HomeMy WebLinkAbout04 - Port Burwell Harbour Inspection Port Burwell, Ontario
Harbour Inspection
November, 1996
by:
Architectural and Engineering Services
Public Works and Government Services Canada
Ontario Region
for:
Small Craft Harbours
Department of Fisheries and Oceans
Table of Contents
1. Summary . . . 1
2. Introduction 2
3. History and Background4
4. Inspection Procedures . 7
5. Observations From Inspection. 8
5.1 General8
5.2 Fisherman's Wharf8
5.3 East Side _ 9
5.4 West Side10
Appendix A: Visual Inspection Field Report11
Appendix B: Field Inspection Photographs (PWGSC and Watech). 21
Appendix C: Diver's Report _ 46
List of Figures
Figure 1: Port Burwell Harbour Layout Plan . . . . 3
Port Burwell, Ontario 1
Harbour Inspection
1. Summary
This report summarizes the procedures and observations of a visual inspection of Port Burwell
Harbour, excluding the East Pier, carried out by Public Works and Government Services Canada
(PWGSC) on November 28, 1996. An 82 m section,North portion of the East Pier, was
inspected on November 11, 1996 will also be summarized in this report.
The facilities on the East side of the harbour include the East Pier, shore wall protection along
Big Otter Creek, launching ramp, and fisherman's wharf.
The East shore wall was initially a timber sheet pile wall constructed in the early 1900's and
replaced in the 1950's and 1960's with an SSP wall. The East Pier was initially constructed in the
early 1900's as a timber crib structure and was reconstructed 20 years later with a concrete
superstructure. The Fisherman's Wharf was built in the early 1960's with minimal repairs
performed to date.
These facilities are generally in fair to good condition. The SSP walls have remained in good
condition, as well as the concrete copewall atop the SSP wall. The northerly 82 m portion of the
East Pier is in poor condition where the concrete is severely deteriorated. The timber crib
substructure has also experienced deterioration, excessive in some areas.
Similar to the East shore wall the West shore wall was also initially constructed in the early
1900's with a timber sheet pile construction. The wall was then replaced from 1930 to 1950 with
SSP. The West Pier was initially a timber structure built from 1895 to 1907 and replaced with a
reinforced concrete face wall atop a SSP wall in 1950. The West Concrete Breakwater was
started in 1911 and completed in 1914 as a concrete superstructure atop a stone filled timber
cribwork. Repairs were made in the 1920's when the inner and outer ends were reconstructed.
The Rubble Mound Breakwater was started in 1928 and completed in 1931 with the only repairs
performed in 1951. The lighthouse at the end of the breakwater was completed when the
breakwater was completed in 1931.
The SSP walls and concrete face wall has remained in generally good condition. The concrete
breakwater was experienced deterioration of both the concrete superstructure and timber
substructure.
Approximately 310 m (1017') of shore wall have been infilled with dredged material along the
shore wall protection.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 2
Harbour Inspection
2. Introduction
Public Works and Government Services Canada (PWGSC) was retained by Small Craft Harbours
of the Department of Fisheries and Oceans (DFO)to perform an engineering inspection of the
harbour at Port Burwell, Ontario.
The inspection included components of the harbour as follows:
• East Shore Wall, plus 82 m section of East Pier
• Fisherman's Wharf
• West Shore Wall
• West Pier
• West Concrete Breakwater
• Rubble Mound Breakwater
The underwater inspection was carried out by Watech Services Inc. for structures below the
water line as well as structures inaccessible from land, including the rubble mound breakwater.
The results from the diving inspection are included in Appendix C.
Figure 1 shows a reduced site plan for the harbour.
Public Works and Government Services Canada November 1996
Port Burwell,Ontario 3
Harbour Inspection
t
(
J
i e•
J
�I 4 FISHERMAN'S WHARF
1. 11JR_ EAST SHORE WALL
WEST SHORE WALL c 1 .W
14 i ill
<, l
WEST PIER i)' IR
II
EAST PIER
1
1 i
r
CONCRETE BREAKWATER
4
/1
1I i RUBBLE MOUND BREAKWATER
FIGURE 1: Port Burwell Harbour Layout Plan
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 4
Harbour Inspection
3. History and Background
Port Burwell is located in Elgin County, in the Township of Bayham, on the North shore of Lake
Erie, at the mouth of Big Otter Creek. The federal property at Port Burwell Harbour is under the
administration and control of Small Craft Harbours of the Department of Fisheries and Oceans.
The harbour was formed in 1832 with the incorporation of the Port Burwell Harbour Company.
The following paragraphs highlight the history of the various structures proceeding from North
to South with the East side structures identified first. Each section is identified by letter which is
used to establish a cross reference with the As Built Drawings.
Section A, along the East shore of the inner harbour, was a 92.2 m (302.4')timber sheet pile wall
constructed in 1903-04 until it was reconstructed to a 51.8 m (169.9') steel sheet pile (SSP) wall
in 1994 by the Conservation Authority.
Section N, directly South of the previous section, is a 54.4 m (178.5') SSP wall with a reinforced
concrete cap all secured to a continuous reinforced anchor wall in the rear. Initially a timber
sheet pile wall, harbour repairs and improvements replaced the timber sheet piling with SSP in
1960.
Section B, South of Section N, is a 100.2 m (328.7') long SSP wall secured in the rear to a
continuous reinforced concrete anchor wall. Completed in 1950-51 the SSP wall replaced the
timber sheet pile wall initially constructed in 1903-04.
A car ferry slip was built in 1906 at the South end of the previous section when the timber sheet
pile wall was present. The slip was constructed by C.P.R. Company and still present in 1959, as
can be seen in some plan drawings. The ramp has since been removed and replaced with as SSP
wall, although no record of the construction can be found.
There is no structure currently present between the ferry slip and the North end of the East Pier,
although face piling was constructed by C.P.R. along the 134 m(439.5') length in 1909.
An 82 m (269')portion at the North end of the East Pier was originally constructed in 1904 as a
timber crib structure. Similar to the rest of the East Pier, but under a different contract, the 82 m
(269') length of pier was reconstructed to a concrete superstructure atop the timber substructure
in 1925-26. Only minor repairs have been performed to date.
A fisherman's wharf was constructed, in 1962, approximately 230 m(754')North of Section A
along the shore of the creek. The wharf is a creosoted timber superstructure on timber bents,
54.9 m (180') long and 3.7 m (12') wide, with a timber approach ramp and a timber ice fence.
The only repairs to date were the replacement of diagonal timber fenders with vertical timber
fenders.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 5
Harbour Inspection
Section E,Northern most section of shore wall on the West side, was initially a timber piling
structure built in 1903-04. It was reconstructed in 1948-49 to a 197.7 m (648.4') long SSP wall
secured to a continuous concrete anchor wall in the rear.
Section F, constructed initially with timber piling in 1903-04, was rebuilt in 1934-35 with a
112.1 m (367.6') concrete face wall supported on the timber sheet piling and round piles and
secured to anchor piles in the rear. Since 1985 dredging operations in the harbour have covered
over approximately the end 85 m of this section of shore wall.
Section Q, directly South of the previous section and similarly constructed of timber piles in
1903-04, was rebuilt in 1966. Section Q, now entirely buried by the infilling of dredged
material, is a 77.7 m (254.9') long SSP wall secured to SSP anchor piles in the rear.
Section G, directly South of Section Q to the end of the shore wall, was initially a stone filled
timber crib construction with timber superstructure, built from 1895-1903 and 1906-07. Various
repairs were made to maintain the timber structures throughout the years of 1914-17, 1924-26,
1929-30, and 1937-38. These repairs included renewing decking and face timbers, placement of
18 timber pile clusters, and in some locations reconstruction of the timber from the water level
up. The section was entirely reconstructed in 1950-51 with a 505.5 m (1658') long SSP wall
with reinforced concrete face wall superstructure all secured to a continuous reinforced anchor
wall. The work involved the entire removal of 82.3 m (270') and removal of 266.5 m (874') of
superstructure of stone filled timber cribwork and the erection of the SSP wall with concrete
superstructure. In 1966-67 reconstruction of a 75 m (246') length of West wall took place and
was the only major construction project instituted to date. An approximate 145 m length, from
the beginning of the section and South, was covered with dredge material during dredging
operations since 1985.
Section J, an 87.2 m (286') long rubble mound, was constructed in 1926-27 between the South
end of the West Pier and the North end of the West Concrete Breakwater. The wall was initially
a timber pile wall built in 1912-13, with repairs made between 1914-17, until the construction of
the rubble mound wall in 1926-27. Repairs to the rubble mound were made in 1928-29 with no
other repairs performed to date. The rubble mound has since grown over with soil and
vegetation and there is presently no noticeable evidence of the rubble mound wall.
Section K, started in 1911-12 and completed in 1913-14, is a 365.9 m (1200') long mass concrete
superstructure supported on stone filled timber cribwork. Repairs were made in 1922-23 when
the inner and outer ends of the breakwater were rebuilt, and in 1924 when 33.5 m (110') of
breakwater near the South end was rebuilt. No other repairs have been made to date.
Section L, is a 547.3 (1795') long rubble mound breakwater, Easterly from the South end of the
concrete breakwater then bending South. It was started in 1928-29 and completed in 1930-31,
with the only repairs performed in 1951-52. These repairs consisted of replacing approximately
1230 tons of armour stone over a total distance of approximately 33.5 m (110') at the outer end of
the breakwater.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 6
Harbour Inspection
Section M, located at the South end of the rubble mound breakwater, is a 12.2 m (40') by 12.2 m
(40') headblock for the support of a lighthouse. It is a mass concrete superstructure supported on
a stone filled timber crib completed in 1930-31. Only minor repairs have been made to the
lighthouse base in 1958.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 7
Harbour Inspection
4. Inspection Procedures
The field visual inspection was performed by PWGSC on November 28, 1996. The inspection
was completed by Peter McAllister, BEng. and David van Reenen. The inspection included
visual checking for concrete and sheet pile deterioration.
The northerly 82 m portion of the East Pier was inspected on November 11, 1996 and completed
by Brian Riggs, P. Eng., Peter McAllister, BEng., and David van Reenen. The inspection
included visually checking for concrete deterioration and chain dragging the structural concrete
deck to determine areas of delamination.
Chainages were marked on the harbour structures. Station 0+000 was denoted at four specific
locations to allow for ease of chaining and inspection detailing. The four locations selected for
Station 0+000 were marked at the North limit of the Fisherman's Wharf, the North limit of SSP
construction on the East side, the North limit of SSP construction on the West side, and the
North limit of the concrete breakwater.
The North limit of the East Pier was also marked as Station 0+000, but was done so when the
inspection was conducted on November 11, 1996.
