Loading...
HomeMy WebLinkAboutBy-law No. 2005-073 THE CORPORATION OF THE MUNICIPALITY OF BAYHAM BY-LAW NO.2005-073 A BY-LAW TO PROVIDE FOR THE MAINTENANCE OF DRAINS WITHIN THE MUNICIPALITY AND TO RAISE THE SUM OF $22,338.19 TO COVER THE COSTS. WHEREAS it is provided by the said reports, By-Laws and Drainage Act that the Municipality of of Bayham shall maintain the said Drainage works, at the expense of the lands and roads in the said Municipality in any way assessed for the construction thereof, in the portion according to such assessment until such assessments, or portions thereof,be varied; AND WHEREAS in compliance with such duty, the Municipality has from time to time, carried out certain minor repairs on the said drains; AND WHEREAS it is desirable to make a pro rata assessment and levy pursuant to the said Drainage Act, upon the lands and roads assessed for the construction of the aforesaid drains so as to provide for and raise the cost of the said repairs and expense incidental thereto which amount in all to $22,338.19 to lands and roads assessed, and the amount of the assessments upon which the assessments and proportions hereby made are fixed, appear upon attached Schedules of Assessments, which said Schedules is part of this By-Law; AND WHEREAS it is deemed expedient to levy the amounts in 2005. THEREFORE THE COUNCIL OF THE CORPORATION OF THE MUNICIPALITY OF BAYHAM ENACTS AS FOLLOWS: 1. THAT for the purpose of paying the said repairs and expenses incidental thereto or for repaying into the General Funds of the Municipality the amount or cost thereof the sum of $20,224.39 the amount charged against the lands of the drainage works, and now assessable for maintenance, the following total special rates and amounts as set out in the Schedule of Assessments attached hereto and forming a part of the By-Law, shall over and above all other rates be assessed and levied and collected in the same manner and at the same time as other taxes are levied and collected upon and from the undermentioned lots or parts of lots as specified in the attached Schedule of Assessments in the present year. 2. THAT for the purpose of paying the sum of $1,295.10 the amount charged against said roads of the Municipality, and$818.71 the amount charged against other Municipalities, the Province of Ontario and other Boards and Corporations for the aforesaid purpose, accounts shall be Ievied against the roads of the Municipality and against the other Municipalities,the Province of Ontario, and other Boards and Corporations to pay the aforesaid amounts. 3. THAT the sum of $6.482.90 be charged to the Treasurer of Ontario under the Drain Maintenance Grants Program for repairs to drains serving agricultural lands. READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 18TH DAY OF AUGUST 2005. MAYr 1 R CLERK 0/2. aba5 - 073 Municipality of Bayham Municipal Drain Maintenance Schedule Drain name Adler Drain Branch "B" Drain# 1 By-Law# 1429 Date: 30-Apr-05 Engineer's Estimated Cost: $ 7,076.00 Repair Location: Outlet&Near Outlet in Lot#14, Concession#4 Assessment for Repair: 7,076 Costs for Repairs: $ 236.50 Roll Number: Lot &Concession: Repair Assessment:Repair$: Grant: Net Costs 002-14700 Part Lot 14, Conc 4 2,650 $88.57 $29.52 $59.05 002-15800 Part Lot 15, Conc 4 260 $8.69 $0.00 $8.69 002-15900 Part Lot 15, Conc 4 260 $8.69 $2.90 $5.79 003-03200 Part Lot 15, Conc 5 707 $23.63 $7.88 $15.75 003-03500 Part Lot 15, Conc 5 20 $0.67 $0.00 $0.67 003-03100 Part Lot 15, Conc 5 30 $1.00 $0.00 $1.00 003-03000 Part Lot 14, Conc 5 127 $4.24 $1.41 $2.83 003-02900 Part Lot 14, Conc 5 900 $30.08 $10.03 $20.05 003-03700 Part Lot 15, Conc 5 620 $20.72 $6.91 $13.81 Elgin County Rd#45 1,502 $50.20 $50.20 $0.00 $0.00 $0.00 Totals 7076 $236.50 $58.65 $177.85 Drains/Adler Drain Branch Bids 09/08/2005 B/L X05- 02.3 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name: ADLER DRAIN Drain # 1 By-Law# 1429 Date: 01-Jun-05 Engineer's Estimated Cost: $ 7,076.00 Repair Location: Part Lots 14& 15, Conc 4&5, Bayham Township Assessment for Repair: 7,076 Costs for Repairs: $ 80.14 Roll Number: Lot &Concession: Repair Assessment: Repair$: Grant: Net Costs 002-14700 Part Lot 14, Conc 4 2,650 $30.01 $10.00 $20.01 002-15800 Part Lot 15, Conc 4 260 $2.94 $0.98 $1.96 002-15900 Part Lot 15, Conc 4 260 $2.94 $0.98 $1.96 003-03200 Part Lot 15, Conc 5 707 $8.01 $2.67 $5.34 003-03500 Part Lot 15, Conc 5 20 $0.23 $0.08 $0.15 003-03100 Part Lot 15, Conc 5 30 $0.34 $0.11 $0.23 003-03000 Part Lot 14, Cone 5 127 $1.44 $0.48 $0.96 003-02900 Part Lot 14, Conc 5 900 $10.19 $3.40 $6.80 003-03700 Part Lot 15, Conc 5 620 $7.02 $2.34 $4.68 Elgin County Rd#45 1,502 $17.01 $17.01 $0.00 $0.00 $0.00 Totals 7076 $80.14 $21.04 $59.10 Drains/Adler Drain#1 2nd Acct.xls 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name: ADLER DRAIN Drain# 1 By-Law# 1429 Date: 01-Jan-05 (Work done in Dec. 2004) Engineer's Estimated Cost: $ 7,076.00 Repair Location: Part Lots 14& 15, Conc 4 &5, Bayham Township Assessment for Repair: 7,076 Costs for Repairs: $ 1,275.00 Roll Number: Lot&Concession: Repair Assessment: Repair$: Grant: Net Costs 002-14700 Part Lot 14, Conc 4 2,650 $477.49 $159.16 $318.33 002-15800 Part Lot 15, Conc 4 260 $46.85 $15.62 $31.23 002-15900 Part Lot 15, Conc 4 260 $46.85 $15.62 $31.23 003-03200 Part Lot 15, Conc 5 707 $127.39 $42.46 $84.93 003-03500 Part Lot 15, Conc 5 20 $3.60 $1.20 $2.40 003-03100 Part Lot 15, Conc 5 30 $5.41 $1.80 $3.60 003-03000 Part Lot 14, Conc 5 127 $22.88 $7.63 $15.26 003-02900 Part Lot 14, Conc 5 900 $162.17 $54.06 $108.11 003-03700 Part Lot 15, Conc 5 620 $111.72 $37.24 $74.48 Elgin County Rd#45 1,502 $270.64 $270.64 $0.00 $0.00 $0.00 Totals 7076 $1,275.00 $334.79 $940.21 Drains/Adler Drain#1.xls 09/08/2005 B/e -?3 Municipality of Bayham Municipal Drain Maintenance Schedule Drain name Adler Drain Branch "B" Drain # By-Law# 1429 Date: 16-Apr-04 Engineer's Estimated Cost: $ 7,076.00 Repair Location: Outlet& Near Outlet in Lot#14, Concession#4 Assessment for Repair: 7,076 Costs for Repairs: $ 1,215.00 ($585+ $135 +$495) Roll Number: Lot& Concession: Repair Assessment: Repair$: Grant: Net Costs 002-14700 Part Lot 14, Conc 4 2,650 $455.02 $151.67 $303.35 002-15800 Part Lot 15, Conc 4 260 $44.64 $0.00 $44.64 002-15900 Part Lot 15, Conc 4 260 $44.64 $14.88 $29.76 003-03200 Part Lot 15, Conc 5 707 $121.40 $40.47 $80.93 003-03500 Part Lot 15, Conc 5 20 $3.43 $0.00 $3.43 003-03100 Part Lot 15, Conc 5 30 $5.15 $0.00 $5.15 003-03000 Part Lot 14, Conc 5 127 $21.81 $7.27 $14.54 003-02900 Part Lot 14, Conc 5 900 $154.54 $51.51 $103.02 003-03700 Part Lot 15, Conc 5 620 $106.46 $35.49 $70.97 Elgin County Rd#45 1,502 $257.90 $257.90 $0.00 $0.00 $0.00 Totals 7076 $1,215.00 $301.29 $913.71 Drains/Adler Drain.xls 09/08/2005 3/L / a _73 