HomeMy WebLinkAbout2015 - Bayham Water Distribution System Municipality of Bayham
Water Distribution Quality Management System
Management Review
2015
The purpose of this annual management review process is to ensure the continuing
suitability, adequacy and effectiveness of the quality management system.
Review Frequency --- annual (Jan.30/15 —Jan.6/16)
Review Date --- Jan 6/16, Time = 10:30 AM
Review Participants --- Ed Roloson QMS representative and Paul Shipway CAO
Review Input
• Incidents of non-compliance --- no incidents to report during this review
frequency, MOECC inspection conducted on October 23/15 indicated a 100%
score.
• Incidents of adverse drinking water tests --- none to report during this review
frequency, quarterly water quality reports are presented to council.
• Deviations from critical control point limits and response actions --- none to
report during this review frequency.
• Efficacy of the risk assessment process --- all aspects of the risk assessment as set
out in the Bayham operational plan revision 1.10 are up to date as determined by
the QMS team on Dec.17/15 as part of a 3 year review.
• Results of internal and 3`d party audits --- an internal audit was conducted on Jan.
4/16 ( document attached ), a 3rd party surveillance audit was completed on
Nov.30/15 by SAI Global (report attached).
• Operational performance and water quality trends are presented to council
through out the year and are posted on the Bayham web site for public viewing.
Source raw water and treated testing information can be obtained from the Elgin
Area Water Treatment Plant or their web site.
• Follow-up on action items from previous management reviews --- none
• Status of action items ( if any ) identified between reviews --- none
• Changes in resource requirements, infrastructure, process,personnel, Drinking
Water Quality Management Standard or regulations that could affect the QMS ---
no changes anticipated.
• Resources needed to maintain the QMS --- no additional resources anticipated
(budgeted item)
• Results of infrastructure review--- water department staff conduct an annual
review of the water infrastructure as part of the operations and capital budget
process. Any updates to the water infrastructure are triggered by operational
issues, age/reliability of the asset and or a MOECC order. No concerns currently
exist.
• Operational plan currency, content and updates --- current version of the
operational plan is 1.10 dated Jan.30/14, updates to this version are attached.
• Emergency response testing--- on October 27/15 a scheduled meter chamber
installation along Nova Scotia Line was completed. The installation required a
complete water shut down which activated the potable bulk water haulage
procedure to service the system users. Water department staff successfully field
tested the said procedure. See operation event forms for further details and
monitoring notes.
• Consumer feedback--- none
• Staff suggestions --- none
• Other QMS items for discussion --- the QMS team will be considering the
completion of the recommended improvement items as per the Nov.30/15 audit
report as completed by SAI Global.
Stite441%'0"
Ed Roloson
QMS representative CA•
1631860-01
#DWAR.12.08 Rev.01
Page 1
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
ACCREDITATION PROGRAM FOR OPERATING AUTHORITIES
ON-SITE VERIFICATION AUDIT REPORT – 2016
FILE #: 1631860-01
The Municipality of Bayham
OAP-061
Operating Authority for:
Municipality of Bayham Water Distribution System
Re-Accreditation Audit
Prepared by: Sandra Tavares
Date: January 21, 2016
1631860-01
#DWAR.12.08 Rev.01
Page 2
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
Audit Objectives
The objective of the audit was to determine whether the drinking water Quality Management
System (QMS) of the subject system conforms to the requirements of the Ontario Ministry of the
Environment’s (MOE) Drinking Water Quality Management Standard (DWQMS) at all of the
locations noted in the Applicant Profile Form (AP 602). It was also intended to gather the
information necessary for SAI Global to assess whether accreditation can be offered to the
operating authority.
Audit Scope
The facilities and processes associated with the operating authority’s QMS were objectively
evaluated to obtain audit evidence and to determine a) whether the quality management
activities and related results conform with DWQMS requirements, and b) if they have been
effectively implemented.
Audit Criteria:
The Drinking Water Quality Management Standard
Current QMS manuals, procedures and records implemented by the Operating Authority
SAI Global Accreditation Program Handbook
Auditor:
Sandra Tavares
Audit Report Distribution List:
The Audit Report is distributed as follows:
Operating Authority
Owner
Ministry of the Environment Director
Confidentiality and Documentation Requirements
The SAI Global stores their records and reports to ensure their preservation and confidentiality.
