13.2 D Report CAO-41/22 by Thomas Thayer, CAO|Clerk re Port Burwell Lighthouse
Heritage Architectural Services
REPORT
CAO
TO: Mayor & Members of Council
FROM: Thomas Thayer, CAO|Clerk
DATE: August 18, 2022
REPORT: CAO-41/22 SUBJECT: PORT BURWELL LIGHTHOUSE HERITAGE ARCHITECTURAL SERVICES
BACKGROUND
At its July 21, 2022 meeting, Council received Report CAO-36/22 re Port Burwell Lighthouse
RFP, which identified that staff would be placing RFP 22-02 on hold, pending further information
with respect to the proposed works on the exterior of the Port Burwell Historic Lighthouse:
“Staff have commenced discussion with the Architectural Conservancy of Ontario (ACO) to
confirm 1) how best to evaluate and address the required rehabilitation works; and, 2) whether
the Municipality’s proposed approach to rehabilitation would be satisfactory under the Act.
As such, staff will be placing RFP 22-02 on hold temporarily, pending further information and will
advise further when same is received.”
Since this time, the Municipality has been in discussion with an architectural firm with a specialty
in heritage consultation and restoration.
DISCUSSION
Staff conducted an on-site meeting with Ed van der Maarel and Timothy Finch, a+LINK
Architecture Inc. (a+LINK), on August 9, 2022.
Ed van der Maarel and Timothy Finch are both Heritage Consultants and members of the
Canadian Association of Heritage Professionals (CAHP).
Based upon on-site discussions and evaluation of the exterior and interior of the Port Burwell
Lighthouse, a+LINK has provided a Heritage Services Proposal Letter, attached to this Report,
outlining a timeline and costs for an analysis of the options for recladding the exterior for the
preservation and restoration of the existing lighthouse, and options and next steps for the long-
term preservation of same.
Their proposal fee is $5,150+HST for the work, which can be completed within six (6) weeks of
approval by the Municipality.
Also attached hereto is a document that identifies past heritage projects undertaken by a+LINK.
Given the tight timelines around the necessary evaluation and project completion, staff
recommend accepting the Proposal Letter as submitted by a+LINK and authorizing the CAO to
complete and remit same to the proponent so the works can commence as soon as functionally
possible. If approved by Council and given the timeline provided by a+LINK, a report can be
expected in early October.
ATTACHMENTS
1. Heritage Services Proposal Letter – a+LINK Architecture Inc.
2. Marketing Package – Reference Projects
RECOMMENDATION
1. THAT Report CAO-41/22 re Port Burwell Lighthouse Heritage Architectural Services be
received for information;
2. AND THAT Council accept the quote of $5,150+HST as provided in the Heritage
Services Proposal Letter submitted by a+LINK Architecture Inc. for Heritage
Architectural Services for the Port Burwell Lighthouse.
Respectfully Submitted by:
Thomas Thayer, CMO
CAO|Clerk
126 WELLINGTON ROAD
LONDON ON N6C 4M8
519.649.0220
www.aLiNKarch.ca
preserve + create + sustain 1
2022-08-18
Municipality of Bayham By Email: cao@bayham.on.ca
56169 Heritage Line, PO Box 160
Straffordville, ON N0J 1Y0
Att: Thomas Thayer, MSc, CMO,
Chief Administrative Officer | Clerk
Re: Request for Quotation – Heritage Architectural Services for the Port Burwell Lighthouse Recladding
Project
Dear Thomas,
Thank you for giving our firm the opportunity to provide you with a proposal of heritage architectural services
and fees for the Port Burwell Lighthouse Recladding Project.
We submit our proposal as follows for your consideration:
Scope of Work
We recommend providing an analysis and report identifying options for recladding of the exterior for the
preservation and restoration of the existing lighthouse. As well, the report will make recommendations as
to the options and next steps for the long term preservation of the lighthouse.
Legal Name of Prime Consultant
a+LiNK Architecture Inc.
126 Wellington Street
London, Ontario N6C 4M8
t: 519.649.0220
Principals and Staff Directly Involved in the Project
Principal in Charge: Ed van der Maarel, Principal Architect, Heritage Consultant + Partner
Design Lead: Timothy Finch, Heritage Consultant + Licensed Technologist
List of Sub Consultants
Not applicable for this phase of work
Project Schedule
We are available to begin the project within two (2) weeks of award and provide a report within four (4)
weeks of starting the work, total six (6) weeks.
