment roll of passage of such By-Law, that such matter or thing be done by the Municipality, at the expense of the Owner, which expense may be recoverable by action as municipal taxes, or from the Letter of Credit deposited as performance security. 21. Unless otherwise authorized, in the event of the Owner wishing to change at any time, the buildings, structures or facilities described n Exhibit"A" and"B", it shall make application to the Council of the Municipality of Bayham, for approval, and shall not proceed with such change until approval is given by such Council, or in default by The Ontario Municipal Board, under the procedure set out in Section 41 of The Planning Act, 1990,hereinbefore referred to. 22. The Owner agrees to pay to the Municipality all administration costs incurred in connection with this Agreement, and the fulfillment of this Agreement, including legal, engineering and inspection costs. 23. CAPITAL CHARGES The following capital charges are to be paid at the time that this Agreement is signed. 24, SITE PLAN REVIEW FEE The Owner shall pay to the Municipality, in cash or by certified cheque, an amount of One Thousand($1,000)Dollars,per application, for Site Plan Review. 25. LIABILITY INSURANCE Before commencing any of the work provided for herein, the Owner shall supply the Municipality with a Liability Insurance policy in the amount of$3,000,000 per occurrence, and in a form satisfactory to the Municipality, indemnifying the Municipality from any loss arising from claims for damages injury or otherwise, in connection with the work done by or on behalf of the owner of the development. The said policy shall be provided at the time of the signing of the Agreement and remain in force,until the development is complete and all required documentation as per Article 15 has been filed with the Municipality. 26. PERFORMANCE GUARANTEE The Owner hereby defines the completion date of this Agreement and project to be on or before October 20,2006. It will be the Owner's responsibility to require, in writing, an extension to this agreement/project, within sixty (60) days of the above stated completion date, should an extension be required. As security for the performance and completion of all works required by this agreement, the Owner shall supply the Municipality with a Letter of Credit, equal to $Nil. The Letter of Credit will be based on the estimated cost of alterations to public property, roadway, curbs and gutters and drains, and any repairs for damages to public property,roadway,curbs and gutters and drains, plus all site specific components as defined by the Site Plan, "Exhibit A" and "A-1" which are approved under this Agreement. The amount of the Letter of Credit shall be established by the Municipality.The irrevocable Letter of Credit from a Chartered Bank expressed to be pursuant to this Agreement and payable to the Municipality at any time or in part, from time to time, upon written notice from the Municipality, shall be provided at the time of signing of this Agreement, and shall remain in force,until Twelve(12)months following the completion of this project. 27. This Agreement and the provisions thereof, do not give to the Owner or any person acquiring any interest in the said lands any rights against the Municipality with respect to the failure of the Owner to perform or fully perform any of its obligations under this Agreement or any negligence of the Owner in its performance of the said obligations. 28. In the event that no construction on the said lands has commenced within one (1) year from the date of registration of this Agreement the Municipality may, at its option, on one month's notice to the owner,declare this Agreement to be subject to re-negotiation, whereupon the Owner agrees that it will not undertake any construction on the said lands until this Agreement has been re- negotiated. 29. The Owner agrees that it will not call into question, directly or indirectly in any proceeding whatsoever in law or in equity or before any administrative tribunal the right of the Municipality to enter into this Agreement and to enforce each and every term, covenant and condition herein contained and this Agreement may be pleaded as an estoppels against the Owner in any case. 30. The Owner agrees on behalf of themselves, their heirs, executors, administrators and assigns, to save harmless and indemnify the Municipality, from all losses, damages, costs, charges and expenses which may be claimed or recovered against the Municipality by any person or persons arising either directly or indirectly as a result of any action taken by the Owner, pursuant to this Agreement. 