The Field Photographs for the above water inspection can be found in Appendix B. The diver's
report can be found in Appendix C.
Water depth soundings were taken by the diving team at 25 m intervals along the structures to
document water depth and suspected areas of scour. The water depth soundings, reported on
Tables 1-3 of Appendix C, are reduced relative to IGLD chart datum for Lake Erie.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 8
Harbour Inspection
5. Observations From Inspection
5.1 General
The facilities at Port Burwell Harbour are typically in fair condition. The structures on the East
side range from poor to fair condition with the greatest deterioration present on the East Pier.
The shore wall is SSP which is in good condition. A section of wall has a concrete cap which
has also remained in good condition. The fisherman's wharf is also on the East side and is in
good condition.
The structures on the West side are generally in fair condition except for the concrete breakwater
which is in poor condition. The shore wall on the West side is both SSP and timber sheet piling
with concrete face walls. Both types of sheet piling have remained in fair condition. The
concrete face walls have also remained in fair condition with the greatest deterioration occurring
along the first section of face wall. The rubble mound breakwater is generally in fair condition
with no signs of excessive deterioration.
5.2 Fisherman's Wharf
Section 0 (0+000 to 0+054.9)
The fisherman's wharf has remained in good condition with no signs of rotting of the timber
decking or piles. All the timber substructure has been creosoted.
All bollards are in place with no damage present.
The only significant damage is the missing or loose fenders. A number of fenders have been torn
off or removed and are considered missing. The fenders were considered missing from the
evidence of a support bolt head still showing. The As Built Drawing of the structure does not
give specific locations for the vertical fenders, therefore, the remaining bolt heads are the only
visible evidence of a missing fender. A few other fenders have been damaged and remain
attached to the wharf.
Electrical outlets were installed along the West edge of the wharf. The outlets are connected to
the power supply across a beam to East side of the wharf The supply box, located on shore, is
plywood construction and is secured with a padlock.
There is no timber curb present along the edges of the deck except for along the East edge.
Access to the wharf is via a ramp which is in good condition with no signs of rotting.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 9
Harbour Inspection
Section P; Ice Fence
The ice fence is generally in good condition and shows no signs of rotting. Two fenders are
missing while another three are damaged. The support posts are creosoted and exhibit no signs
of rotting.
5.3 East Side
North of Section A is a launching ramp and refueling station, and small timber boardwalk. No
records of their construction were found in PWGSC files and it appears that they were not
constructed by the Federal Government. The launching ramp is 9.6 m wide and the concrete
surface has deteriorated. The fuel tank North of the launching ramp has an approximate capacity
of 2300 L. The tank, containing unleaded gasoline, is in a rectangular containment unit that
shows no visible signs of cracks or deterioration. A 50 mm (2") threaded drain hole is located in
the base of the containment unit but no drain plug is present, which allows rain water to drain but
would also allow a fuel spill to escape. An environmental compliance audit was not within the
terms of reference for this report.
Section A(0+000 to 0+051.8)
Section A is a SSP which is in good condition and has remained straight and plumb. No anchor
or wale bolts appear to be missing from the section. No excessive damage or wearing is
noticeable and all joints remain tight.
Section N (0+051.8 to 0+107.3)
The concrete cap in this section is in good condition and has remained relatively level with no
excessive wearing or cracking. The SSP wall is in good condition and has remained straight and
plumb with no signs of bent sections or puncture holes. Soil and vegetation has grown over a
portion of the cap, therefore, the width of the cap cannot be confirmed. The joint between
Section N and B appears to be solid with no loss of material from behind the joint.
Section B (0+107.3 to 0+207.5)
The SSP wall is in good condition with no signs of damage or loss of anchor bolts and has
remained straight and plumb.
At the end of Section B there is a slight jog in the wall then the construction of a SSP wall which
replaced the ramp used for the ferry slip. The wall is poorly constructed resulting in a loss of fill
material from behind the wall at the joint with the previous section.
There is no structure evident between the SSP wall at the ferry slip and the beginning of the East
Pier. The shoreline is overgrown with vegetation and is slightly eroded. The steel fender railing
along the shoreline has been bent and damaged.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 10
Harbour Inspection
An electrical supply box is enclosed in a plywood constructed box that is damaged leaving the
supply box, wires, and outlets exposed.
East Pier (0+000 to 0+082)
The 82 m portion of the East Pier, not included in the East Pier Evaluation, is generally in poor
condition. The concrete deck has become entirely deteriorated, resembling gravel, exposing the
rebar in several places. The delaminated and deteriorated concrete continues down along the
West edge of the pier. The substructure of the pier, stone filled timber crib, is in fair condition.
The timber members are generally in sound condition, however,there is fill loss and voids
behind the timber members.
The timber pile clusters along the edge of the East Pier are rotted above the water line and offer
minimal functional purpose.
5.4 West Side
Section E (0+000 to 0+189.5)
The SSP wall in this section is generally in good condition with no signs of excessive damage or
deterioration. Minor fill loss is apparent around outfall pipes and joints in the structure.
Several posts have been installed along the edge of the wall. These posts are uncapped and could
be a possible hazard_ A small diameter rod has also been installed at the edge of the wall. Being
a rod of small diameter and also quite short, the rod is a potential hazard. Smaller steel bollards
are located along the section of wall.
A slight bowing of the wall has occurred from the corner, and South for approximately 10 m,
where the wall changes direction. Along this same location there has been a loss or settlement of
the material beneath the steel cap. There has been a slight loss of material from behind the wall
at the joint between the SSP wall of Section E and the concrete face wall of Section F. Fill loss
has also occurred around a few of the outfall pipes and at some of the joints in the wall.
Section F (0+189.5 to 0+302)
The concrete face wall along this section is generally in fair condition with most of the damage
or deterioration occurring near the infilled area. The face of the concrete copewall near the start
of the infilled area is quite damaged and deteriorated. The steel rail initially embedded in the
concrete has been torn out leading to additional deterioration and spalling of the concrete. The
rebar has also become exposed due to the loss of concrete. The remainder of the wall cannot be
inspected due to the infilling of the channel next to the wall.
There are steel bollards along the top of the wall at approximately 30 m intervals beginning at
Station 0+225. The infilled material has since grown over with vegetation.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 11
Harbour Inspection
Section Q (0+302 to 0+380)
This section of shore wall cannot be inspected as it is entirely covered with the infilled dredge
material. There are several locations where the material has settled or washed out between the
infilling and the existing wall. These washouts are a possible trip hazard for public who are
walking in the area.
Section G (0+380 to 0+886)
The initial 145 m length of this section of wall could not be inspected as it is also covered with
the infilled dredge material. A beach has developed at the end of the infilled area, approximately
perpendicular to the wall.
There are several timber pile clusters along the remaining length of wall. All pile clusters have
rotted above the water line and offer minimal functional use.
The concrete wall is in generally fair to good condition with the majority of deterioration
occurring at the water line and along the top edge of the wall. The wall has also remained
straight and plumb. A chain link fence is used to delineate the limits of the private property for
'Pembina'.
Bollards are located along the length of the wall. Soil atop the deck of the wall prevents the
measurement of the deck width. The concrete face wall has remained in generally good
condition with no signs of damage or major deterioration.
A pipe, approximately 0.1 m in diameter, outlets to the channel is located through the top of the
wall at Station 0+881. The pipe is an outlet from the pollution control plant which is next to the
channel and enclosed with chain link fencing.
Section H (0+886 to 0+895)
Extending 9 m from the end of the pier, exposed and heavily damaged and deteriorated, is a
stone filled timber crib. There has been a loss of the stone fill as well as excessive damage and
loss of members in the crib construction.
A timber pile cluster, rotted above the water line is located at the Southeast corner of the timber
crib. It is quite damaged and offers little purpose.
Section J; Rubble Mound Wall
There is no evidence of an existing rubble mound wall between the West Pier and the concrete
breakwater. The area is grown over with soil and vegetation and inspection was not conducted.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 12
Harbour Inspection
Section K (0+000 to 0+338)
The concrete is generally in poor to fair condition. The concrete has deteriorated between the
joints in the breakwater and the timber substructure is reported to be in poor condition,
Deterioration of the concrete has occurred along the base of the wall and there is generally
horizontal cracking along the face of the wall. Delamination of the concrete is also present along
the base. The concrete blocks at the base of the wall have become heavily worn at the corners.
Efflourescence and freeze thaw damage is also present in some locations along the length of
wall.
A timber boardwalk is constructed on the top of the breakwater. A handrail and benches are
attached to the West side of boardwalk and breakwater. The handrail is not very sturdy and can
be easily wobbled. The benches are generally sturdy with no signs of damage or rotting. One
bench is missing while another has fallen. There are no handrails constructed between the
benches. Stairs have also been constructed offering access to the West beach. The deck surface
of the breakwater becomes exposed near the end of the breakwater.
The deck surface of the breakwater is in generally good condition with no excessive cracking or
deterioration. Settlement of the breakwater has occurred at Station 0+250, resulting in a shift of
the breakwater sections. There is severe deterioration and loss of concrete of the blocks at the
base of the wall.
The headblock at the South end of the breakwater has been subject to some deterioration and
wearing. Severe wearing along the base of the headblock has occurred, on the South side. The
top edge of the headblock is also wearing. There is deterioration and loss of concrete at the joint
between the lighthouse and the headblock along the South edge. The lighthouse is in generally
good condition with no signs of damage or excessive deterioration.
The timber crib substructure is generally in poor condition. There are several timbers missing
and deteriorated along the length of the breakwater. Only the top two timbers of the cribs remain
exposed above the lake bottom. Therefore, it is unclear if the remaining timbers are as
deteriorated as those exposed. The concrete below the water surface is in poor to fair condition
with several locations of heavily eroded and spalled areas.
Section L; Rubble Mound Breakwater
The offshore breakwater is in generally fair condition. The construction has remained relatively
level and consistent over its length. Some shattering and cracking of the armour stone has taken
place but is not considered excessive. In some areas the core stone has become visible.
The toe of the slope varies quite significantly across its width. The irregularities could be present
as constructed, but appears to have resulted at a later time. The variations in the slope have not
caused excessive settlements to result except along the West edge near the second deflection of
the breakwater.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 13
Harbour Inspection
The substructure for the lighthouse, at the South end of the rubble mound breakwater, could not
be inspected as it was buried in armour stone. The base for the lighthouse appears to be in fair
condition and has remained generally level.
Public Works and Government Services Canada November 1996
tl
tl
Appendix A
Visual Inspection Field Report
141 Public Works and Travauxpublics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT
Location: Port Burwell, Ontario Date Inspected:
96/11/28
Site Name: Port Burwell Harbour Sheet:
Structure: Fisherman's Wharf 1 of 8
Station Description Photo No.