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name CHALK DRAIN Drain# 220 By-Law# 1056 d. June 5, 1939 Date: 11-Jan-05 Engineer's Estimated Cost: $1,710 Repair Location: Part Lot 15, Concession 4,Township of Bayham Assessment for Repair: 1,710 Costs for Repairs: $863A 3 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 008-05300 Part Lot 10, Conc. 2 10 $5.05 $0.00 $5.05 008-05200 Part Lot 9, Conc.2 35 $17.67 $0.00 $17.67 008-09700 Part Lot 9, Conc. 3 41 $20.69 $0.00 $20.69 008-05100 Part Lot 9, Conc. 2 50 $25.24 $0.00 $25.24 008-09600 Part Lot 9, Conc. 3 428 $216.03 $72.01 $144.02 008-09610 Part Lot 9, Conc. 3 10 $5.05 $0.00 $5.05 008-05000 Part Lot 8, Conc. 2 55 $27.76 $0.00 $27.76 008-05010 Part Lot 8, Conc. 2 5 $2.52 $0.00 $2.52 008-09500 Part Lot 8, Conc. 3 757 $382.10 $127.37 $254.73 008-09510 Part Lot 8, Conc. 3 10 $5.05 $0.00 $5.05 Bayham Road (Vienna Line) Flow 70 309 $155.97 $0.00 $155.97 Totals 1710 $863.13 $199.38 $663.75 Drains/Chalk Drain#220.xls 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name COOMBER DRAIN, BRANCH "A" TILE (CLOSED) Drain# 302 By-Law# 1330 Date: 11-Jan-05 Engineer's Estimated Cost: $4,800 Repair Location: Lot 9, Conc. 10, Bayham Township Assessment for Repair: 2,925 4,800 less 1875 Costs for Repairs: $1,711.51 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-12500 Part Lot 8, Conc. 10 77 $45.06 $15.02 $30.04 005-12501 Part Lot 8, Conc. 10 38 $22.24 $7.41 $14.82 005-12700 Part Lot 9, Conc. 10 1020 $596.83 $198.94 $397.89 005-12900 Part Lot 9, Conc. 10 735 $430.07 $143.36 $286.71 005-13000 Part Lot 9, Conc. 10 985 $576.35 $192.12 $384.24 005-13100 Part Lot 10, Conc. 10 40 $23.41 $7.80 $15.60 005-13200 Part Lot 11, Conc. 10 10 $5.85 $1.95 $3.90 009-01600 Trillium Railway Co. Ltd. $0.00 $0.00 $0.00 Bayham Road (Sommers) Btw Lots 10 & 11 20 $11.70 $0.00 $11.70 NOTE: Railway was a one time assessment of 1875 at time of Construction Totals 2925 $1,711.51 $566.60 $1,144.91 Drains/Coomber Drain,Branch A closed#302.xls 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name COOMBER DRAIN, BRANCH "A" TILE (CLOSED) Drain# 302 By-Law# 1330 Date: 07-May-04 Engineer's Estimated Cost: $4,800 Repair Location: Part Lot 9, Concession 10, Bayham Assessment for Repair: 1,055 4800 less 1872 Costs for Repairs: $405.00 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-13000 Part Lot 9, Conc. 10 985 $378.13 $126.04 $252.09 005-13100 Part Lot 10, Conc. 10 40 $15.36 $5,12 $10.24 005-13200 Part Lot 11, Conc. 10 10 $3.84 $1.28 $2.56 009-01600 Trillium Railway Co. Ltd. $0.00 $0.00 $0.00 Bayham Road (Sommers) Btw Lots 10&11 20 $7.68 $0.00 $7.68 Note: Railway was a one time assessment of 1875 at time of Construction Totals 1055 $405.00 $132.44 $272.56 Drains/Coomber Drain,Branch A closed#302.xls 09/08/2005 ,;32. D-0-0 6- Municipality Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Coomber Drain, Branch "F" Drain# 350 By-Law# 1330 Date: 11-Jan-05 Engineer's Estimated Cost: $1,200 Repair Location: Part Lot 9, Concession 10, Bayham Township Assessment for Repair: 1,200 Costs for Repairs: $1,806.66 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-12500 Part Lot 8, Conc. 10 333 $501.35 $167.12 $334.23 005-12501 Part Lot 8, Conc. 10 167 $251.43 $83.81 $167.62 005-12700 Part Lot 9, Conc. 10 500 $752/8 $250.93 $501.85 005-12900 Part Lot 8, Conc. 10 200 $301.11 $100.37 $200.74 Totals 1200 $1,806.66 $602.22 $1,204.44 DrainslCoomber Drain,Branch F#350.xls 09/08!2005 B/L- 5 . 