126 WELLINGTON ROAD
LONDON ON N6C 4M8
519.649.0220
www.aLiNKarch.ca
preserve + create + sustain 2
Schedule of Professional Fees
We propose consulting fees for the services as per the following breakdown:
Heritage Architectural Services $ 4,950.00
Disbursements (Travel Budget 2 trips) $ 200.00
TOTAL $ 5,150.00
Disbursements Included: as described above
Changes to Scope of Work
The following is a schedule of fees which apply to changes to the scope of work. Changes to the scope
of work must be approved in writing by both parties prior to proceeding with the work.
a+LiNK Architecture Inc.
Principal Architect $ 195.00 per hour
Principal Heritage Architect $ 205.00 per hour
Senior Heritage Architect $ 145.00 per hour
Project Architect (Associate) $ 135.00 per hour
Intern Architect $ 120.00 per hour
Senior Licensed Technologist $ 120.00 per hour
Intermediate CAD Technologist $ 100.00 per hour
Interior Designer $ 100.00 per hour
Junior $ 85.00 per hour
Clerical $ 65.00 per hour
Specialized Consultants
Principal Heritage Architect $ 205.00 per hour
LEED Consultant $ 205.00 per hour
Value Added Tax: The Harmonized Sales Tax @ 13% will be applied to all invoices.
Invoicing: Invoicing will occur on a monthly basis as the work proceeds.
Note: Notwithstanding the foregoing, the obligations and liabilities of the Architect are limited to the
professional liability insurance provided by Pro-Demnity Insurance Company and any specific or
excess professional liability insurance coverage in force.
126 WELLINGTON ROAD
LONDON ON N6C 4M8
519.649.0220
www.aLiNKarch.ca
preserve + create + sustain 3
We look forward to working with you on this project. Should you have any questions regarding this
proposal please do not hesitate to contact us 519.649.0220.
Sincerely,
Ed J. van der Maarel
Principal Architect, Partner
Dip. Arch., Dip. Arch.Tech., OAA, CAHP
Acceptance of Proposal
Signature Print Name Date
marketing package - reference projectsport Burwell lighthouse recladding project
reference projects
The Banting House Museum, built in 1907 of Victorian architectural style, is a National Historic Site of Canada and designated under Part IV of the Ontario Heritage Act. a+LiNK was retained by the museum to complete the project in two phases. In Phase I, a+LiNK completed a heritage Building Condition Assessment (BCA) for the Canadian Diabetes Association in order to determine the existing condition of the building envelope of the original building and the 1987 rear addition. The report concluded that restoration work was necessary on the original building to maintain its historic fabric.
For Phase II, a+LiNK provided restorative measures as part of the construction drawings and budget preparation for the restoration which included the following elements:
• Complete masonry repointing • Foundation repairs• New concrete stairs • Restoration of heritage porches
As part of the BCA, a+LiNK also developed a concept to renovate the 1987 addition at the rear of the property to address building deficiencies. Although the proposed design was not constructed, the intention was two-fold: improve the building envelope, and also bring life and longevity to the exterior facade by replacing the brick with a modern glass curtain wall.
Banting house museum
442 Adelaide Street North, London, Ontario
project type: Restoration | project completion: 2013 | project Value: $220,000 | project size: 6,000 SF
| Port Burwell Lighthouse Marketing Package a+LiNK Architecture2
3Port Burwell Lighthouse Marketing Package |
reference projects
In 2010, a+LiNK Architecture was retained by the City of London to conduct a Condition Assessment and Maintenance Plan for each municipality-owned Heritage property located throughout the city. With several Canadian Association of Heritage Professionals (CAHP) staff, a+LiNK provided expertise to assess the heritage buildings to identify components in need of repair or replacement, with consideration to future needs and planning. Alongside our consultant team, a+LiNK worked with the City to create a conservation master plan to conserve the City-owned heritage properties for future generations by planning for the maintenance and life cycle renewal requirements with heritage conservation best practice.