0+000 - damaged vertical fender
0+006 - vertical fender missing
0+009.6 - electrical outlet installed on West edge
0+014 - vertical fender missing
0+017 - vertical fender missing
0+019.0 - electrical outlet installed on West edge
0+021.5 - vertical fender missing
0+023.4 -vertical fender missing
0+025.7 - vertical fender missing
0+028.4 -vertical fender missing
0+030.6 - electrical outlet installed on West edge
0+038 -plywood box containing propane tank; East side
0+042.1 -vertical fender missing
0+044.1 -vertical fender missing
0+046.6 - damaged vertical fender
0+048.4 -vertical fender missing
0+050.3 - electrical outlet installed on West edge
0+052.5 - beam from shore to East side of dock; access for power supply to
electrical outlets
0+053.5 -vertical fender missing
Public Works and Travaux publics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT Date Inspected:
Location: Port Burwell, Ontario 96/11/28
Site Name: Port Burwell Harbour Sheet:
Structure: East Side 2 of 8
Station Description Photo No.
0+026 - loss of material from behind the SSP 7
0+051.8 -joint between Section A and Section N; slight loss of material 8
from behind joint
0+084 -beginning of remnants of timber fender structure along wall at 9
water level
0+107 - end of remnants of timber fender structure
0+107.3 -joint between Section N and SSP wall of Section B
0+129.7 - bollard
0+136 - electrical supply box; no protective face cover leaving wires 10
exposed
0+145 - bollard
0+156 - loss of material from behind the SSP 13
0+160.8 - bollard
0+176.2 - bollard
0+207.5 - end of Section B, ferry slip begins 14
- loss of material from behind the wall at the corner 15
0+210 - end of extension to wall, SSP wall replacing the ferry slip ramp 16
0+246 - concrete bollard on shore 17
0+274 - concrete bollard on shore
0+282 - beginning of steel fender railing in water near water's edge 18
0+297.5 - concrete bollard on shore
0+326 -timber pile bollard on shore 19
0+338 - end of steel fender railing
0+340 - electrical supply box attached to hydro pole 20
141 Public Works and Travaux publics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT Date Inspected:
Location: Port Burwell, Ontario 96/11/1I
Site Name: Port Burwell Harbour Sheet:
Structure: North 82 m portion of East Pier 3 of 8
Station Description Photo No.
0+000.5 -timber pile cluster
0+002.6 - bollard
0+022.1 - bollard; cracked
0+028 -timber pile cluster
0+042 - bollard
0+050 -rebar exposed on deck surface; possible trip hazard
0+058 -timber pile cluster
0+061 - bollard
0+062 -beach shoreline on East side of pier
0+069 - bollard
0+080 - bollard
' Public Works and Travaux publics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT Date Inspected:
Location: Port Burwell, Ontario 96/11/28
Site Name: Port Burwell Harbour Sheet:
Structure: West Side 4 of 8
Station Description Photo No.
0+082 - electrical outlet
0+084.5 - slight damage to SSP wall; dented with no puncture holes
0+085 - uncapped steel tube post; possible hazard
0+088 - electrical outlet •
0+090 -uncapped steel tube post; possible hazard 26
0+091.5 - slight damage to SSP and ladder
0+095 -uncapped steel tube post; possible hazard
0+102 -bent steel plate along top of SSP
- change in direction of wall; slight bowing of the wall 27
0+119 - two concrete bollards; 1 m and 12 m from edge of wall
0+129 - loss of material from behind SSP wall 29
0+139.5 - steel fence post approx. 0.5 m from edge; slight damage to steel
cap
0+150.5 -uncapped steel tube post; possible hazard
0+159 - small diameter steel rod approx. 1 m from edge; possible hazard
- concrete bollard approx. 12 m from edge of wall
0+186 - loss of material from behind SSP wall
0+189.5 -joint between SSP wall of Section E and concrete face wall of 30
Section F
0+191.5 - large material loss behind concrete face wall
0+203 - start of damage to face of concrete wall; steel rail embedded in 31
concrete has been torn out
0+211.5 - excessive damage to face of concrete wall; rebar exposed
141
Public Works and Travaux publics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT Date Inspected:
Location: Port Burwell, Ontario 96/11/28
Site Name: Port Burwell Harbour Sheet:
Structure: West Side 5 of 8
Station Description Photo No.
0+212 - end of damage to face of concrete wall
0+217 - infilling of channel next to face wall begins 32
0+225 - beginning of steel bollards spaced approximately 30 m apart 33
0+302 - end of Section F; approximate beginning of Section Q
0+380 - approximate end of Section Q and beginning of Section G;
infilling continues
0+395 - concrete deck of Section G exposed
0+397 - change of bollard type
0+472 - change of wall direction; widest point of infilled area(63 m)
0+525 - end of infilling; concrete face wall exposed 34
0+542.5 -timber pile cluster; rotted above water line
0+565.5 -North limit of private property; denoted by chain link fence 35
0+574 -timber pile cluster; rotted above water line
0+612.5 -timber pile cluster; rotted above water line
0+636.5 -timber pile cluster; rotted above water line
0+675 -timber pile cluster; rotted above water line
0+695 -timber pile cluster; rotted above water line
- chain link fence denoting South limit of private property
0+702 - concrete missing from along top edge of wall
0+742 -timber pile cluster; rotted above water line
- change of direction of wall
0+765.5 -timber pile cluster; rotted above water line
0+795.5 -timber pile cluster; rotted above water line
+' Public Works and Travaux publics et
Government Services Services gouvernementaux
Canada Canada
VISUAL INSPECTION FIELD REPORT Date Inspected:
Location: Port Burwell, Ontario 96/11/28
Site Name: Port Burwell Harbour Sheet:
Structure: West Side 6 of 8
Station Description Photo No.
0+826.5 - timber pile cluster; rotted above water line
0+855.5 -timber pile cluster; rotted above water line
0+857 - start of damage to top edge of concrete face wall
0+859.5 - end of damage to top edge of concrete face wall
0+881 - approx. 0.1 m diameter pipe outlets to channel through top of 36
concrete wall
0+884.5 -timber pile cluster
0+886 - end of Section G; start of Section H 37
0+895 - end of timber crib construction of Section H; heavily damaged 38
and deteriorated
-timber pile cluster
Appendix B
PWGSC and Watch Services Inc.
Field Inspection Photographs
Port Burwell, Ontario Sheet 1 of 23
Field Inspection Photograph
wk 1 ',°dt
7 f„,„___ ,„;„.. . _
--------.__ 4.1,....„ _ .„ . , __ __ ,...._ _ ,, ,
- --,.-„a,-_,. , 7 -—-- -,_-.., - :14,--- _
-o �''.. -: ." cti '. 'ice'•_
PY • .t y 11 %, � - _ _
Photo No. , ll cripdon: call }de 11 ill Feilierman's Wharf
-- ---/
-Riequwiiiiuippo
. _ Ilk
._ 'Ai
s
11101•
I ,)5
AO ill •
i
• _ _ -+rte#
• 1 _
I!' . .
r
,
_ _ f
. iir-_ ---
Photo No. 2 Description: View of Ice Fencefacing North North side o isherman'sWharf__
Public Works and Government Services Canada
Port Burwell, Ontario Sheet of 23
Field Inspection Photograph
dl,. r —
_
! _
-,. .' I
* ' . ";
1)
1 , _ . co
l 41
P Air
tj
- i
Photo No. 3 Description: Fuel tank with containment unit and pump
_
• - I r, y w 1
N ,
. ,_ J-* L r. ta, ' .1 a ,.
'f -Mil
.. —
Magi i
; --
a" _: a i.
-_
r —
}•,
Photo No. 4 Description: Launching Ramp; East side of harbour, facing North
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 3 of 23_
Field Inspection Photograph
I
Itcii
1 r IIS
r
fC
1 ��rr''=4 • :I
gaa1p
d
I
t
Photo No.5 Description: t side;Sec.i n.A_ facing No
Zt
1 w yy' ]
y•
IL J f: M Sr }4 yy , *r 4
jl 7 — F M t b i J, • • •
•
Photo No. 6 Description: Typ al viemQ150 mm outfall pipee; Cations 0+Q00.5. 0+ 09.5.
0+034.7, 0+043.8
Public Works and Government Services Canada
Port Burwell, Ontario Sheet of 23
Field Inspection Photograph
�. _
I
,,,,, - 1
R _ N
f.,
,3'
i
1
Photo No._/Description: Station 0+026 loss of material from behind SP; East side _
3
1 ' '
ii
ii- ��
i
i' r +fit F
li * 1
111,1
10.11
4,y =I
4'21-
- - _
Photo No.�Descxi tion: S n 0+ 5� a =i SP 1.
l? t • ter
Public Works and Government Services Canada
Port Burwell, Ontario Sheet of 23
Field Inspection Photograph
•
A •.
4 ...1
I
•M1. f,. I i __fit
I; 1 7i '' 11 r _ _
1 0 7 Y ijill .
—
m, - •-...--
. L
- 41111r --.0'4..-...- :--- -- -J
Photo No.! Description: iorated timl raider along SSP on East side
-1 .f vY �4 Yom _ M # _ -tot T.
+a ,, +t T. 6
� ;,'�, Y �Y � '�°�y f' - � 41e�� �.t�4 V
�� t3 ;yh � 1�-; '-
�y ` ", , tib 4,'. .1 --4 x *. Y1 - �+
4th ;, -....:••••:,
�F. d , . .,
,r
i P fi ,4 gR T `
QM, 41 1 `, _ � _1 -
• Y
4w i _
.P i; •'Y %}w aI , a 'VI;- '- ._'-tit. _'+b P' =4 —;ti.----"-
_ Y4-
,
w
P5 A' 1.,_ . 41.w -0.MP3 [. -%:_ f..•.•I' .{. P s , -
vcZ'' ,. .1 ,yam w'�'A..