Unless required by law, the SAI Global will not disclose audit records to a third party without
prior written consent of the applicant. The only exception will be that the SAI Global will provide
audit and corrective action reports to the Ontario Ministry of the Environment. For more
information, please refer to the SAI Global Accreditation Program Handbook.
1631860-01
#DWAR.12.08 Rev.01
Page 3
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
PART A. MANAGEMENT SUMMARY
This was an on-site verification audit of the The Municipality of Bayham’s conformance with the
requirements of DWQMS: Oct. 2006.
The overall effectiveness of the The Municipality of Bayham’s Quality Management
System is considered:
Effective
Not effective
Zero [0] non-conformities and six [6] opportunities for improvement were identified
during this assessment, as noted in Part D of this report. Please review Instruction for
The Completion of Non-Conformance Reports (NCR) found at the end of this report.
The audit objectives have been accomplished within the audit scope in accordance with
the audit plan and the time allocation.
There were no unresolved diverging opinions between the audit team and the
organization audited.
There were no previous corrective action (CAR) requiring verification and closure during
the audit.
Notes
Copies of this report distributed outside the organization must include all pages.
As part of the SAI Global Terms, it is necessary for you to notify the SAI Global of any changes
to your Quality Management System that you believe are significant enough to risk non-
conformity with DWQMS: Oct. 2006. For more information, please refer to the SAI Global
Accreditation Program Handbook.
Limitations and use of Report
This report was prepared exclusively for the use of the identified Drinking Water Authority and the Ministry of the Environment with
respect to the state of the Drinking Water Quality Management System at the locations listed.
The report is based on data and information collected during the site verification visit of the properties conducted by SAI Global and
must be considered in its entirety. It is based on the conditions of the sites encountered at the time of the site reconnaiss ance visit
for the dates indicated, and discussions with representative on the Site, as reported herein. Except as otherwise may be requested,
SAI Global disclaims any obligation to update this Report for events taking place, or with respect to information that may become
available to SAI Global after the time during which SAI Global conducted the work. SAI Global accepts no responsibility for any
deficiency, mis-statement or inaccuracy contained in this report as a result of omissions, misinterpretations or fraudulent acts of
persons interviewed or contacted. SAI Global makes no other representation whatsoever, including those concerning the legal
significance of its findings, or as to other legal matters touched in on this letter, including, but not limited to, ownershi p of any
property, or the application of any laws to the facts set forth herein.
By its very nature, the findings of an assessment like this are limited based on the selection of an audit sample and the eva luations
of the sample results. As such, it is quite possible that not every issue of nonconformance or potential non-conformance has been
identified by this review. Sample selection was based on the auditor’s sound and seasoned judgment. Recommendations made
herein are based on SAI Global’s interpretation of the applied criteria, and should be considered as such. Implementation of any
1631860-01
#DWAR.12.08 Rev.01
Page 4
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
recommendations proposed by SAI Global may not constitute conformance with the applicable standard. If a service is not expressly
indicated, do not assume it has been provided.
The scope and the period of SAI Global’s assessment are described in this report, and are subject to restrictions, assumptions and
limitations. As noted herein, the work was conducted in accordance with the scope of SAI Global’s proposal and terms and
conditions.
Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the sole responsibility
of the third parties. Should additional parties require reliance on this report, written authorization from the Drinking Water Authority
noted is required. SAI Global disclaims responsibility of consequential financial effects on requirements for follow-up actions and
costs.