03 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Coomber Drain, Branch "F" Drain# 350 By-Law# 1330 Date: 13-Apr-2004 Engineer's Estimated Cost: $1,200 Repair Location: Lot 9, Concession 10, Township of Bayham Assessment for Repair: 1,200 Costs for Repairs: $799.71 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-12500 Part Lot 8, Conc. 10 333 $221.92 $73.97 $147.95 005-12501 Part Lot 8, Conc. 10 167 $111.29 $37.10 $74.20 005-12700 Part Lot 9, Conc. 10 500 $333.21 $111.07 $222.14 005-12900 Part Lot 8, Conc. 10 200 $133.29 $44.43 $88.86 Totals 1200 $799.71 $266.57 $533.14 Drains/Coomber Drain,Branch F#350.xls 0910$/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Fasseel Drain, Branch "A" Drain # 542 By-Laws# 1982&2016 Date: 09-Sep-04 Engineer's Estimated Cost: $6,565.00 Repair Location: Part Lot 28, Concession 2&3, Bayham Township Assessment for Repair: 1,140.00 Costs for Repairs: $27.09 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant: Net Costs: Branch "A"Open 002-02900 Part Lot 28, Conc. 2 270 $6.42 $0.00 $6.42 002-11200 Part Lot 28, Conc. 3 130 $3.09 $0.00 $3.09 Elgin County Road#55 Bayham Norfolk Bdry 715 $16.99 $0.00 $16.99 Road betw Conc 2&3 Tunnel Line 25 $0.59 $0.00 $0.59 Totals 1140 $27.09 $0.00 $27.09 Drains/Fasseel Drain,Branch A Open#542.xls 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name: FAZAKAS-SLAUGHT DRAIN Drain# 550 By-Law# 1465 January 7, 1963 Date: 21-Apr-04 Engineer's Estimated Cost $ 1,165.00 Repair Location: South Part Lot 2, Concession 9 Assessment for Repair: 1,065 Costs for Repairs: $ 190.00 Roll Number: Lot&Concession: Repair Assessment: Repair$: Grant: Net Costs 005-00510 N 1/2 Lot 2, Conc 8 77 $13.74 $4.58 $9.16 005-01000 NW Pt Lot 2, Conc 8 460 $82.07 $27.36 $54.71 005-01100 NE Pt Lot 3, Conc 8 138 $24.62 $8.21 $16.41 County Road#44 (that portion that is Bayham Drive) 390 $69.58 $69.58 $0.00 $0.00 $0.00 Totals 1065 $190.00 $40.14 $149.86 Drains/Fazakas Slaught Drain#550.xrs 09/08/2005 6 /e. 5 - 073 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name: FREEMAN STORP DRAIN Drain# 600 By-Law# 1627 Year 1968 Date: 11-Jan-05 Engineers Estimated Cost: $ 6,598.00 Repair Location: Assessment for Repair: 4,949 Costs for Repairs: $ 7,794.64 Future maintenance of this drainage works shall be the responsibility of the Municipality of Bayham,and the costs of such future maintenance shall be borne by the properties assessed in the Engineer's Report dated September 26, 1968; and in the same relative proportions,except that the properties will not be assessed for benefit unless work is actually carried out on the tile drain on the property. Roll Number: Lot&Concession: Repair Assessment: Repair$: Grant: Net Costs 005-13100 S 1/2 Lot 10, Conc 10 1,750 $2,756.24 $918.75 $1,837.49 005-13300 S 1/2 Lot 11,Conc 10 282 $444.15 $148.05 $296.10_ 005-13400 SW 1/4 Lot 12, Conc 10 1134.55 $1,786.91 $595.64 $1,191.27 005-13500 SE 1/4 Lot 12,Conc 10 1116.8 $1,758.95 $586.32 $1,172.63 005-13700 SW 1/4 Lot 13,Conc 10 271.65 $427.85 $142.62 $285.23 $0.00 $0.00 $0.00 $0,00 $0.00 $0.00 _ $0.00 " $0.00 $0.00 $0.00 $0.00 $0.00 Bayham Road-Somers 394 $620.55 $620.55 $0.00 $0.00 $0.00 Totals 4949 $7,794.64 $2,391.36 $5,403.28 Note: Repair Assessment figures contained herein represent both Main Benefit Assessments&Drain Outlet Assessments. Drains/Freeman Storp