{ 1.s., xi47. segs r, 0 r,F 1, ; -
,r ar .,i' ' +tk.-41.1r9111.0 ?,a ;! nt._'f f l n' i44 '#e ...+ S J `I-t� `" .s r
, h •Y1 I °0 t r• +a ,y ,--N-4!.5`
'x' r r': 7+!F :'-7*•r t r 5 _ "'Y,." -• 1
r �I � S L tirl'...::-.%;, } a Al 1
P?r f try Y�� - y,,�' yY ii s '9 ,,, [}1 ; a� Y `
P 0+ 'fes tev,',4s { ,_, :: :•i"k G •FiSr. Y Id " }x s Y . I A'T
k 1 ) F { �1 4 �..Alt 40•AC x,i s 4 +a ! ? a Ja "'., ,�� rt..-
r�
1 v 1 Y .i14 a `j1 "ilk i . ..x f j4 f 1 z✓.. x,r f_. JY�I
.x6 #t ., „.., '�" . tYzo) .i *'2,-..:::sl y " "~
Photo No. 10 Description: Station 0+136, damaged electrical junction box; East side
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 6 of 23
Field Inspection Photograph
t — -� -----,;
1, ,, �� li
- �.f3
S
frotir ,___
l
' 1' - -
F0.- t� --
i
- - iia
Photo No. 11 Description: Station 0+104.7, elliptical outfall(450x400 mm)made to fit into
inpan
y '. -{ .t. s.
lit .4
II
s,..0 I_ -
i
_his -,
r _' we
F
i
i
ii
A
W ,,
1'
Y
Photo No. 12 Description: Station 0+104.7, change in sheeting:joint is good underwater
Public Works and Government Services Canada
Port Burwell, Ontario Sheet_7_of 23
Field Inspection Photograph
_— i
i '• _ - -•+ ,
ileF4. - ` i 4, 'i_ i Q• 1., ~ .! `
t
. s� rt
r
a1
e'
f '�..;
� '....d.
* - P
rto
` ; 1
IL
f - * t -
r r
€' 16t
say
Photo No. 13 Description: Station 0+156, fill loss from behind SSP;East side
i 7.
f t .g,py7 �ra z., I
.m
,rl
9 d
11.
may_
1 - - " "` `- R . -r b - =,
r
1
. -
Photo No. 14 Description: End of Section B, former location of ferry slip
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 1 of 23
Field Inspection Photograph
----- - _ -
yfi4 "p.- ..,.r 411'Y.!! ! F. .tii.,". - ..
t# E .. - -i.�`, #, I ta' .v� �, ' ,gyp
r r' _' .
Y a.r! 41 r T. — r
- i. at b E. a 1r. }lij t* v."
itz
!I 4 `�� s IE
_ 1
I V . i
. 1 • 1i41/ d ` �I h
1
111,1 1IR ;.
4\
,, -
f .. ... .
elit . 0 Oaf :rrif.11,' a 1,4"0.','11 ,
`..--jur • . • ,
' 5 �� ��I �+.1
Photo No. 15 Description: Loss of material from behind SSP at ferry slip --^
4
Ftp '
f' f �r -
ti' yyf d ^1
•
i.
y i
u ) `
kl.''' flftirirt ii - '--.- , i
u liti _
Photo No. 16 Description: SSP wall constructed to replace ferry slip
Public Works and Government Services Canada
Port Burwell, Ontario Sheet of 23
Field Inspection Photograph
R l 4 I
x ; '-^"{}��Y 1..i Nis - i,- .v
p
i; Y
_ -‘,2 'x ,-, 4
X
+ ;...%
. Y
! y
•' I
l 'fill
� -.4 .',"*'�`01
•
-F4+- - 2.
-- _ «
Photo No. 17 Description: Concrete bollard on shore; East side
4
R Y
_e
li
Z i
1 s {4Y.,. I
l 1'in .X} ..rt iWM}.
�*L. ....%r....,
t r.
i.
1v. ��SIF ��! 14-...
' , �" :,a
iti
tikj ire.
ti -
Photo No. 18 Description: Steel fender railing along shore South of ferry slip
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 10 of 21
Field Inspection Photograph
1
.,.... i 7.1;!..-7 •' -
:el," 4Al,°•-•'"::,,,A1 1
.
-
j I
. i
,. • .• -Y,..., '.. , •••,. '''.''.,' ' a 1"
r r-I“it .
-•. •..;;• ;2'',''; " LI- " L'''!.
,4 . i
4,
4 4 . •,',1."'•-'w:,:i .--.. ' :
-.i1
. . ,
/
.4......,"%z.
, - --, I L.k+.s' . ' ' 4.4, ••,' IA II
I, , ,z„• -• k• -T . 44:.2, -, '4
" ''..)\ -• '. 4'".'" • ,.
,..
•
4 Pi '''' '3 ',' " t,; .. 4 v 4
I., ...:
. k•
pit:14-"•'.41;;K, i.,,•'i! . . *... . ..)•. ,\...14..),,k,
1/'•-•1":-•ir'.'' ti ., 1 ..• . - ,
' t • ," '1°,0, )f • -4 M • ,J. - " 1 -
• ,', . ..4„ A•••,, II, .,
,.411, 71. •• ,..0
. , •.k......, .•;f,.I,,viri, 11'
....
I , i e. -,(...-.:•:4. 4 . .-- 6 'V, ,14
ViI...4:. ' -.7-k'v
k *
i! 4*-- , ...; •'.....
I A Wa
.. -... 'XI Np., _jai_ _
Photo No. 19 Description: Timber pile bollard on shore: East side
.. -
i.,
;t
H . .
, 1 I .
i . .
,
1 1 • , .
_,.., _ _ „. i
1 • .
' I 1 'kill
'h., -••
••k 1
,, 1 .• .• •
_:, -...
-.,; I t
'
41&:-
,
Ik" • ,. 4 '
-
— 4
',Z;-:' 7.1i ,.11i • . .... , , . -.
_
, , i il 8 -t '2• , iv, 2. _
II
•-•
' 41 *
, .
.•••••••_•-•,•„ • ._;.- !. : •••-•—.... I
_ •*-*-- it. )
,
- - -
,...._ i ' • r.*2.:•;..... ••••• -*, ' ".. - -* - -
I'''' •41.:„.•' ''.4 4 ." 4( r-''''- '--.1ti-'1. :: 't. --- --- t •
:`:,;,!?-4',- ',4•,' tr,"ati 1.1 I?I'l -.r'v '
111#
A
4.7.-. L like, la. , : ,...!,.F17., t..,0- •-• -, 4, ,
Photo No. 20,Description: Electrical junction box in wooden enclosure; East side
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 11.of 23
Field Inspection Photograph
N. . v-,1 .
v
� . -�x4. 4i: ;
1 1_ :' -
�4ft. *M
--71k1.11' I- Pi!'
Photo No. Description: Northeast corn ,;of Eat.Pier: Station MOO
d .
S
II
.}
I1
•'‘...' f .
r -
• ,. _
------3
,, rted- -11417 le
�r
f,, -.!„re7«�' - •• „sig. ' .S i ,t'7',.%:"
./" c`",t ,'M
C v'
Photo No.�2 Description: East Pier deck; from Station 0+025. facing North
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 12_of 23
Field Inspection Photograph
. • _ til s Ytl T. - �L e.
F
Photo No. 23 Description: West face_of East Pier sho ng selling of concrete copewall
_....
i � i ,y ,,,,rs
,.. ..,.....,
,,,
.7: ,
ti_
A r Tom,
tr .,P.hr..-0•-,, ,--,..-•,"•"--. •4,-, J., .. -.,- . '''' ....i 4,
gra
p i 1:: 4 � V. i. to ry.�J. "I.g
17!''1 Y . • .t r
gif
iiii
•
, ill
Photo No. 24 Description: West face of East Pier;note exposed reinforcing bars
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 13 of 23
Field Inspection Photograph
{ 3 btu r . .- �, k !
," t a%7�. / ,-,--4.6.-- "' .r- it v-r
f . II $ . ,
•
-. I , •
11 4
I s :�. .
'''-'11-.• r ' p
- ,
' °R .P. 1
Photo No, 25 Description: Start of SSP on Wc,st se: Section F
sY
ll
41=V`,41'..�v ,, . _I,•'� 4 ' • '� ,• e _kl ,
{
.
.
y
f
le
lit
v b
i
ay w5
1.
liA: '1 I„ r i i 1 li: V ot 1. i- •'4'
�? Nir� '�
'. 1
Photo No. 26 Description: Station 0+090; Uncapped steel tube posts; West side
Public Works and Government Services Canada
Port Burwell, Ontario Sheet_14.of.23.
Field Inspection Photograph
il
', ♦ 1 ••
� alj -n
1111
tii
c" I
Selliriihm. _
-:-
_ 1 I ; '
•
Photo No. Description._ l ge of direction in S 'E 60 ng of l at c + Sat' +l 02
I
'e 3 lit
iR:„. 4 ,, -..
y ,.� 1 � �u .. j MI r , 1
I ti M 11 i@
.. �`�. rt` T a h
I 6'*[ 1 T, F
.
i IA
Iiii 4 s 0 7 ' ' i 5.
F
.. _ '4 t: ' Or 1
.
Photo No. 28 Description: Station 0+105; typical condition ofSSP wall; West side
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 15 of-23
Field Inspection Photograph
i - -
cr
' .1 A r.'• . 17,4-' 1 -
' N ,". %1 "4., ,g c 1
I
1 irir:. ,.
......,
-,i'
, ...
4
.......„
. . . s, .\ t 4 f r 1. +
� . !7 YY
bre q tcr 4 [.
tr - ' - \ `4�, '}' !-F � -�1 91 - 1
`
i i, e Fes:: , s
A . lif IL t A ,,
atott- -,;',
• .1
Photo No. 29 Description: Station 0+129; loss of material from behind SSP;West side
if
'1', -
l
it
)1111 l fryji
yn4' t
it),
Azi .- ;. 4 i
'� _ - ': _ -
Photo No. 30 Description: Station 0+189.5: loss of materiaLfrom behind joint; West side
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 16_of 23
Field Inspection Photograph
r
1 =! 4, , s 1
.11
' , I i,
I
{ +� Fe _ +f • .a ri'. ..
L,r -P.1.4- . .. • ' ,,iv yr, 1':.h:L. . - ' i , '
- y —
ii
_
I ,
1
1
Photo No._31 Description: View of deterinr1 tr concrete c nmwa_ll: est sidej# g West
riith .
IMIIIIPIW -.A.'
1 .
at.....,_
,;-
I s ' .r
4.
- i I
, • ~ -
I _
r
_ 4Fp:.
A— 1
1
Photo No.1_2_Description:_tation_0+217: start of inf lling ne o w I es e
Public Works and Government Services Canada
Port Burwell, Ontario Sheet_17.of-23
Field Inspection Photograph
Photo No. T7eserip�ticm:_'�1 ew c�# ollard line: f cir�g : ot�th
-
fi Yr
Photo No..34 Description: Station 0+525; end of infilled area; concrete copewall exposed
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 18_of.23.
Field Inspection Photograph
II1
1
e`q t f
in4
� _— .... .
ffi
•
Photo No. 35 Description: Concrete copewall; cliai of !inkjence property line: West side
' 'K� Y `. ., sties — y+� - —_# _. -�'...
.'4-••••'-e.:7'" _ i� R " ,!i �s Wit'- -•",r
w
•
ti $
.:e'1-1 ,..i- .- . -V
-- - ... ~. __....-. .___tti_,.:...,1.....13....i..._.4 ._._..h.L'..