1631860-01
#DWAR.12.08 Rev.01
Page 5
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
PART B. GENERAL INFORMATION
Operating Authority:
Legal name and address The Municipality of Bayham OAP 061
Address 9344 Plank Road PO Box 160 Staffordville Ontario
Applicant representative Mr. Ed Roloson
Title Water/Wastewater Operations Manager
Telephone 519-874-4761 Fax
E-mail eroloson@bayham.on.ca
Owner:
Legal name and address
same as above, or:
Applicant representative Ed Roloson
Title Water/Wastewater Operations Manager
Telephone 519-874-4761 Fax
E-mail eroloson@bayham.on.ca
Accreditation Option: Full Scope - Entire DWQMS
Population Serviced: 1540
This audit report covers the subject systems listed:
Municipality of Bayham Water Distribution System (address as identified above)
1631860-01
#DWAR.12.08 Rev.01
Page 6
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
PART C. SUMMARY OF FINDINGS
SUMMARY OF FINDINGS
OPERATING AUTHORITY
The Municipality of Bayham OAP-061
1631860-01
ACCREDITATION CYCLE: Re-Accreditation Audit
AUDIT TYPE
Systems On-Site Verification
AUDITOR
Sandra Tavares
January 21, 2016
SUBJECT SYSTEM(S) AUDITED
Bayham Water Distribution System
REQUIREMENT SYSTEM
1. Quality Management System C
2. Quality Management System Policy C
3. Commitment and Endorsement OFI
4. Quality Management System Representative C
5. Document and Records Control OFI
6. Drinking-Water System C
7. Risk Assessment C
8. Risk Assessment Outcomes C
9. Organizational Structure, Roles, Responsibilities and
Authorities C
10. Competencies C
11. Personnel Coverage C
12. Communications C
13. Essential Supplies and Services C
14. Review and Provision of Infrastructure C
15. Infrastructure Maintenance, Rehabilitation &
Renewal C
16. Sampling, Testing and Monitoring C
17. Measurement & Recording Equipment Calibration
and Maintenance C
18. Emergency Management OFI
19. Internal Audits OFI
20. Management Review OFI
21. Continual Improvement OFI
Mj
Major non-conformity. The auditor has determined one of the following:
(a) a required element of the DWQMS has not been incorporated into a QMS;
(b) a systemic problem with a QMS is evidenced by two or more minor non-conformities; or
(c) a minor non-conformity identified in a corrective action request has not been remedied.
Mn Minor non-conformity. In the opinion of the auditor, part of a required element of the DWQMS has not been
incorporated satisfactorily into a QMS.
OFI Opportunity for improvement. Conforms to the requirement, but there is an opportunity for improvement.
C Conforms to requirement.
Not applicable to this audit.
* Additional comment added by auditor in the body of the report.
1631860-01
#DWAR.12.08 Rev.01
Page 7
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
PART D. FINDINGS/COMMENTS
DWQMS Reference: 1 Quality Management System
Client Reference: Operational Plan (OP) Element 1 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The Operating Authority (OA) has established and is maintaining
the Quality Management System (QMS) in accordance with the
requirements of the DWQMS Standard and the policies and
procedures documented in the OP and referenced below.
DWQMS Reference: 2 Quality Management System Policy
Client Reference: OP Element 2 (rev.1.10, 29-Jan-2015) dated March 2009
Results: [Conforms]
Details: The OA has established and is maintaining a QMS that is
consistent with the policy. Refer to elements 14,15 and 21 for
evidence of commitment to maintenance and continual
improvement. The policy was observed posted at the front desk
of the municipal building.
DWQMS Reference: 3 Commitment and Endorsement
Client Reference: OP Element 3 (rev.1.10, 29-Jan-2015),
Appendix A – Council Endorsement (dated 5-Jun-2014)
Details: Top Management provided evidence of its commitment to an
effective QMS by:
a) Ensuring a QMS is in place that meets the requirements of the
DWQMS (refer to element 1);
b) Communicating the QMS (refer to element 12);
c) Determining, obtaining and providing the resources needed to
maintain and continually improve the QMS (refer to element 20);
d) Ensuring the OA is aware of applicable regulatory
requirements. Operators learn of new and proposed legislation
via the QMS Representative, training (e.g. Diligence for Water
Operators 23-Nov-2015 identified in Training Reports), MoECC
bulletins (e.g. water main disinfection changes via Owners and
Operators Update Bulletin Changes to O.Reg. 170/03 and 169/03
pertaining to testing and reporting requirements - no changes
were identified to existing sampling procedures), magazine
subscriptions and association memberships (e.g. AWWA, OMWA,
OWWA emails observed; WEAO newsletter email dated 11-10-
2015).
Results: [Opportunity for improvement]
Details: Consider documenting the process for identification of regulatory
requirements (e.g. newsletters, training, etc.) and tracking any
actions to completion (e.g. through Document Management
spreadsheet).
1631860-01
#DWAR.12.08 Rev.01
Page 8
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
DWQMS Reference: 4 Quality Management System Representative
Client Reference: OP Element 4 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: Top Management has appointed the Water/Wastewater
Operations Manager as the QMS Representative, and in his
absence, a Certified Operator, both of which were interviewed
during this audit, to confirm:
a) administration of the QMS by ensuring that QMS processes
needed are established and maintained (refer to element 1);
b) reporting to Top Management on QMS performance (refer to
element 20);
c) current versions of documents are being used (refer to element
5) and,
d) personnel are aware of applicable regulatory requirements and
the QMS (refer to elements 10 and 12). Awareness is achieved
via meetings, training and the Bayham website (via Laserfiche
implementation that took place within the last year).