Drain#600.xls 09/08/2005 /3iA4-0 s a 73 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Garnham Drain Drain# 610 By-Law## 2322 Date: 09-Sep-04 Engineer's Estimated Cost: 206 Repair Location: County of Norfolk Assessment for Repair: 206 Costs for Repairs: $126.20 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 004-13100 Part Lot 136, Conc 7 29 $17.77 $17.77 004-12900 Part Lot 136, Conc 7 147 $90.06 $90.06 County Road#38 5 $3.06 $3.06 Bayham Township Roads 25 $15.32 $15.32 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals 206 $126.20 $0.00 $126.20 Drains/Gamham Drain#610.xls 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name: HEDGES DRAIN Drain# 660 By-Law# 1618 October 7, 1968 Date: 13-May-04 Engineer's Estimated Cost: $ 3,600.00 Repair Location: North of Road, Lot#26, Concession#5 Assessment for Repair: 3,600 Costs for Repairs: $ 450.00 Roll Number: Lot& Concession: Repair Assessment:Repair$: Grant: Net Costs 003-08400 Part Lot 26, Conc 5 500 $62.50 $20.83 $41.67 003-12400 Part Lot 26, South Gore 1600 $200.00 $66.67 $133.33 003-12800 Part Lot 27, South Gore 950 $118.75 $39.58 $79.17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Bayham Road: Jackson Line 550 $68.75 $68.75 Totals 3600 $450.00 $127.08 $322.92 Drains/Hedges Drain#660.xIs 09/08/2005 "fr3/G P---0-0 S. - a 73 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Magyar Dieleman Drain Drain # 780 By-Law# 1464 Date: 06-Aug-04 Engineer's Estimated Cost: $ 2,833.35 Repair Location: Lot 4, Concession 8, Township of Bayham Assessment for Repair: 2,429.00 Costs for Repairs: $ 751.96 Roll Number: Lot& Concession: Repair Assessment: Repair$ Grant: Net Costs: 005-02010 Part Lot 6, Conc. 8 55 $17.03 $0.00 $17.03 005-02002 Part Lot 6, Conc. 8 55 $17.03 $0.00 $17.03 005-02003 Part Lot 6, Conc. 8 35 $10.84 $0.00 $10.84 005-01100 Part Lot 4, Conc. 8 811 $251.07 $83.69 $167.38 005-01700 Part Lot 4, Conc. 8 60 $18.57 $0.00 $18.57 005-01600 now 01100 Part Lot 4, Conc. 8 107 $33.12 $11.04 $22.08 005-01800 Part Lot 4, Conc. 8 238 $73.68 $24.56 $49.12 005-01800 Part Lot 5, Conc. 8 272 $84.20 $28.07 $56.14 005-01900 Part Lot 5, Conc. 8 136 $42.10 $14.03 $28.07 Bayham Road Eden Line 570 $176.46 $0.00 $176.46 Elgin County Road#46 Culloden Road 90 $27.86 $0.00 $27.86 Totals 2429 $751.96 $161.39 $590.57 Drains/Magyar Dieleman 2nd Drain#780.xls 09/08/2005 /z UD 5 _. 0-7 2 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name MEULLER DRAIN Drain* 700 By-Law# 1615 Date: 11-Jan-05 Engineer's Estimated Cost: $17,124 Repair Location: Lots 5&6, Concession 9 & 10, Bayham Assessment for Repair: $4,632.68 Costs for Repairs: $254.83 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-11309 Part Lot 5, Conc 10 27.17 $1.49 $0.00 $1.49 005-11311 Part Lot 5, Conc 10 27.17 $1.49 $0.00 $1.49 005-11313 Part Lot 5, Conc 10 27.17 $1.49 $0.00 $1.49 005-11315 Part Lot 5, Conc 10 27.17 $1.49 $0.00 $1.49 005-11500 S. Pt Lot 5, Conc 10 150 $8.25 $0.00 $8.25 005-11600 S. Pt Lot 5, Conc 10 150 $8.25 $0.00 $8.25 005-11700 Pt Lots 4&5, Conc 10 2550 $140.27 $46.76 $93.51 005-12000 S. Pt. Lot 6, Cone 10 50 $2/5 $0.00 $2.75 005-12100 Part Lot 6, Conc 10 50 $2.75 $0.00 $2.75 005-18400 cle3,Cci.Anby N. Pt Lot 6, Cone 9 50 $2.75 $0.00 $2.75 005-18500 N. Pt Lot 5, Cone 9 100 $5.50 $0.00 $5.50 009-01600 Trillum Railway Co. Ltd. 100 $5.50 $0.00 $5.50 Elgin County Road#46 Culloden Road 662 $36.41 $36.41 Bayham Road: Best Line Btw Cone 9& 10 662 $36.41 $36.41 Totals 4632.68 $254.83 $46.76 $208.07 Drains/Meuller Drain#790.xls 09/08/2005 / t'`' v 7 3 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Nelson Drain Drain# 830 By-Law# 1446 Date: 04-Feb-05 Engineer's Estimated Cost: 648 Repair Location: Part Lot 20, Concession 12, South-West Oxford Assessment for Repair: 648 Costs for Repairs: 95.11 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-12400 Part Lot 6, Conc 10 162 $23.78 $0.00 $23.78 005-12400 Part Lot 7, Conc 10 234 $34.35 $0.00 $34.35 Bayham Rd (Pressey Line) Part Lot 6, Conc 10 252 $36.99 $0.00 $36.99 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals 648 $95.11 $0.00 $95.11 Drains/Nelson Drain#830.xls 09/08/2005 &i - D ? 3 Municipality of Bayham Municipal Drain Maintenance Schedule Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Nevill Main Drain, Closed Tile Drain# 850 By-Law# 2313 Date: 31-Aug-04 Engineer's Estimated Cost: $49,100.00 Repair Location: Part Lot 21, Concession 1, Bayham Township Assessment for Repair: 22,840.00 Costs for Repairs: $315.00 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant: Net Costs: 001-05500 N. Part Lot 21, Conc. 1 9,200 $126.88 $42.29 $84.59 001-05900 W. Part Lot 22, Conc. 1 3,300 $45.51 $15.17 $30.34 001-06100 Pt Lots 22&23, Conc. 1 4,620 $63.72 $21.24 $42.48 001-05700 Pt Lots 22&23, Conc. 1 1,100 $15.17 $5.06 $10.11 Bayham Road Bet Lots 18& 19 Clarke Road 4,620 $63.72 $0.00 $63.72 Totals: 22840 $315.00 $83.76 $231.24 Drains/Neville Main Drain Closed Tile#8503ds 09/08/2005 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name NO. 1 DRAIN Drain# 880 By-Law# 1592 Date: 19 April 2004 Engineer's Estimated Cost: $47,015 Repair Location: Lot 125, Concession 6, Township of Bayham Assessment for Repair: $34,030.00 Costs for Repairs: $1,170.01 Roll Number: Lot& Concession: Repair Assessment:Repair$ Grant Net Costs 004-05000 Pt Lot 127, Conc 6 2,475 $85.09 $28.36 $56.73 004-05000 Pt Lot 128, Conc 6 2,445 $84.06 $28.02 $56.04 004-05000 Pt Lot 128, Conc 6 2,280 $78.39 $26.13 $52.26 004-04900 NE Pt Lot 128, Conc 6 50 $1.72 $0.00 $1.72 004-04802 N Pt Lot 127, Conc 6 10 $0.34 $0.00 $0.34 004-04801 N Pt Lot 127, Conc 6 25 $0.86 $0.00 $0.86 004-05001 N Pt Lot 127, Cone 6 25 $0.86 $0.00 $0.86 004-04601 N Pt Lot 127, Conc 6 10 $0.34 $0.00 $0.34 004-04700 N Pt Lot 127, Conc 6 10 $0.34 $0.00 $0.34 004-04701 N Pt Lot 127, Conc 6 10 $0.34 $0.00 $0.34 004-05900 N Pt Lot 128, Conc 6 10 $0.34 $0.00 $0.34 004-05800 N Pt Lot 128, Conc 6 10 $0.34 $0.00 $0.34 004-05700 N Pt Lot 128, Conc 6 15 $0.52 $0.00 $0.52 004-05602 N Pt Lot 128, Conc 6 10 $0.34 $0.00 $0.34 004-05600 N Pt Lot 128, Conc 6 15 $0.52 $0.00 $0.52 004-05500 N Pt Lot 128, Conc 6 15 $0.52 $0.00 $0.52 004-05400 N Pt Lot 128, Conc 6 10 $0.34 $0.00 $0.34 004-06100 N Pt Lot 129, Conc 6 6,670 $229.33 $76.44 $152.88 004-06200 Part Lot 129, Conc 6 10 $0.34 $0.00 $0.34 004-06100 Part Lot 130, Conc 6 6,940 $238.61 $79.54 $159.07 004-06400 Part Lot 131, Conc 6 910 $31.29 $10.43 $20.86 004-06600 Pt Lt 131&132, Conc 6 240 $8.25 $0.00 $8.25 004-10400 Part Lot 128, Conc 7 60 $2.06 $0.00 $2.06 004-10700 Part Lot 129, Conc 7 20 $0.69 $0.00 $0.69 004-11000 Part Lot 130, Conc 7 7,740 $266.11 $88.70 $177.41 004-11500 Part Lot 131, Conc 7 2,460 $84.58 $28.19 $56.39 004-11400 Part Lot 131, Conc 7 10 $0.34 $0.00 $0.34 004-11300 Part Lot 131, Conc 7 10 $0.34 $0.00 $0.34 