Photo No. 36 Description: Station 0+881: pipe outlet to channel through top of wall
Public Works and Government Services Canada
Port Burwell, Ontario Sheet_19 of_23_
Field Inspection Photograph
— - - _ _
4_
.a
y
�._.la r ' I. Far-.—Yr„
r r - "
r
k'*, - •`t _.i7, 'i , *6.
-
! i
• ale:Ft' leis)
I
0ii
-�' ,gip. .
",
Pho'‘' No,. 7 Description: Station 0+8 end of concrete copewall: West side
Y m . 41.
o r _ •c _
i. A ti.7,1 } _'T
Photo No.a&Description: Station 0+895; end of timber crib structure, Section H
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 20 of 23
Field Inspection Photograph
F,'---
,
"
Photo No. 32. Description.- View of East face of concrete 1-rE: warrtr. facing West -
" .� A
- Jwi, 'fir,' '--"k".''es4 -a � y _ - • .
x.. -« ti s Y
]
1
t% :
1
Photo No. 40 Description: Deterioration of concrete at base of breakwater wall
Public Works and Government Services Canada.
Port Burwell, Ontario Sheet 21 of 23
Field Inspection Photograph
_ 1-•. y
�� ;t r F `_
"may _'r _'r -� * i La —
_ _ — ..ev 4° _.— 'le t-....1tEZI
- - _ _ ""*
its,n
- — .
411114 ,
.41
4,..
i sIllilik'
I
Photo No. 41 Description: Severe deterioration of cnixx;rete of blocks at base of wall
-
M
ip it
' iii
,•
i' I' i'
LALA it
d a kr
,gym. _ - - -
--
', _ �-+
r
41311111110 ., i
I
•
,1
Photo No. 4`2 Description: North face of lighthouse at South end of concrete_breakwater
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 22 of-,21
Field Inspection Photograph
I
'R
I
p i
.M
'
Mt
.. .ti 12_t
m 4t
)4. , v 'w „
• , - ,'
.V
l' � `
��' r . .
,.ifs e iv.' $.
Phot) \io.,1 Description: to ' 0+ li f ' use ba at t lev est e
ri.....r ... -
•r+,
N .
e 1
r ..
_ S
Photo No. 44 Description: Overall view of Rubble Mound Breakwater
Public Works and Government Services Canada
Port Burwell, Ontario Sheet 23 of 23
Field Inspection Photograph
f _ �
0040
~¢ :-. 'ter
'
F— - —7— _ -
406
Photo No. 45 Description: West side ofRubble..Mottnd $eater
yI A Ail° Si'. i m. ,d. 4
i y
1 ► r .
3se t .. .10:1;41, '. . m - II,. ""
~
iii —t. • +L. 8 e;
' i s SIV .. somik1
.Nt• II 0. I,1 A it ' io 1Pr
z'.
Photo No. 46 Description: Core stone visible below armour stone on Rubble Mound Breakwater
Public Works and Government Services Canada
Appendix C
Diver's Report
ROUTINE DETAILED INSPECTION
FEDERAL HARBOUR FACILITIES
Port Burwell, Ontario
Prepared for:
Public Works & Government Services Canada
Prepared by:
WATECH SERVICES INC.
895 Valetta Street
London, Ontario
N6H 2Z4
November 1996 WS! 96172
TABLE OF CONTENTS
Page
1. INTRODUCTION 1
2. PROCEDURES 2
21. General 2
3. OBSERVATIONS AND INSPECTION RESULTS 3
3.1. General 3
3.2. Steel Sheet Pile Wail, East Side 4
3.2.1. Field Note Summary 4
3.3. Timber Mooring Dock, East Side 7
3.4. Steel Sheet Pile Wall, West Side 7
3.4.1. Field Note Summary 7
3.5. West Concrete Breakwater 10
3.5.1. Field Note Summary 10
3.6. Offshore Rubble Mound Breakwater 14
4. CONCLUSIONS AND RECOMMENDATIONS _ 15
Photographs
Figures
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 1
1. INTRODUCTION
WATECH SERVICES INC. was retained by Public Works & Government Services
Canada in November 1996 to carry out an underwater routine detailed
inspection of the existing federal government marine structures in the Village
of Port Burwell, Ontario. The federal government facilities in the Village of
Port Burwell function primarily as breakwaters which protect the channel of
the Otter River where it enters Lake Erie. The inner harbour structures serve as
tie-up walls for commercial fishing vessels and pleasure boats.
The purpose of this inspection was to assess the present condition of the
marine structures within the study area and document and report on the
condition of the facilities. This report presents the results of the inspection of
the inner harbour facilities and the west breakwater. The east pier is not
included in this report.
Public Works & Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour facilities. Port Burwell,Ontario Page 2
2. PROCEDURES
2.1. General
The underwater inspections were carried out by our inspection divers in
November 1996 .using surface supplied air diving helmets equipped with
voice communications and voice recording capabilities. The inspection diver
was in constant voice communication with the surface personnel relaying
the results of the underwater investigation for documentation by surface
personnel.
Prior to completing the inspection, chainage was marked on the harbour
structures by PWGSC staff in order to provide location control for the
inspection survey and water depth soundings.
Inspection dives were carried out in water visibility up to 0.3 metres.
Water depth soundings were obtained at 25 metre intervals along the
structure in order to document water depth and suspected areas of scour.
The water depth soundings are reported in table format in the Observations
and Inspection Results section. The water depths reported have been
reduced below IGLD chart datum for Lake Erie.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federaf Harbour Facilities,Port Burwell.Ontario Page 3
3. OBSERVATIONS AND INSPECTION RESULTS
3.1. General
The inner harbour structures consist generally of steel sheet pile (SSP) walls.
Sections of the sheeting support a concrete copewall. Generally the sheet
piling is in good condition and for the most part joints and interlocks in the
sheet piling are tight. Sections of the inner harbor have completely silted in
or have been filled in and the wharf structure face cannot be seen.
Several outfall pipes penetrate the sheet pile walls. Some of the holes in the
sheet pile wall cut for the outfall pipes have not been properly sealed and fill
loss is occurring.
A short section of timber decked mooring dock is located near the highway
bridge at the north limit of the harbour. This structure is entirely of timber
construction with timber piles supporting a timber deck. The structure is in
generally good condition with the only significant damage noted being
missing or loose fender timbers.
Other structures consist of the west concrete breakwater and the offshore
rubble mound breakwater. The west concrete breakwater is in poor to fair
condition with significant deterioration of the timber cribs noted below the
water level and sections of heavy spoiling and erosion of the concrete
noted above the water level.
The offshore rubble mound breakwater is generally in fair condition. Sections
of the crest elevation have settled and the toe of the structure is somewhat
irregular, however, the structure appears to be functioning adequately.
In order to further document the findings of the inspection, the results are
presented by section and on Figures 1 and 2.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities,Port Burwell,Ontario Page 4
3.2. Steel Sheet Pile Wall, East Side
The inner harbour structures on the east side of the harbour consist of a steel
sheet pile wall with a ground level deck of earth and gravel. Sections of the
sheeting are capped with a concrete copewail or a heavy steel channel.
Generally, the steel sheeting is in good condition with tight joints and
interlocks. Fill loss from behind the wall is noted around poorly sealed outfall
pipes that penetrate the wall and at the joint between the steel sheeting
and the concrete copewall. The following field notes detail the inspection of
the sheet piling on the east side of the harbour.
3.2.1. Field Note Summary
Station Observations
SSP Wall, East Side of Harbour,
Note: Chainage from north to south
0+000 End of soil embankment.
Start of steel sheet piling (SSP) wall.
0+000.5 Outfall pipe, 150 mm diameter, covered with fabric.
Pipe in good condition.
0+009.5 Outfall pipe, 150 mm diameter, covered with fabric.
Pipe in good condition.
0+034.7 Outfall pipe, 150 mm diameter, covered with fabric.
Pipe in good condition.
0+043.8 Outfall pipe, 150 mm diameter, covered with fabric.
Pipe in good condition.
0+044.7 Deflection in SSP wall.
0+050.6 Deflection in SSP wall.
0+051 .9 Change in sheeting. Joint is good.
Concrete copewall, 0.35 metres in height, begins.
0+083.6 Wooden timber fender, in poor condition, attached to
SSP wall in poor condition.
General Underside of concrete copewall weathered and
chipped for its entire length.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection,Federal Harbour Facilities, Port Burwell,Ontario Page 5
Station Observations
0+104.7 Elliptical CSP outfall (400 mm x 450 mm) fits into inpan.
Opening in SSP around outfall pipe is tightly sealed.
No fill loss evident.
0+107.4 End of concrete copewall.
End of timber fender.
Change in SSP wall steel cap on top of sheeting.
0+157.5 Sink hole, 1.0 metres wide, behind wall.
Hole, 200 mm x 75 mm, in SSP approximately 800 mm
above water level.
0+207 900 deflection in SSP wall.
0+207.8 Start of concrete wall.
0+208.7 Concrete wall ends at 900 corner.
Start of SSP wall.
Sink hole, 1.0 metres x 1.1 metres, at surface.
Gap (75 mm) between concrete and SSP.
Fill loss noted at joint.
Gap closes at water level.
0+216.8 End of SSP wall.
Start of embankment.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection,Federal Harbour Facilities, Port Burwell,Ontario Page 6
- Table 1
Steel Sheet Pile Wall, East Side
WATER DEPTH SOUNDINGS*
Station Water Depth (metres)
0+000 +0.4
0+025 +0.3
0+050 +0.3
0+075 +0.2
0+100 +0.1
0+125 0.4
0+150 0.4
0+175 0.5
0+200 0.2
0+210.8 0.4
* Soundings have been reduced relative to IGLD chart datum for Lake
Erie.
+ Indicates reduced sounding is above chart datum
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection,Federal Harbour Facilities, Port Burwell,Ontario Page 7
3.3. Timber Mooring Dock, East Side
A timber mooring dock is located near the highway bridge at the northern
limit of the harbour. The dock is approximately 55 metres in length and
3.6 metres in width. The structure is constructed entirely of wood.
Round timber piles support the deck of the structure. The piles are
constructed in bents with three piles in each bent. The spacing of the pile
bents is erratic, ranging from 1.3 metres to 2.5 metres. The timber piles are
creosoted and are generally in good condition above water level and
below. The timber deck stringers and pile caps are also creosoted and
appear in generally good condition.
Several timber fenders (13) are missing or broken. The remaining fenders do
not appear to have rotted significantly. Any damage or removals that have
occurred appear to be from ice or impact by large boats docking against
the structure.
3.4. Steel Sheet Pile Wall, West Side
The inner harbour on the west side of the channel consists of sections of soil
embankment and steel sheet piling. The steel sheet piling on the west side of
the harbour becomes buried in an infilled section of the harbour and
emerges again closer to the lake.