31. All facilities and matters required by this Agreement shall be provided and maintained by the Owner at its sole risk and expense to the satisfaction of the Municipality and in accordance with the standards determined by the Municipality and in default thereof, and without limiting other remedies available to the Municipality, the provisions of Section 326 of The Municipal Act, R.S.O. 1990, shall apply. 32. This Agreement shall be registered at the expense of the Owner, against the land to which it applies, and the Municipality shall be entitled, subject to the provisions of The Registry Act, to enforce its provisions against the Owner,named herein, and any and all subsequent Owners of the land. 33. A Certification of Compliance attached hereto as Exhibit "B", shall be filed by the Owner, following completion of the development to ensure all details of the Site Plan Agreement have been complied with. 34. In the event that Peter Steyaert, Yvonne Steyaert, and Emiel Jannssens has any liability imposed upon it pursuant to the terms of this Agreement in connection with the development of the Erie Shores Wind Farm as set out in the plan, then Erie Shores Wind Farm General Partner Inc. as trustee for Erie Shores Wind Farm General Partner in Trust as general partner of the Erie Shores Wind Farm Limited Partnership, its successors and assigns, covenants and agrees to save harmless and indemnify Peter Steyaert,Yvonne Steyaert, and Emiel Jannssens, its successors and assigns, from any and all claims, expenses, and costs which it might in the future become obligated to pay as a result of having entered into this Agreement. IN WITNESS WHEREOF,the Parties hereto have hereupon,affixed their Corporate Seal,duly attested to by their authorized signing officers in that behalf. OWNER: Peter Steyaert / Yvonne Steyaert Ernie ens ERIE SHORES WIND FARM GENERAL PARTNER INC., AS TRUSTEE FOR ERIE SHORES WIND FARM GENERAL PARTNER TRUST AS GENERAL PARTNER OF THE ERIE SHORES WIND FARM LIMITED PARTNERSHIP 27'etLf%reze.t...c `c-644-46. ray. 0 'e' PC. VJZ P J ®, ; Per:f�C>B � '� I have authority to bind the Corporation THE CORPORATION OF THE MUNICIPALITY OF BAYHAM MAYOR Lynn Acre �\ — CLERK Lynda Millard At,�/`� � '.`16 c , ., T " ,- `1"-4• 3! LEGEND 'fat �r -4„,-,:,-_, :. • 77 ` .. ti_i. ��_,....:... .,..7..., //r ' ����; ►9 ESWF 3PH 34.5kV CKT ( PH.1 - 99 MW) 1I��� 1+1� T a, �9� tirld.r" UNDERGROUND 34.5kV CABLE 410FI rS00$110 '' l ' " '.: I Ab • TURBINE ACCESS ROAD ' " , MAJOR ROADS ArA,.. I�`,��.� � .:` � 4 : oi ..`��,�. , EXISTING WOOD POLE (NOT ALL POLES SHOWN) '., ,_ 4j4d i�I <::•�+:"1..,•... cp ' :! I;V- T12 TURBINE - GE (PH.I) Aopp •I �q 525 � 4k •f.▪ +• i :ft,. ❑ HOUSE-LEASEHOLDER �_ � �._ _ ���'�; ,.;. `�,c, _,,.,., � ■ HOUSE- NON-LEASEHOLDER :4:1e"'� l 't r 4,!J}fin ••• : ., ii1•'`'fiiii I'lb,- 21°0101[11 FARM BUILDING �f ':,• . . ,;,;;;;;, ,;,,,..;. EXISTING WOODLOT AREA / � ..� .Ti_ 1 ,..,: .4:1*, m ..:,.......,".,13. ....... ` :.• •d.r.•'r'•':': ?iliiiiiiia,< DIMENSIONS A Arlo fir ifi.:.: : ., . •• SHOWN ARE IN METERS '' >: � ,CI) NOTES; j, ��yryliI • 1 1 L 1. a) LOT AREA - 150.53 ACRES FOR LOT 24, CON 1. 1111 17 ._. . III'!!, �° 2. DIAMETER OF ROTOR BLADE = Figure 1A. Overview of GEWE 1.5sle MTS 80m HH with "T" Flange Tower Base per Tower Drawing 903216 Rev. 0 T ' ! F iY F of IR ® Noy ® ! o i� Toyer Orawing No.903216 Rev.0 It EXHIBIT"B" THE CORPORATION OF THE MUNICIPALITY OF BAYHAM CERTIFICATE OF CQMPLIANCE PROPERTY IDENTIFICATION: Municipal Address: Owner: This document serves to certify that the development project on the above noted lands has been completed in accordance with the terms and conditions of The Site Plan Agreement By-law No. DATED: I HEREBY CERTIFY THAT THE ABOVE DECLARATION IS TRUE AND CORRECT. Witness Signature: Name of Owner: Address: Phone Number: Province of Schedule Do Process Software Ltd. • (416)322-6111 %111, Ontario Form 5—Land Registration Reform Act Page 12_ Additional Property Identifier(s)and/or Other Information SCHEDULE "A" Legal Description: West Half of Lot 24, Concession 1, Geographic Township of Bayham,Municipality of Bayham, County of Elgin, containing one hundred and fifteen acres more or less, part of which includes Lots "One" and "A" according to Registered Plan 217. LLz LLp O CCU) OD Document prepared using Formt Ware LandForms