DWQMS Reference: 5 Document and Record Control
Client Reference: OP Element 5 (rev.1.10, 29-Jan-2015),
Master Document List (rev.11, 19-Jun-2015)
Details: The OA is conforming to its procedure. Internally developed
documents have been generated electronically. Handwritten
records reviewed were legible and identifiable. Controls, including
authorized approval, issue dates, revision numbers and history
were observed to be used to ensure appropriate review/approval
and documents reviewed throughout this audit were readily
identifiable. QMS documentation includes:
i) The Operational Plan and associated policies and procedures
identified throughout this report. Hardcopy and electronic
documents and records reviewed and noted throughout this report
were identified in the OP. The OP is reviewed at least annually.
ii) Documents and records identified throughout this report,
determined as being needed to ensure effective planning,
operation and associated control; and
iii) The results of internal and external audits (refer to element19)
and management reviews (refer to element 20).
Hardcopies of the Master Documents are maintained at the Water
Department office file cabinet. Electronic copies of the Master
Documents are maintained on the laptop at the Water Department
and are backed up to the master server at the Municipal Office.
The logbook specific to the pumping station is maintained at the
pumping station; Vienna Booster Station logbook tracks booster
pump run hours and documents data from 1-Sep-09 through 20-
Oct-2015.The Logbook specific to the distribution system is
maintained at the Water Department office.
1631860-01
#DWAR.12.08 Rev.01
Page 9
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
Results: [Opportunity for improvement]
Details: There is an opportunity within Procedure A to describe the newly
implemented Laserfiche system and clarify ‘Provincial records
management’ with regard to bylaw 2014-091.
DWQMS Reference: 6 Drinking Water System
Client Reference: OP Element 6 (rev.1.10, 29-Jan-2015), Municipality of Bayham
Distribution System Operations and Management Manual (rev.4,
23-Mar-15)
Results: [Conforms]
Details: As per Operators and QMS Representative interviewed, no
changes have been made to the system and the description
remains correct.
DWQMS Reference 7 Risk Assessment
Client Reference: Procedure B (rev.1.10, 29-Jan-2015),
Municipality of Bayham Review of Element #7 & #8 of the Bayham
Water Distribution System (rev.1, 24-Jan-2013) dated 17-Dec-
2015, 26-Feb-2015, 8-Jan-2014 and original in 25-Jan-2013
Results: [Conforms]
Details: The OA has performed a risk assessment consistent with the
documented process. As per Water/Wastewater Operations
Manager, a 36-month reassessment was completed 17-Dec-2015.
Recent re-assessment led to potential addition of monitoring for
Port Burwell risk assessment outcomes. An annual review was
conducted 26-Feb-2015 and 8-Jan-2014 (as per external S2
Surveillance Audit Report).
DWQMS Reference: 8 Risk Assessment Outcomes
Client Reference: Procedure B (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedures.
The OA has not had to respond to any deviations from CCLs (i.e.
no AWQIs as per Management Review) although there was a
main break documented in the Operations Event Report (rev.1, 5-
Apr-05) 4-Feb-2015; sampling was completed as per Health Unit
request 2-Feb-2015 24 hours apart and results analyzed by SGS.
Valve break took place 22-Feb-2015 with installation 25-Sep-2015
of a service line tapping into water main. New meter chamber
was installed 27-Oct-2015 with a 3-Dec-2015 valve replacement
and a leak 14-Dec-2015. 2014 Operations Report identified a
number of leaks; leaks / breaks are consistent and random as per
Operator.
1631860-01
#DWAR.12.08 Rev.01
Page 10
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
DWQMS Reference: 9 Organizational Structure, Roles, Responsibility and
Authorities
Client Reference: OP Element 9 and Appendices B, D and E (all rev.1.10, 29-Jan-
2015)
Results: [Conforms]
Details: The OA has kept the description of the organizational structure
and respective roles, responsibilities, and authorities current. The
CAO outlined his Top Management responsibility for DWQMS
oversight, leading communication in emergencies and providing
information to Council. The CAO also identified the 2014
implementation of the Laserfiche system and that it assists with
providing an audit trail (i.e. transparency); the municipality is
looking to add more diligence to the system for document and
record tracking via a capital budget item. Water/Wastewater
Operations Manager and Operators also confirmed their roles.