The SSP wall on the west side is also in generally good condition with the
exception of minor fill loss occurring around outfall pipes and joints in the
structure. The following field notes detail the results of the inspection of the
SSP wall on the e t side of the harbour.
3.4.1. Field Note Summary r'
SSP Wall,(East'side of Harbour
Note: Cha nage from north to south
Station Observations
0-007.8 End of embankment.
Start of SSP wall.
Public Works & Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 8
Station Observations
0+000 900 corner.
Dent (600 mm x 400 mm x 50 mm deep) in SSP in corner
starting at water level.
0+081.1 Elliptical CSP outfall (450 mm x 200 mm) fits into inpan.
Horizontal break (600 mm) in bottom of pipe.
Gap (50 mm) at top of pipe.
Gap (20 mm ) along sides of pipe.
Loose fill in gaps.
Concrete eroded at bottom of pipe.
0+083 Deflection in SSP wall.
0+102.6 Deflection in SSP wall.
0+185.7 CSP outfall (450 mm diameter).
Gaps (50 mm) at top and bottom.
Loose fill 150 mm behind wall.
0+189.7 Deflection in wall.
End of SSP wall.
Start of concrete copewall, 150 mm wide timber
sheeting underneath. limber sheets in fair condition.
Gaps noted between sheets.
Minor fill loss noted.
0+212.3 Concrete spoiling (800 mm x 400 mm x 100 mm deep)
starting at water level to top of copewall.
0+217.1 Structure becomes buried.
Start of soil embankment.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 9
Table 2
Steel Sheet Pile Wail, West Side
WATER DEPTH SOUNDINGS*
Station Water Death (metres)
0+000 +0.1
0+025 3.4
0+050 3.3
0+075 2.8
0+100 3.2
0+125 1.8
0+150 2.2
0+175 0.6
0+200 +0.3
0+225 Area infilled against wall
0+600 +0.6
0+625 +0.4
0+650 0.2
0+675 0.4
0+700 0.2
0+725 0.4
0+750 0.6
0+775 0.8
0+800 0.2
0+825 +0.7
0+850 +0.6
0+875 +0.4
0+900 +0.3
0+925 0.0
0+938 +0.6
* Soundings have been reduced relative to IGLD chart datum for Lake
Erie.
+ Indicates reduced sounding is above chart datum
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 10
3.5. West Concrete Breakwater
The west concrete breakwater consists of stone-filled timber cribs supporting
a mass concrete copewall and deck. Only the top two timbers of the timber
cribs remain exposed above the present lake bottom elevation. The portion
of the timber crib that can be examined is in poor condition. Numerous
missing and deteriorated timbers were noted along the length of the
structure. The concrete below the water level and above is heavily eroded
and spalled and is generally in poor to fair condition. The following field
notes detail the inspection of the west concrete breakwater.
3.5.1. Field Note Summary
West Concrete Breakwater
Note: Chainage starts at south end of breakwater
Station Observations
0+120 Top timber becomes visible underneath concrete wall.
0+123 Top timber ends.
0+127 Top timber loose underneath concrete wall.
Second timber buried.
0+129 Top timber missing.
Void (300 mm) underneath concrete wall.
0+131 Top timber in place.
0+136 Timber crib joint.
Vertical gap 100 mm.
0+141 Top timber becomes buried in sand.
0+146 Top timber becomes exposed.
0+146.5 Timber crib joint.
Vertical gap 100 mm.
0+147 Vertical gap (200 mm) in top timber.
0+153 Vertical gap (100 mm) in top timber.
0+157 Possible crib joint.
Vertical gap 150 mm.
0+160.3 Top timber recessed 150 mm from concrete face.
0+166 Top timber missing.
0+173 Top timber recessed 200 mm from concrete face.
Public Works & Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection,Federal Harbour facilities, Port Burwell,Ontario Page 1 1
Station Observations
0+175 limber crib joint.
Vertical gap 100 mm.
0+180.7 Second timber becomes exposed.
Vertical gap (100 mm) In top timber.
0+183.8 Vertical gap (150 mm) in top timber.
0+187.0 Vertical gap (300 mm) in top timber.
Possible rotted cross timber.
0+190 Vertical gap (300 mm) in top timber.
0+193.6 Top timber missing.
0+195.4 Top timber in place.
0+199 Vertical gap (300 mm) in top timber.
0+201 Top timber missing.
0+202.7 Top timber present.
0+205.2 Vertical gap (400 mm) in top timber.
0+207 Vertical gap (150 mm).
Possible crib joint.
0+208 Vertical gap (400 mm) in top timber.
0+210 Top timber in good condition. •
0+220 Vertical gap (300 mm) in top timber.
Possible rotted cross timber.
0+230 Top timber recessed 300 mm from concrete wall face.
0+245 Top timber missing.
Concrete chunk (1.2 metres) broken off at water level
0+254 Top timber recessed 100 mm from concrete wall face.
0+262 Timber crib joint.
Vertical gap 100 mm.
Next crib flush with wall face.
0+273 Timber crib joint.
Vertical gap 150 mm.
Top timber in good condition.
0+279 Vertical gap (150 mm) in top timber.
Public Works &Government Services Canada WATECI1 SERVICES INC.
Routine Detailed inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 12
Station Observations
0+284 Wail heavily eroded from top to bottom with large
chunks of concrete missing.
0+284 To end of lighthouse pad.
Concrete heavily eroded.
0+290 Chunk of concrete (800 mm x 2.0 metres) broken off
wall and lying on bottom.
0+308 Crib joint (300 mm).
Top and second timbers in good condition.
0+314 Top timber recessed 150 mm from concrete face.
Top timber kicked out 100 mm from second timber.
0+323 Top timber recessed 100 mm from concrete face.
Top timber kicked out 50 mm from second timber.
0+334 Section (2.0 metres long) of heavy concrete spoiling
(300 mm x 1.1 metres) starting 300 mm below water
level at corner of lighthouse pad.
Public Works &Government Services Canada WATECH SERVICES iNC.
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 13
Table 3
West Concrete Breakwater
WATER DEPTH SOUNDINGS*
Station Water Depth (metres)
0+075 +0.4
0+100 +0.1
0+125 0.1
0+150 0.2
0+175 0.3
0+200 0.4
0+225 0.2
0+250 0.2
0+275 0.4
0+300 0.2
0+325 0.4
0+334 0.4
* Soundings have been reduced relative to IGLD chart datum for Lake
Erie.
+ Indicates reduced sounding is above chart datum
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities, Port Burwell,Ontario Page 14
3.6. Offshore Rubble Mound Breakwater
The offshore rubble mound breakwater protects the harbour entrance from
the prevailing southwest winds. The breakwater is constructed entirely of
stone with the exception of a lighthouse base at the offshore end of the
structure which is constructed of concrete with an underlying stone-filled
timber crib.
The offshore breakwater is in generally fair condition. The crest elevation has
depressed up to 1 .3 metres at the second deflection offshore for a linear
distance of 10 metres. The individual armour units are from 3 to 10 tonne in
size. Some shattering and cracking of the individual armour units has
occurred, however, the incidence of complete splitting and shearing off of
portions of the units appears minimal. Occasional voids between the armour
units are noted where the core stone is visible. The exposed core stone is
generally 200 to 300 mm stone material.
Inspection and probing along the toe of the structure indicate that the toe is
very irregular and the base of the structure varies significantly in width. Some
of the irregularity may have been present since construction, however, it
appears that some of the units at the toe of the breakwater may have
settled into the lake bed somewhat. The irregularities in the slope and the
toe do not appear to have resulted in major overall settlements in the
structure other than the area around the second deflection where the crest
is depressed up to 1.3 metres.
The offshore lighthouse base appears generally level. The underlying timber
cribs are buried in armour stone and cannot be examined.
Figure 2 shows typical cross sections on the breakwater at various locations.
Public Works &Government Services Canada WATECH SERVICES INC.
Routine Detailed Inspection, Federal Harbour Facilities,Port Burwell,Ontario Page 15
4 CONCLUSIONS AND RECOMMENDATI
The inner harbour facilities in Port Burwell are generally in good condition,
however, the entire harbour is heavily silted making it difficult for larger
commercial vessels or fixed keel pleasure sailcraft to use the facilities.
The deteriorations of the Inner harbour structures are not significant and a
minor program of patching around poorly sealed openings through the
structures and joints in the structure is ail that is required to restore the harbour
walls to full function. Consideration could also be given to replacement of
the timber fenders on the mooring dock. The heavily deteriorated timber
fender on the east SSP wall from Station 0+083.6 to Station 0+104.7 should be
removed. The timber serves no function and is a hazard for pleasure boats
using the wall.
The breakwater structures are in fair condition. The west concrete
breakwater continues to function, however, the underlying timber cribs are
deteriorating and failures may occur within a few years.
The offshore rubble mound breakwater appears to have deteriorated from
its original construction, however, the rate of deterioration is unknown. The
structure, in all likelihood, has appeared as it does today for many years and
may continued to perform adequately for many more years.
Further inspections In 3 year's time are recommended for both breakwater
structures in order to determine the rate of deterioration and the scope and
timing of repairs or reconstruction.
Public Works & Government Services Canada WATECH SERVICES INC_
ROUTINE DETAILED INSPECTION
FEDERAL HARBOUR FACILITIES
Pod Burwell, Ontario
FIGURES
Prepared for:
Public Works IL Government Services Canada
Prepared by:
WATECH SERVICES INC.
895 Valetta Street
London, Ontario
N6H 224
November 1996 WS! 96172
13.9w
-- — t -
LAYE& C.=
N w+1![ trYe.
j
•.7f
0
7.4- {4•t n i
- _ ' -` ecv Akner•I'3—
iAYEP
mG� wmFf ltrFt
i
_3 ccsF c-,-,,i-,-,,iPubkic Works Government Services Cc
a�
~•` : r Figure 2
r ��` �-= II
•Z
ACMOUhlD OFFSHORE BREA ZWA
Port 6urwelt,Ontar'w
SEcTioN F•F , i December 1996 WATECH SERVICES INC.
