HomeMy WebLinkAbout2021 - Port Burwell Wastewater Treatment Plant
January 21, 2022
District Manager
Ministry of the Environment
733 Exeter Rd.
London, ON
N6E 1L3
Re: Annual Reporting as per section #11 of ECA #0112 – B6VQV8 and ECA# 2248-
B2RRXN for the Port Burwell Wastewater Treatment plant.
Dear: Sir/Madam
The following is a summary of the year 2021 operations for the Port Burwell Wastewater
Treatment Plant, owned and operated by the Municipality of Bayham in accordance with
the conditions set out in section #11 (3) of the above said ECA`s.
a. A summary and interpretation of all influent and imported sewage monitoring
data, and a review of the historical trend of the sewage characteristics and
flow rates; - the 2021 annual compliance summary spreadsheet details the
influent characteristics as well as flows, 2019 – 2021 compliance
spreadsheets attached for trending information
b. A summary and interpretation of all final effluent monitoring data, including
concentration, flow rates, loading comparison to the design objectives and
compliance limits in this approval, including an overview of the success and
adequacy of the works; - as above – the design rated capacity of 1060m3 was
exceeded a total of 10 days during 2021. The dates and flows are a result of
significant rain and or snow melt events as follows:
January 2, 2021 – 1369 m3 September 22, 2021 – 1137 m3
January 3, 2021 – 1062 m3 October 9, 2021 – 1379 m3
June 26, 2021 – 2134 m3 October 29, 2021 – 1301 m3
June 27, 2021 – 1083 m3 October 30, 2021 – 1400 m3
July 8, 2021 – 1233 m3 December 6, 2021 – 1510 m3
c. A summary of any deviation from the monitoring schedule and reasons for the
current reporting year and a schedule for the next reporting year; - no
deviations were encountered with the 2021 sampling schedule
d. A summary of all operating issues encountered and corrective actions taken; -
no operating issues encountered during 2021.
e. A summary of all normal and emergency repairs and maintenance activities
carried out on major structure, equipment, apparatus or mechanism forming
part of the works; - preventative and predictive maintenance completed
throughout the year consisted of pumps, blowers, valves, influent works
equipment, UV, flow meters, electrical, SCADA, generators … Wastewater
Annual Maintenance Summary report attached. Capital works included the
replacement of the influent works auger, valve actuators, and soft starter
replacements at Pump Stations #5 and #6.
f. A summary of any effluent quality assurance or control measures undertaken;
- results of in-house lab work is utilized as a quality control measure along
with process optimization
g. A summary of all the calibration and maintenance carried out all influent,
imported sewage and final effluent monitoring equipment to ensure that the
accuracy is within the tolerance of that equipment as required in this approval
or recommended by the manufacturer; - annual flow meter calibration
reports attached confirm that flow measuring devices are within
manufactures specifications.
h. A summary of efforts made to achieve the design objectives in this approval,
including an assessment of the issues and recommendations for pro-active
actions if any are required under the following situations; - when any of the
design objectives is not achieved more than 50% of the time in a year, or there
is an increasing trend in deterioration of final effluent quality, and or when the
annual average daily influent flow reaches 80% of the rated capacity; - the
2019-2021 annual compliance spreadsheets are attached for confirmation
and objective compliance trending
i. A tabulation of the volume of sludge generated, an outline of anticipated
volumes to be generated in the next reporting period and a summary of the
locations to where the sludge was disposed; - sludge application/metals
analysis spreadsheets attached – no significant increase in volumes are
anticipated for 2022.
j. A summary of any complaints received and any steps taken to address the
complaints; - odours specific to pump stations/force mains resulted in an
increase of Bioxide at PS#s 1,5,and 6 to rectify the concerns
k. A summary of all bypasses, overflows, other situations outside normal
operating conditions and spills within the meaning of part x of EPA and
abnormal discharge events; - none to report in 2021
l. A summary of all notice of modifications to sewage works completed under
paragraph 1.d of condition 10, including a report of status of implementation
of all modifications – none to report in 2021
m. A summary of efforts made to achieve conformance with procedure F-5-1
including but not limited to projects undertaken and completed in the sanitary
sewer system that result in overall bypass/overflow elimination including
expenditures and proposed projects to eliminate bypass/overflows with
estimated budget forecast for the year following that for which the report is
submitted; - ongoing flood preparedness efforts to mitigate flood water from
entering the sanitary collection system include gasketing of sanitary
manholes in low lying flood prone areas as well as sand bagging manholes
when and where applicable.
n. Any changes or updates to the schedule for the completion of construction and
commissioning operations of processes/equipment groups in the proposed
works; - not applicable for 2021.
Please do not hesitate to call me with any question or concerns at 519-874-4761.
Sincerely,
Ed Roloson, CMM III, CRS, ORO
Manager of Capital Projects -Water/Wastewater Operations
Municipality of Bayham
519-874-4761
eroloson@bayham.on.ca