DWQMS Reference: 10 Competencies
Client Reference: OP Element 10 (rev.1.10, 29-Jan-2015), Training Reports for
Operators and Water/Wastewater Operations Manager
Results: [Conforms]
Details: The OA has undertaken activities to:
a) meet and b) maintain competencies for personnel directly
affecting drinking water quality and have maintained records of
these activities.
c) ensure that personnel are aware of the relevance of their duties
and how they affect safe drinking water.
Class 1 Distribution certificates are posted at the wastewater
plant. The annual budget reviewed (refer to element 14) provides
for training (approx. $4,000 between training and conferences).
B. Butler Operator training records date back to 2005; training has
included:
i) 7-Oct-2015 Western Ontario Water Works Conference,
ii) 25-Nov-2015 Municipality of Bayham Community Emergency
Control Group Training and Exercise focusing on flooding of
Vienna (with Water/Wastewater Operations Manager),
iii) 28-Oct-2014 Western OMWA Educational Conference, and
iv) 6-Aug-2013 Treating and Distributing Safe Drinking Water
Mandatory Certificate Renewal Course through WCWC (31-Jan-
2013 for Water/Wastewater Operations Manager).
Water/Wastewater Operations Manager training records include:
i) 1-Feb-2013 Tabletop Exercise for Water Supply
Emergency (with B. Butler)
ii) 5-7 Mar-2014 CWWA conference,
iii) 8-Oct-2014 WOWW and
iv) 6-7 Oct-15 Standard of Care training (also done for Council
and CAO).
1631860-01
#DWAR.12.08 Rev.01
Page 11
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
DWQMS Reference: 11 Personnel Coverage
Client Reference: OP Element 11, Procedure C (both rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure. On
Call Schedule is posted at the Wastewater plant. The two
Operators on the Call Schedule coordinate the weekly alternations
with the Water/Wastewater Operations Manager as the alternate.
DWQMS Reference: 12 Communications
Client Reference: OP Element 12 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure. The
QMS Representative now provides the Owner a current version of
the OP via Laserfiche on the Bayham website via an automated
email. The QMS Representative and CAO keep the Owner
informed of the adequacy of infrastructure through the budget
process (refer to element 14), outcomes of management review
(refer to element 20) and other related QMS issues via quarterly
reports (refer to element 16). OA personnel work through
changes to the QMS. A current version of the OP is available to
staff at the water department office (mostly electronic but also
hardcopy in master folder). Consumers are notified of the QMS
and any significant changes to the subject system through
newsletters, flyers or handouts although nothing has required
communication. Complaint reports (rev.1, 20-Feb-09) are raised
(e.g. 6-Jan-2015) due to pressure issues, appearance of water 9-
Feb-2015 and chlorine 13-Oct-2015. The QMS policy (March
2009) was observed posted at the Water Department Office.
DWQMS Reference: 13 Essential Supplies and Services
Client Reference: OP Element 13 (rev.1.10, 29-Jan-2015),
Municipality of Bayham Water Department Essential Supplies,
Services and Emergency Contact List (rev.9, 17-Jun-15)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure.
AWWA equipment specifications are met via Evans Utility.
Statement of Qualifications / Accreditations dated January 2013
was available for FlowMetrix technicians. CALA Directory of
Laboratories accreditation is valid to 23-Apr-2016 for SGS for
microbiological testing; SGS inorganic accreditation is valid to 12-
May-2017.
DWQMS Reference: 14 Review and Provision of Infrastructure
Client Reference: OP Element 14 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure.
Capital and operating budgets are developed via a historical
review and the need for additional resources / funding based on a
number of criteria identified in the procedure. The 2016 budget is
1631860-01
#DWAR.12.08 Rev.01
Page 12
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
in draft to Treasurer. Bylaw No.2015-063 dated 4-Jun-2015
outlines operational budget which includes lab fees, supplies, etc.
Bylaw 2015-062 for capital budget was approved the same day.
Water budgets have been decreasing as a result of work
completed in 2009/2010; minimal capital is set aside for water
meter change outs. No capital works submitted as a result of
denial of grant in 2014 for 2015 budget for replacement of meters.