F,,,,,, i..0-1'"
5.4rt I
6.B
y S.4n - —. - 9.6n --- I I 7.8-,
T -14:n61,2;_,
sYsR of 9p
t' 111W - PRne�Q 1TexE I " - 4�YfR CF �- T - .---__
o�.1 5 ry ...writ.LEviL b AErYG-'R �Tcr+G L.., 1
' _ 4 _A*_ 1
....F,64 Lew..4
4 o t
P 2 COR STONE 2 S j ~ _�._
I !. F-CRE STcr.F 7
4; Nr
- de4-' G;. n t r 7'--.';.
q ' r
r+wTE: (¢C55 SEKTrc. AT --
SECeHo DEFLEcTIc.r, '^• F
SECTION ION A-A ARriouR SToHE HAS,
sE TTLET, coEE STa^NE
FA(! ifr SOLITI IS vISIgL,E
SEcTI
SEcrlol`f C-C Al EttcµC nEr,rcrr,,N Fr',c+wl(
+
FACIAI(r ]C VT H
L
I
6.8M S9n
( ) WYcn cc
C +Ur J L I LdYEa cF Akne�R
h ?7„.........„ Q ry Q n,�GG \� :-TC N E r
��` ' WA in. LFvEL ��I�� P wn�
N; iveL
r , 9
C4 410 dJ cc EF Srr NE L I Cc2E SrcN=
@ mea..� < ` / I
ftA\\SEc SECTioN D-D
-TION B-13
FFI
c...,....,- SCJTH F.+clri(: S[VTU,
a----...---;:\
TA
e.' ' \
e / J` d A
4.
J A
'
` PLAN VIEW OF A¢MOVR 5i0NE BRCAkWATtF?
J
�c�i i1CVCE � fec !... i.en, DE7w•LS1
r
1 E7
1
o¢
..C,
Public Works&Government Services Ca
Figure 1
INSPECTION DETAILS
Port Burwell, Ontario
il
N December 1996 WATECH SERVICES INC.
I
_- —.mow.."-a-.,.a��.-...�.�.=asm✓r�ea�en s -✓au,.rsva�_r.i-wxe...ei4+! .ee �.w. �.a,av- pec P•_dtr,.au.:.r..:v.. - a r-v�•+.a ...r uww. 1�s..aa v.. a-.--a <c+M:.Jl4'_"yd1R•�r'.' :-ie::a ��
91,:,.v. -•i : 31,25
_ .._....__
w-4 NO 1_1.">gc /s/011„53900 7 JO w'sdlti 1 I V-1.DI Owto....... -.4.,..m...)
ki
•— — — — --- --— —
- g i
R'
31,y ?-4517 ..-"P N.,.?,,N
vi?s og1-1
.c......._------'
rff: %.
1.?.9 51 9:-,1," - .1"
"....,..•• . 11.74 1,A.^›1 V311 0
.
.7c,74,3 51 ',191,e, \ ....--->
-"*. ',"" '
5 \
..;; ?ev 045 ungHe.1
s r 5,4 IJA,LS
_
1.. d
.....11,1d3a •. 1.
10 ."-L 33SN) I
930 vA 1gn.47 ',......1.2.00 :iilt C2:'13 VS9 1•411-
NOIS
`,
' \ \ ‘
•. — •• • . •
>— —
_
i •
..
...,..,...--.4 0239
3
__-
gi Dlo No D
.'\3 ,,
t ------ -.
1A ____ .__4______ __ _
j v. . ---i ,
'.7.•
I
lc—Mr.— mi..... . SI b .,,
• ...7.'
/ ii , I Z•4 14.?-i I.CI
‘ 41(
1 0 1
' I 1 ---------.--:--J1' i,--I.6
./.'
..,
-..... .1,.f'..
4 4
;,....,„.
717 ' i
,
---____
w.
i
.---, 3
.1.?,01 10 11, “3,.”11!va)
., .
----./
r./ 30009 ..
•• 0'
3111:1 03.015
gla, 3,0
...C",-,„,......._...„._
‘, .040-A
1
i
000+0
: .911,r0.010:
JO 1 -7)Ivitk 2ld)
c ,- 5L-45 •
it 00 0*0
11..e
Immglialm•••••••• •••........... An•••••..1...=,..r..,...- • ••,,mop.s..........., a..now....-----
.....-.a.....•.....-
ono-------5---
....
Port Burwell, Ontario
Harbour Evaluation
November, 1996
by:
Architectural and Engineering Services
Public Works and Government Services Canada
Ontario Region
for:
Small Craft Harbours
Department of Fisheries and Oceans
Table of Contents
1. Summary . 1
2. Introduction. 2
3. Useful Residual Life . . 4
4. Component Assessment 6
4.1 East Side . 6
4.1.1 Fisherman's Wharf . . . 6
4.1.2 East Shore Wall6
4.1.3 East Pier. 6
4.2 West Side . . . . 6
4.2.1 West Shore Wall _ 6
4.2.2 Concrete Breakwater 7
4.2.3 Rubble Mound Breakwater . . . . . . , 8
5. Depreciated Value . . . . . 11
List of Figures
Figure 1: Port Burwell Harbour Layout Plan . . . . 3
Figure 2: Existing Ground Conditions at Concrete Breakwater . . 8
List of Tables
Table 1: Summary of Calculated Useful.Residual Life . . . 5
Table 2: Summary of Repair Considerations and Approximate Costs . . 10
Table 3: Summary of Depreciated Values of Harbour Facilities . . . 11
Port Burwell, Ontario 1
Harbour Evaluation
1. Summary
This report summarizes the evaluation of the harbour facilities upon completion of the detailed
visual inspection of Port Burwell Harbour, carried out by Public Works and Government
Services Canada(PWGSC) on November 28, 1996. An 82 m section,North portion of the East
Pier, was inspected on November 11, 1996 will also be evaluated in this report.
The underwater inspection was carried out by Watech Services Inc. in November, 1996.
The harbour was established in 1832 with the incorporation of the Port Burwell Harbour
Company. It was later transferred to federal ownership.
The facilities on the East side of the harbour include the East Pier, shore wall protection along
Big Otter Creek, launching ramp, and fisherman's wharf These facilities are generally in fair to
good condition. The northerly 82 m portion of the East Pier is in poor condition where the
concrete is severely deteriorated.
The facilities on the West side of the harbour include shore protection along Big Otter Creek,
West Pier, West concrete breakwater, and rubble mound breakwater All facilities are in
generally good condition. Approximately 310 m (1017') of the channel has been infilled with
dredged material along the shore wall protection. The exact property ownership of the created
land area is unclear.
A section of wall along the West side (Section F; 0 -190 to 0+217) is calculated to be beyond its
Useful Residual Life (URL). However,visual and diving inspection has concluded that the wall
is in generally fair condition. The major detenoiation has occurred along the face of the concrete
wall but the timber sheet piling is still in fair condition.
The concrete breakwater is also calculated to be beyond its URL and expenditures may be
considered to rehabilitate the concrete superstructure and the timber crib substructure. Work
may be deferred until the deterioration becomes a hazard for pedestrian use.
The facilities at Port Burwell Harbour were given an estimated cost of construction. These costs
were then depreciated using straight line depreciation to give a current depreciated value of the
structures. The estimated cost of construction is on the order of$14.4 million while the current
depreciated value of the structures is approximately $5.5 million.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 2
Harbour Evaluation
2. Introduction
Public Works and Government Services Canada(PWGSC) was retained by the Department of
Fisheries and Oceans (DEO), Small Craft Harbours to perform an engineering inspection of the
harbour facilities at Port Burwell, Ontario. This report evaluates and summarizes those facilities
for Useful Residual Life, Component Assessment, Repair Considerations, and Depreciated
Value.
The evaluation includes the structures of the harbour as follows:
• East Shore Wall,plus 82 m section of East Pier
•Fisherman's Wharf
• West Shore Wall
• West Pier
• West Concrete Breakwater
• Rubble Mound Breakwater
The underwater inspection was carried out by Watech Services Inc. for structures below the
water line as well as structures inaccessible from land, including the Rubble Mound Breakwater.
Figure 1 shows a reduced site plan for the harbour. The plan also shows the infilled area as a
result of dredging operations from 1987 to 1992.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 4
Harbour Evaluation
t
-..,..1 el :,,
� *
� ti
Ak Ag ill■� rFISHERMAN'S WHARF
Hi1
r
w EAST SHORE WALL
a
WE5T SHORE WALL ❑ 1 -
Y
V,'r/
liiiWEST PIER EAST PIER
1i
■
CONCRETE BREAKWATER
4`
InIS AN'
! RUBBLE MOUND BREAKWATER
FIGURE 1: Port Burwell Harbour Layout Plan
Public Works and Government Services Canada DRAFT
Port Burwell, Ontario 4
Harbour Evaluation
3. Useful Residual Life
Analysis of the Useful Residual Life (URL)was done using the formula presented in the
"Guidelines for Inspection and Maintenance of Marine Structures" prepared for PWGSC by
Lowe-Martin. This formula is based on the Theoretical Useful Life (TUL) of each component
and is as follows:
URL = { TUL x ( 100 % - WC ) x CF } -AA
where; WC is the weighting coefficient varying from 0 %to 30 %
CF is the compensation factor varying from 0.7 to 1.0
AA is the actual age of component
The weighting coefficient takes into account such variables as nature of use, salinity and
pollution of water, wave conditions, exposure to ice, and other variables which affect the
deterioration of the component. The choice of these variables is very subjective. The
compensation factor indicates the actual condition of the structure or component at the time of
the assessment and again requires some subjectivity.
The "Guidelines", as prepared by Lowe-Martin, do not give TUL values for timber sheet piling,
timber substructures, concrete superstructures, or concrete caps The values of TUL used for
these components were 30, 40, 50, and 60 years respectively The TUL suggested for timber
piling is conservative and 50 years was used instead The suggested TUL value of 50 years for
SSP was also considered conservative and a TUL of 70 years was used.
This formula can only be used for general guidance; experienced engineering judgment must be
used in assessing the final URL As can be noted, the formula contains too many subjective
variables, therefore should not be used as a true indicator of the URL.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 5
Harbour Evaluation
TABLE 1
Summary of Calculated Useful Residual Life
Facility Component I Year Constructed I Actual Age Useful Residual Life
(Years) (Years)
East Side
Fisherman's Wharf
Timber Piling 1962 34 16
Section A
SSP 1994 2 68
Section N
SSP 1960 36 27
Concrete Cap 1960 38 18
Section B
SSP 1950-51 46 17
East Pier(82 m)
Conc. Superstructure 1925-26 71 Beyond URL
Timber Substructure 1904 92 Beyond URL
West Side
Section E
SSP 1948-49 48 15
Section F
Timber Sheet Pile 1903-04 93 Beyond URL
Concrete Face Wall 1934-35 62 Beyond URL
Section G
SSP 1950-51 46 17
Concrete Face Wall 1950-51 46 8
Concrete Breakwater
Section K
Conc. Superstructure 1912-14 84 Beyond URL
Timber Substructure 1911-14 85 Beyond URI.