004-11600 Part Lot 132, Conc 7 302.50 $10.40 $0.00 $10.40 004-11610 Part Lot 132, Conc 7 302.50 $10.40 $0.00 $10.40 CPR Trail 30 $1.03 $0.00 $1.03 County Road#38 Heritage Line 450 $15.47 $0.00 $15.47 Bayham Road between Lots 128 & 129 Tollgate Road 450 $15.47 $0.00 $15.47 Totals 34,030 $1,170.01 $365.82 $804.19 Drains/No.I Drain#880.xls 09/08/2005 13/L 71-) 5 ' 0-7 3 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name NO. 1 DRAIN Drain# 880 By-Law# 1592 Date: 30-Apr-2005 Engineer's Estimated Cost: $47,015 Repair Location: Lot 125, Concession 6, Township of Bayham Assessment for Repair: $34,030.00 Costs for Repairs: $225.00 Roll Number: Lot& Concession: Repair Assessment: Repair$ Grant Net Costs 004-05000 Pt Lot 127, Conc 6 2,475 $16.36 $5.45 $10.91 004-05000 Pt Lot 128, Conc 6 2,445 $16.17 $5.39 $10.78 004-05000 Pt Lot 128, Cone 6 2,280 $15.07 $5.02 $10.05 004-04900 NE Pt Lot 128, Conc 6 50 $0.33 $0.00 $0.33 004-04802 N Pt Lot 127, Conc 6 10 $0.07 $0.00 $0.07 004-04801 N Pt Lot 127, Conc 6 25 $0.17 $0.00 $0.17 004-05001 N Pt Lot 127, Cone 6 25 $0.17 $0.00 $0.17 004-04601 N Pt Lot 127, Conc 6 10 $0.07 $0.00 $0.07 004-04700 N Pt Lot 127, Conc 6 10 $0.07 $0.00 $0.07 004-04701 N Pt Lot 127, Conc 6 10 $0.07 $0.00 $0.07 004-05900 N Pt Lot 128, Cone 6 10 $0.07 $0.00 $0.07 004-05800 N Pt Lot 128, Conc 6 10 $0.07 $0.00 $0.07 004-05700 N Pt Lot 128, Conc 6 15 $0.10 $0.00 $0.10 004-05602 N Pt Lot 128, Cone 6 10 $0.07 $0.00 $0.07 004-05600 N Pt Lot 128, Conc 6 15 $0.10 $0.00 $0.10 004-05500 N Pt Lot 128, Conc 6 15 $0.10 $0.00 $0.10 004-05400 N Pt Lot 128, Cone 6 10 $0.07 $0.00 $0.07 004-06100 N Pt Lot 129, Cone 6 6,670 $44.10 $14.70 $29.40 004-06200 Part Lot 129, Conc 6 10 $0.07 $0.00 $0.07 004-06100 Part Lot 130, Cone 6 6,940 $45.89 $15.30 $30.59 004-06400 Part Lot 131, Conc 6 910 $6.02 $2.01 $4.01 004-06600 Pt Lt 131&132, Cone 6 240 $1.59 $0.00 $1.59 004-10400 Part Lot 128, Conc 7 60 $0.40 $0.00 $0.40 004-10700 Part Lot 129, Conc 7 20 $0.13 $0.00 $0.13 004-11000 Part Lot 130, Conc 7 7,740 $51.18 $17.06 $34.12 004-11500 Part Lot 131, Conc 7 2,460 $16.27 $5.42 $10.84 004-11400 Part Lot 131, Cone 7 10 $0.07 $0.00 $0.07 004-11300 Part Lot 131, Conc 7 10 $0.07 $0.00 $0.07 004-11600 Part Lot 132, Conc 7 302.50 $2.00 $0.00 $2.00 004-11610 Part Lot 132, Cone 7 302.50 $2.00 $0.00 $2.00 CPR Trail 30 $0.20 $0.00 $0.20 County Road#38 Heritage Line 450 $2.98 $0.00 $2.98 Bayham Road between Lots 128 & 129 Tollgate Road 450 $2.98 $0.00 $2.98 Totals 34,030 $225.00 $70.35 $154.65 Drains/No.- Drain#880.xls 09/08/2005 6/,t. 2..-.fir r_ ,.. f /9 Municipality of Bayham Municipal Drain Maintenance Schedule Drain name C.E. Smith Drain Drain# 1080 By-Law# 1764 Date: 02-Nov-04 Engineer's Estimated Cost: 436 Repair Location: Part Lot 20, Concession 12, South-West Oxford Assessment for Repair: 436 Costs for Repairs: 32.22 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 005-12400 Part Lot 6, Conc 10 162 $11.97 $0.00 $11.97 005-12400 Part Lot 7, Conc 10 90 $6.65 $0.00 $6.65 005-12500 Part Lot 8, Conc 10 72 $5.32 $0.00 $5.32 Bayham 112 Townline Road 112 $8.28 $0.00 $8.28 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Totals 436 $32.22 $0.00 $32.22 Drains/C.E.Smith Drain#1080.xls 09/08/2005 .. c 73 Municipality of Bayham Municipal Drain Maintenance Schedule Name of Drain: SMITH DRAIN Drain#: 707, Dec 2/1911, By-Law#: amended by 1605 amended June 3/68 Date: November 