In 2020, a+LiNK was retained again by the City to complete the Condition Assessments and Maintenance Plans in order to establish the Capital Budget for the next ten years. The Heritage properties involved in the scope of these projects include the following:
city of london heritage properties - condition assessments
London, Ontario
project type: Restoration | project completion: 2010 + 2020
• Baty House | 700 Pond Mills Road (c. 1865)• Eldon House + Carriage House | 481 Ridout Street (c. 1834)• Elsie Perrin Williams Estate | 101 Windermere Road West (c. 1915)• Flint Cottage | Springbank Park (c. 1837)• Grosvenor Lodge + Carriage House | 1017 Western Road (c. 1853)
• One Dundas | 1 Dundas Street (c. 1880) • Park Farm | 120 Meadowlily Road South (c. 1848)• Roy McKay Clubhouse | 25 Wilson Avenue (c. 1937)• Springbank Pumphouse | 950 East Springbank Gate (c. 1878)
| Port Burwell Lighthouse Marketing Package a+LiNK Architecture4
5Port Burwell Lighthouse Marketing Package |
reference projects
a+LiNK Architecture was retained by the City of London for various phases of the restoration and preservation of Eldon House Heritage Site. Eldon House houses some of the oldest artifacts known to exist in the City. The restoration included masonry repairs, waterproofing, door and window repairs, as well as window, siding and door painting. a+LiNK takes pride in preserving the historical elements of the property while bringing the building up to current codes.
The restoration of Eldon House included the production of design drawings & specifications, tendering & contract administration for restoration purposes. a+LiNK has worked on the restoration of several heritage facilities providing expertise to develop strategies for identifying, maintaining, stabilizing, removing, and in some instances, recreating various architectural components. The restoration of Eldon House included the following:
• Restoration and rehabilitation• Careful consideration of the historically significant elements of the buildings• Project management• Masonry repairs and repointing• Foundation repairs and waterproofing• Greenhouse restoration
eldon house - house & greenhouse restoration
481 Ridout Street, London, Ontario
project type: Restoration | project completion: 2006 + 2017 | project Value: $1 M | project size: 4,000 SF
| Port Burwell Lighthouse Marketing Package a+LiNK Architecture6
7Port Burwell Lighthouse Marketing Package |
reference projects
The Pinafore Park Dance Pavilion, also known as the West Pavilion, is located in the city of St. Thomas, and was constructed in 1917 by the St. Thomas Street Railway. It is a public space that provides an ideal setting for family events and outdoor activities, as well as sport and music events.
In 2015, a+LiNK Architecture was retained by the City of St. Thomas to design and implement a phased restoration plan of the Dance Pavilion to re-establish the pavilion as a community and civic events venue. Phase I of the restoration addressed structural deficiencies and exterior site work such as installation of new concrete curbs, replacement of existing gutters and columns, repair of concrete piers, and new exterior wood trim and siding.
In 2017, a+LiNK implemented Phase II for the exterior restoration of the pavilion which addressed rain water control and the building envelope including a historical paint analysis and new exterior paint application.
Phase III is planned to include the interior restoration of the ground floor and second floor.
pinafore park dance pavilion
95 Elm Street, St. Thomas, Ontario
project type: Restoration | Ongoing | project Value: $470,000 | project size: 6,000 SF
| Port Burwell Lighthouse Marketing Package a+LiNK Architecture8
9Port Burwell Lighthouse Marketing Package |
reference projects
Constructed in 1894, Petrolia’s Old Post Office was designed by the Queen’s Architect, Sir Thomas Fuller in the Romanesque style and served as the community post office until 1964. The post office is a designated structure with the facade protected under Part IV of the Ontario Heritage Act.
a+LiNK was retained by Lambton County Developmental Services (LCDS) to design for the adaptive reuse of the historic building to better serve the community in present day and into the future. a+LiNK considered the needs of the client and programming requirements while remaining true to the historic origins of the building to provide a balanced solution for the extensive restoration of the building. Added features of the building include six residential units on the upper, two floors allocated for affordable housing for LCDS, a new elevator and code compliant exiting provided via a new contained addition separate from the heritage structure and facade, at the rear of the building, with retail and small dining spaces on the main floor as well as space for restaurant and catering operations in the future.
With significant and rich architectural features, the post office building reflects the wealth of the community during the oil boom in the area. The preservation and restoration work was completed with consideration for the original fabric of the building within the context of a historic area of Petrolia in order to preserve this significant sense of place.
petrolia post office
4189 Petrolia Line, Petrolia, Ontario
project type: Restoration | project completion: 2009 | project Value: $3 M | project size: 13,000 SF
| Port Burwell Lighthouse Marketing Package a+LiNK Architecture10
11Port Burwell Lighthouse Marketing Package |