Rubble Mound
Breakwater
Section L
Rubble 1928-31 68 22
Section M
Conc. Superstructure 1930-31 66 Beyond URL
Timber Substructure 1930-31 66 Beyond URL
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 6
Harbour Evaluation
4. Component Assessment and Repair Considerations
4.1 East Side
4.1.1 Fisherman's Wharf
The Fisherman's Wharf, treated timber pile construction, remains in good condition. The
calculated URL of 16 years seems reasonable as there appears to be no present signs of
deterioration.
The Fisherman's Wharf has remained in generally good condition. However, several timber
fenders are missing and damaged and if left missing could lead to damage of the wharf itself.
The Ice Fence is also has damaged or missing fenders. These should be repaired as the fence
offers protection to the wharf
4.1.2 East Shore Wall
The steel sheet piling over the length of shore appears to be in good condition. Each section
along the shore can be expected to reach their calculated URL The concrete cap atop the SSP in
Section N is in good condition with no signs of damage or excessive cracking. The concrete cap
can also be expected to reach or exceed its calculated URI
The East Shore Wall is in generally good condition and will require only locations of slight fill
loss to be restored.
4.1.3 East Pier
Both the concrete superstructure and timber substructure have exceeded their calculated URL.
The decking of the section has become highly deteriorated and continues down the wall of the
section. The timber substructure is in fair condition, as reported by the diving inspection.
Expenditures may need to be considered for resurfacing the concrete superstructure and no
immediate action is required for the timber substructure.
The East Pier is in poor condition and can be rectified by two options. The first option is to
remove the 82 m section of pier and restore the area to a natural state. The second option is to
restore the structure to its original state.
It is recommended that the timber pile clusters along the length of the East Pier be removed as
they pose a potential hazard to local boaters.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 7
Harbour Evaluation
4.2 West Side
4.2.1 West Shore Wall
Similar to the East Shore Wall, the SSP is generally in good condition. There are no signs of
excessive damage or deterioration and therefore can be expected to reach its calculated URL.
The concrete face wall along Section G is nearing its calculated URL but remains in good
condition. Therefore no expenditures need to be made until its URL is reached and a subsequent
inspection is conducted.
Both structural components of Section F, the timber sheet piling and concrete face wall, have
exceeded their calculated URLs. However, the timber sheet piling is still in generally fair
condition and can be expected to perform adequately for another few years. The concrete face
wall has deteriorated and may require some repairs to be considered. The repairs would be
limited to a small length of wall as the remainder of the section is buried.
The remainder of shore wall, Section G, is generally in good condition with no signs of excessive
damage or deterioration. The SSP wall has remained in good condition and can be expected to
reach and likely surpass its calculated URL. The concrete face wall is in fair to good condition
and can also be expected to reach its calculated URL. No repairs are required at this time and
only minor repairs may be required up to its calculated URL
The West Shore Wall is in generally good condition and w1l1 only require the areas of slight fill
loss to be restored. The fill loss between the infilled area and adjacent shore wall must also be
restored to eliminate the potential trip hazards.
It is recommended that the timber pile clusters along the West Shore Wall, across from the East
Pier, be removed as they pose a potential hazard to local boaters.
4.2.2 Concrete Breakwater
The timber substructure of the breakwater is reported to be in poor condition and has exceeded
its calculated URL. The concrete superstructure has also exceeded its URL but is in poor to fair
condition. No immediate action may be required as the breakwater continues to function
adequately, and may only require minor remediation in the future.
Benches and a timber boardwalk were added along the top of this structure in the recent past.
One bench has fallen over. Therefore, the remaining benches should be checked or reinforced to
prevent additional benches from falling off.
The concrete breakwater is currently exposed to generally less harsh conditions than experienced
immediately after construction. The West side of the breakwater has had sand deposited along its
side thus reducing the wave action on the breakwater.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 8
Harbour Evaluation
The East side has also had a build up of sediment along the edge. The entire East side is still
exposed but the water depth along the edge has been greatly decreased, reducing the wave action
on the face of the breakwater.
The following figure gives a representation of the existing ground and base conditions
surrounding the Concrete Breakwater.
Existing Ground Elevation I.■
.h- ,••.ice •` • . . asr•Concret �.+ tel■• t
` ' '' ' 1:2:4• !� •-k
-:•'••••••• i=' ,,,... void; ,hags Concrete void;
� !-T..r Plume. L_
1:3:6a M': y1 hM7:
.t •V!-
Previous Waiter Eloy, { Y .■ F4 • .I
. . .Ft fEWg
lcv.571.8
:Iv.,
v,•.k
-,--• �, 'r.Approx.Existing
■ I atone fill.*Alt level ■ '
-L9 I ' 1 ;Base Elevation
ra
t- 1 iti ' 1 1- 14 {!'
4 I 'I •1 1 `.
-i i [44 1 1 i
141 I l
II
a , �, f
. SII L
FIGURE 2: Existing Ground Conditions at Concrete Breakwater
The headblock is largely deteriorated along the base of the structure and may require repairs to
be performed earlier. However, the headblock is now exposed to generally less harsh conditions
and may remain to function adequately with repairs being performed.
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 9
Harbour Evaluation
There are two options to deal with the Concrete Breakwater. The first option is to restore the
breakwater to its original state. This is a costly solution and may not be required. The second
option is to take no action until the deterioration reaches a state where the structure is a hazard
for pedestrian use. This option may be advantageous as the breakwater is exposed to generally
less harsh conditions, extending the anticipated life of the structure. The breakwater is also not a
highly travelled area and any pedestrian traffic can be redirected along side the breakwater rather
than atop the structure.
4.2.3 Rubble Mound Breakwater
The rubble mound breakwater is reported to be in overall fair condition and has remained
generally level and straight. The breakwater has shown no signs of excessive deterioration and
can be expected to reach its calculated URL. The headblock at the South end of the breakwater
is generally level. However, the timber substructure could not be examined as it is buried in
armour stone. Because the headblock has remained level it can be expected that it will continue
to function adequately and no repairs need to be considered at this time.
The Rubble Mound Breakwater is in generally good condition and therefore requires no repairs
to be considered.
The following table summarizes the repair considerations and associated approximate costs for
the repairs to the structures within the harbour.
Public Works and Government Services Canada November 1996
-i1
Port Burwell, Ontario 10
Harbour Evaluation
1
TABLE 2 1
Summary of Repair Considerations and Approximate Costs
i
Location I Observation Repair Consideration 1 Approx. Costs 1
Wharf Construction
Fisherman's Wharf -missing vertical fenders -replace damaged or missing $ 10 000
fenders
Ice Fence -damaged and missing -replace damaged or missing $2 000
fenders fenders
East Side
Section A -fill loss from behind SSP; -repair hole and restore fill $ 100
hole in SSP
Section N -remnants of timber fender -no action
along wall
Section B -fill loss from behind SSP at -repair joint and restore fill $4 000
ferry slip joint
East Pier -deterioration of entire deck -entire removal $25 000
(82 m section) surface and walls -restoration. ,$ 100 000'
-deteriorated timber pile -removaI • • $ 10 000
clusters
West Side
I
Section E -uncapped steel posts -cap or remove entirely $500
-fill loss from behind SSP -restore fill $ 100
Section F -fill Ioss from behind wall -restore fill $ 1 500
-deterioration of face -restoration $ 5 000
infilled Area -washouts along Ni,all -replace fill $ i 000
Section G -no damage -no action
Section H -severe damage and -removal $ 10 00&
deterioration -no action _
West Pier -deteriorated timber pile -removal $ 12 000
clusters
Concrete Breakwater
Section K -overall deterioration -restoration $200 000
-no action -
Rubble Mound
i
Breakwater
Section L&M -no excessive damage -no action -
I
Public Works and Government Services Canada November I996 u'
N
1 1
Port Burwell, Ontario 10
Harbour Evaluation
TABLE 2
Summary of Repair Considerations and Approximate Costs
Location Obseri ation, • Repair Consideration .Approx. Costs
Wharf Construction
Fisherman's Wharf -missing vertical fenders -replace damaged or missing $ 10 000
fenders
Ice Fence -damaged and missing -replace damaged or missing $2 000
fenders fenders
I
East Side
Section A -fill loss from behind SSP; -repair hole and restore fill $ 100
hole in SSP
Section N -remnants of timber fender -no action
along wall
Section B -fill loss from behind SSP at -repair joint and restore fill $4 000
ferry slip joint
East Pier -deterioration of entire deck -entire removal $25 000
(82 m section) surface and walls -restoration ,$ 100 000
-deteriorated timber pile -removal . I $ 10 000
clusters
West Side
Section E -uncapped steel posts .cap.or remove entirely $500
-fill loss from behind SSP -restore fill $ 100
Section F -filI loss from behind wall restore fill $ 1 500 I 1
-deterioration of face -restoration $ 5 000
Infilled Area -washouts along wall -replace fill $ 1 000
Section G -no damage -no action -
Section H -severe damage and -removal $ 10 006
deterioration -no action _
West Pier -deteriorated timber pile -removal $ 12 000
clusters
Concrete Breakwater
Section K -overall deterioration -restoration $200 000
_ -no action -
'ubhle Mound
war
reakwater
Section L&M -no excessive damage -no action -
Public Works and Government Services Canada November 1996
Port Burwell, Ontario 11
Harbour Evaluation
5. Depreciated Value
The cost of construction for the facilities at Port Burwell Harbour was estimated based on the
present market unit rates in 1997. Where appropriate, the salvage values at the end of the
components useful residual life, were also estimated in 1997 dollars. The salvage value for the
SSP component of the facilities was estimated at 50 % of the initial construction cost.
In some instances the useful residual life has been exceeded but the structures continue to
perform adequately. In these cases the timber components and concrete superstructure were
estimated to have a remaining life of 40 years. At the end of the 40 years the salvage value was
considered to be negligible. The salvage value of the Rubble Mound Breakwater was estimated
to be approximately 30% of the initial construction cost.
The current value of each facility was then calculated using a straight line depreciation from the
time of construction to the end of its useful residual life.
The existing structures were designed for heavy commercial use and deep dredged depths. These
structures are much more expensive than would be required for current dredged depths.
The following table summarizes the estimated construction cost and the current depreciated value
of the structures within the harbour.
TABLE 3
Summary of Current Values of Harbour Facilities
Facility ted Construction Cost Current Depreciated Value
(1997$) (1997$)
East Shore Wall
Section A $45 000 $44 143
Section N $126 440 $74 631
Section B $206 250 $112 698
East Pier $4 302 570 $1 434 190
West Shore Wall
Section E $377 375 $195 899
Section F $142 200 $51 709
Section G $921 038 $426 436
Concrete Breakwater $4 168 860 $1 334 035
Rubble Mound Breakwater $3 877 200 $1 703 316
Lighthouse Base $198 185 $75 499
Fisherman's Wharf $70 000 $22 400
TOTAL $14 435 118 $5 474 956
Public Works and Government Services Canada November 1996