Same submitted for 2016 in 2015. Will not hear back from
OMAFRA until the end of the year which would then be
incorporated into the 2017 budget.
DWQMS Reference: 15 Infrastructure Maintenance, Rehabilitation and Renewal
Client Reference: OP Element 15 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OP documents routine planned maintenance activities for the
distribution system. For example:
i) annual valve inspections/exercising (rev.2, 17-Sep-2013)
took place Sep-Dec-2015, July-Sep-2014 and July 2013.
ii) annual hydrant inspection/flushing and pressure/ flow
testing completed Jul-Aug-2015/2014.
iii) annual Chamber Inspections completed 15-Apr and 26-
May-2015 via the Chamber Inspection and Maintenance
Record (rev.1, 25-Sep-05 which has items that don’t
apply), 28-May-2014 and 4-5-Nov-2014 and Jan-Oct 2013,
26-Apr-2013.
Preventive maintenance tasks to maintain the Vienna booster
station are documented in the preventive maintenance binder at
the water department office (confirmed observed for 2013-2015).
Water main or equipment replacement is conducted as needed
(refer to Operations Report in element 8 above). Operational
event forms are taken into account when planning for the budget
and additional resources pertaining to budget discussed in
management review. Breaks factor greatly into budget based on
water needed from another system. Quarterly report ending 30-
Sep-2015 includes analytical test results which includes
exceedance identified in element 18 and goes to Council
(reviewed email dated 12/18/2015 from Laserfiche for report dated
Sep-2015 for informational purposes only).
DWQMS Reference: 16 Sampling, Testing and Monitoring
Client Reference: OP Element 16 (rev.1.10, 29-Jan-2015),
Bayham Distribution Sample Schedule 2015 (rev.1, 29-Jan-2014),
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure.
Sampling, testing and monitoring results are provided to the
Owner through legislated reporting (approved by Council 19-Feb-
2015 for 2014 report (PS-06-15) and through annual Management
Review which are both available on the website through
Laserfiche, Bayham.on.ca (observed 2013 and 2014, data not yet
1631860-01
#DWAR.12.08 Rev.01
Page 13
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
compiled for 2015). Upstream sampling, testing and monitoring is
conducted by the Elgin Area Primary Water Supply System with
no issues are identified. Schedule identifies:
- quarterly THMs (9-Jan, 9-Apr, 5-Jul and 10-Oct-2013; 2014
and 2015 (6-Oct) also reviewed as well as 5-Jan-2016.
- alkalinity and pH winter (December 15-April 15) completed 29-
Sep and 16-Apr-2015) and summer (June 15-October 15);
- lead every 3 years winter and summer, last done 11-Apr and
19-Oct-2012 via SGS; 29-Sep and 16-Apr-2015. Lab records
date back to 2011 in the ‘water-waste/dept’ e-folder.
DWQMS Reference: 17 Measurement and Recording Equipment Calibration and
Maintenance
Client Reference: OP Element 17 (rev.1.10, 29-Jan-2015)
Results: [Conforms]
Details: The OA has implemented and is conforming to its procedure for
the calibration/maintenance of measurement and recording
equipment. Portable chlorine analyzers are calibrated annually -
completed by Flowmetrix 9-May-2013 and 15-May-2014/2015.
Quarterly verifications are completed by an Operator - 28-Feb-
2013/2014, 31-Aug and 29-Nov-2013, 29-Aug and 26-Nov-2014
and 25-Feb, 12-Aug and 20-Nov-2015.
DWQMS Reference: 18 Emergency Management
Client Reference: OP Element 18 and Procedure D (both rev.1.10, 29-Jan-2015)
Details: The OA has implemented and is conforming to its procedures.
AWQI Contingency Plan was tested as part of a real emergency
6-Aug-2015. Testing of the plan takes place every 3 years and
was last done 17-Dec-2015 with a previous test done 29-Jan-2013
(same scenario tested); prolonged water outage was tested.