4,2004 Engineer's Estimated Cost: $27,255.84 Repair Location: Part Lot 11,Concession 10(Bayham) Assessment for Repair: $27,255.80 Costs for Repairs: $2,198.48 Roll Number Lot&Concession Repair Assessment Repair$ Grant Net Costs 005-17400 Part Lot 15,Conc 11 45.00 $3.63 $1.21 $2.42 87.5 006-17600 Part Lot 16, Cone 11 490.23 $39.54 $13.18 $26.36 88.5 005-13200 N1/2 Lot 11,Conc 10 4505.82 $363.44 $121.15 $242.30 005-13200 NW1/4 Lot 12,Conc 10 $0.00 $0.00 $0.00 005-13600 NE1/4 Lot 12,Conc 10 5899.31 $475.84 $158.61 $317.23 005-13600 NW1/4 Lot 13, Cone 10 $0.00 $0.00 $0.00 005-14100 NE1/4 Lot 13, Conc 10 2407.92 $194.23 $64.74 $129.48 005-14900 N1/2 Lot 14,Cone 10 6906.52 $557.09 $185.70 $371.39 005-16900 Part Lot 15, Conc 10 72.09 $5.81 $1.94 $3.88 005-16700 Part Lot 15, Conc 10 43.26 $3.49 $1.16 $2.33 005-16800". Part Lot 15,Conc 10 14.42 $1.16 $0.39 $0.78 005-16500 Part Lot 15,Cone 10 432.56 $34.89 $11.63 $23.26 005-16550 Part Lot 15,Cone 10 432.56 $34.89 $11.63 $23.26 055-16525 Part Lot 15,Cone 10 432.46 $34.88 $11.63 $23.26 005-16400 Part Lot 15,Cone 10 612.78 $49.43 $16.48 $32.95 005-16300 Part Lot 15, Conc 10 612.78 $49.43 $16.48 $32.95 005-16200 Part Lot 15, Conc 10 612.78 $49.43 $16.48 $32.95 005-16100 Part Lot 15,Conc 10 884.34 $71.33 $23.78 $47.55 005-16110 Part Lot 15,Cone 10 442.17 $35.67 $11.89 $23.78 005-15900 Part Lot 15,Conc 10 115.34 $9.30 $3.10 $6.20 005-16000 Part Lot 15,Cone 10 115.35 $9.30 $3.10 $6.20 006-14600 N1/2 Lot 16,Cone 10 1146.86 $92.51 $30.84 $61.67 006-14700 N Pt Lot 17, Cone 10 115.35 $9.30 $3.10 $6.20 009-01600 Trillium Railway 233.02 $18.80 $0.00 $18.80 Green Line: Between Bayham Township Road Conc 10&11 43.25 $3.49 $0.00 $3.49 Elliott Road: Between County Elgin Road#44 Lots 15&16 639.57 $51.59 $0.00 $51.59 Totals $27,255.74 $2,198.48 $708.20 $1,490.27 DrarnsfSmith Drain.xls 09/08/2005 /L 5 _ o73 Municipality of Bayham Municipal Drain Maintenance Schedule Drain Name Gilvesy Baldwin Drain Drain# 615 By-Law# 97-44 Date: 11-Jan-05 Engineer's Estimated Cost: 60,900 Repair Location: Part Lot 22, Concession 8, Bayham Township Assessment for Repair: 60,900 Costs for Repairs: 315.00 Roll Number: Lot&Concession: Repair Assessment: Repair$ Grant Net Costs 006-07600 Part Lot 8, Conc. 22 13,508 $69.87 $23.29 $46.58 006-20504 Part Lot 8, Conc. 22 116 $0.60 $0.00 $0.60 006-20500 Part Lot 8, Conc. 22 140 $0.72 $0.00 $0.72 006-20400 Part Lot 8, Conc. 22 230 $1.19 $0.00 $1.19 006-07028 Part Lot 8, Conc.22 1,468 $7.59 $0.00 $7.59 006-07032 Part Lot 8, Conc. 22 1,468 $7.59 $0.00 $7.59 006-07036 Part Lot 8, Conc. 22 1,468 $7.59 $0.00 $7.59 006-07024 Part Lot 8, Conc. 22 305 $1.58 $0.00 $1.58 006-07020 Part Lot 8, Conc. 22 305 $1.58 $0.00 $1.58 006-07000 Part Lot 8, Conc.22 396 $2.05 $0.00 $2.05 006-06700 Part Lot 8, Conc. 22 6,522 $33.73 $11.24 $22.49 006-06701 Part Lot 8, Conc. 22 1,748 $9.04 $3.01 $6.03 006-06702 Part Lot 8, Conc. 23 17,698 $91.54 $30.51 $61.03 006-07715 Part Lot 8, Conc. 23 140 $0.72 $0.00 $0.72 006-07710 Part Lot 8, Conc. 23 140 $0.72 $0.00 $0.72 006-07700 Part Lot 8, Conc. 23 420 $2.17 $0.00 $2.17 006-24801 Part Lot 8, Conc.23 280 $1.45 $0.00 $1.45 006-01800 Rail Trail Part Lot 8, Conc. 22, 23 2,210 $11.43 $0.00 $11.43 006-06700 New Street Part Lot 8, Conc. 22 4,543 $23.50 $0.00 $23.50 County Road#19 7,795 $40.32 $0.00 $40.32 Totals 60900 $315.00 $68.06 $246.94 DrainslGilvesy Baldwin Drain#615.xIs 09/08/2005