Backflow Failure procedure references adverse water quality and
preventive maintenance. Biofilm emergencies have not been
reported as these are not as common in PVC piping, which is
mostly used throughout the system. Low Chlorine Residual
(AWQI), Main Break, Power Loss (for booster and fire protection),
Vandalism/Terrorism and Contamination of Source Water have
not been experienced as emergency situations. Loss of Pressure
coincides with main breaks and tower ahead of the system which
would require communication with the other OA. Contamination of
treated water and a major prolonged loss of water supply have
been identified as emergency situations which would require
direction from the MoE and Health Unit (no water, source water
contamination); prolonged loss of water supply was tested through
bringing in tanker. Main break is related to loss of water, bringing
in potable water via tanker is the only thing the OA has control
over.
1631860-01
#DWAR.12.08 Rev.01
Page 14
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
Results: [Opportunity for improvement]
Details: i) Ensure emergency response testing is tied to the contingency
plans or what triggered the emergency (e.g. main break, source
water contamination, etc.).
ii) Consider developing a matrix to ensure all emergency /
contingency plans are tested.
iii) Consider incorporating ‘Procedural Guideline Distribution
System During a Prolonged Outage’ into the emergency
procedures.
DWQMS Reference: 19 Internal Audits
Client Reference: Procedure E (rev.1.10, 29-Jan-2015),
Internal Audit Checklist (rev.2, 18-Feb-2015) dated 4-Jan-2016
Details: The OA has ensured that an internal audit is conducted once
every twelve months where all elements are evaluated. An
internal audit was last conducted 4-Jan-2016 with no
nonconformities identified. A follow-up internal audit to the one
completed 20-Jan-2015 was conducted 16-Mar-2015 (see S2 24
month surveillance audit report for more details) and did not
identify any nonconformities. Previous Internal Audits were
conducted and 25-Jan-2014 (as per S2 and S1 external audit
reports) and 24-Jan-2013.
Results: [Opportunity for improvement]
Details: Ensure the Internal Audit Checklist consistently includes evidence
of the ‘Do’ part of the requirements.
DWQMS Reference: 20 Management Review
Client Reference: Procedure F (rev.1.10, 29-Jan-2015),
Management Review 2015 (dated 6-Jan-2016)
Details: Top Management has implemented and conformed to the
procedure and has:
a) ensured management review takes places at least once every
12 months. Management Review was conducted 6-Jan-2016 (and
covers activities for the previous year) and included the CAO.
Management Reviews were previously conducted 19-Feb-2015,
29-Jan-2015 and 26-Feb-2014 (as per S2 and S1 external audit
reports)
b) ensured all required inputs being discussed,
c) considered the results of management review and identified
deficiencies and action items.
d) provided a record of any decision and action items, including
personnel and timelines.
e) reported results of the management review, the identified
deficiencies, decisions and action items to the Owner. 2016
results were provided to the Owner Representative by Top
Management the same day via email (now goes through email
rather than to Council as a result of the backlog).
1631860-01
#DWAR.12.08 Rev.01
Page 15
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
Results [Opportunity for Improvement]
Details: Consider including consumer complaint reports as the ‘consumer
feedback’ input to Management Review.
DWQMS Reference: 21 Continual Improvement
Client Reference: OP element 21 (rev.1.10, 29-Jan-2015)
2013 / 2014/ 2015 Corrective Action Reports (rev.1, 6-Apr-09)
Document Management Spreadsheet 2015 (rev.1, 21-Jan-2015)
Results: [Opportunity for improvement]
Details: Internal audit corrective actions were tracked and available for
audits completed 20-Jan-2015; two CARs generated in 2015
pertaining to elements 3 and 9 were closed and showed no
reoccurrence. Three CARs were raised in 2013 related to
elements 5, 12 and 20. Three CARs in 2014 were related to
elements 6, 13 and 5. As per internal auditor and review of
previous 3 years, less findings are being identified and of lesser
importance. November 2015 external audit report generated 3
OFIs. February 2015 had 4 minor nonconformances which have
not recurred. Nine OFIs were raised in 2014 which were
addressed.
Results: [Opportunity for improvement]
Details: Consider including:
i) root cause and verification of effectiveness as part of the
Corrective Action Report.
ii) a ‘source of finding / action’ on the Document Management
Spreadsheet as well as documenting this process as part
of the OP / Internal Audit procedure.
1631860-01
#DWAR.12.08 Rev.01
Page 16
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
PART E. RECOMMENDATION - Onsite
The result of the audit indicates that the The Municipality of Bayham QMS [was]
effectively implemented.
The following recommendation is made:
Offer of re-accreditation
Offer of accreditation after response to corrective action requests has been deemed
acceptable to SAI Global
Maintenance of existing accreditation
Complete re-assessment
Final comments:
Refer to audit comments throughout.
___________________________
E-signature of Lead Auditor / Auditor
1631860-01
#DWAR.12.08 Rev.01
Page 17
Confidential
20 Carlson Court, Suite 200
Toronto, Ontario Canada M9W 7K6
Telephone: 416-401-8700 Facsimile: 416-401-8650
INSTRUCTIONS FOR THE COMPLETION OF NON-CONFORMANCE REPORTS (NCR)
Failure to provide action plans as arranged with SAI Global and/or to implement correction and corrective action
within the nominated time frames may lead to a recommendation that your certification be denied or suspended.
Certain sectors require both Major and minor NCR’s to be cleared within a specified time. Refer to sector specific
requirements for details.
Section 1
To be completed by the SAI Global Team Leader at the time of the audit. A copy of the NCR shall be left with the
Client at the completion of the audit.
Section 2 - Organization Response
Complete Section 2 as described below and return it to -SAI Global. In lieu of completing SAI Global NCR form,
the Client may submit an equivalent corrective action document.
Root Cause: Consider using appropriate root-cause analysis tools such as, 5 Why’s, FMEAs, Fault
tree analysis and fish bone diagrams, etc., to ensure identification of root cause.
Correction: Describe the action taken to correct the incident and contain the problem. Objective
evidence in the form of revised procedures, records, etc. shall be submitted unless
otherwise identified by the Audit Team Leader
Corrective Action: Client shall describe the systemic (long term) corrective action(s) planned or taken to
eliminate the root cause to prevent recurrence. Objective evidence in the form of revised
procedures, records, etc. shall be submitted unless otherwise identified by the Audit
Team Leader.
NOTE: For audits to the ISO 13485 – CMDCAS standard the client shall submit a corrective action plan
that identifies the steps to correct the root cause and verify the effectiveness of actions taken within 30
days of the NCR issuance date. Objective evidence for closure can be submitted at a later date.
Organization
Acknowledgement:
Name of the organizations representative who was presented the non-conformance.
Signature is not required.
SAI Global
Verification Method
Record if site visit is required or what information is to be provided to effect NCR closure.
Section 3
The SAI Global Team Leader /Client/Project Manager will review the completed NCR or Client’s equivalent
corrective action document for adequate root cause analysis, systemic corrective action taken on root cause and
objective evidence submitted. Upon completion of the review the SAI Global Team Leader will either ac cept the
corrective action taken and clear the NCR or request that the Client provide an additional or revised response or
objective evidence in order to clear the NCR. Comments shall be added to the hardcopy of the NCR or
electronically as appropriate to identify any request for additional information, including the date for submittal.
Section 4 – Verification of Effectiveness
Identify the method (plan) to be utilized to verify that the corrective action taken is effective. This could be a follow -
up audit or submission of objective evidence of implementation. Where appropriate, records of the client’s method
of verifying effectiveness can be utilized. Record in the results the actual method and documents reviewed to verify
effectiveness.
Section 5 - NCR Closure
Name and date of individual performing the verification and NCR closure.
Drinking-Water Systems Regulation O. Reg. 170/03
Drinking Water Systems Regulations
(PIBS 4435e01) December 2011
Page 1 of 4
ANNUAL REPORT
Drinking-Water System Number: 260004735
Drinking-Water System Name: Port Burwell Area Secondary Water Supply System
Drinking-Water System Owner: Port Burwell Area Secondary Water Supply System Joint
Board of Management
Drinking-Water System Category: Large Municipal Residential
Period being reported: January 1st to December 31st, 2015
Complete if your Category is Large Municipal
Residential or Small Municipal Residential
Does your Drinking-Water System serve more
than 10,000 people? Yes [ ] No [X]
Is your annual report available to the public
at no charge on a web site on the Internet?
Yes [X] No [ ]
Location where Summary Report required
under O. Reg. 170/03 Schedule 22 will be
available for inspection.
Complete for all other Categories.
Number of Designated Facilities served:
Did you provide a copy of your annual report
to all Designated Facilities you serve?
Yes [ ] No [ ]
Number of Interested Authorities you report
to:
Did you provide a copy of your annual report
to all Interested Authorities you report to for
each Designated Facility?
Yes [ ] No [ ]
List all Drinking-Water Systems (if any), which receive all of their drinking water from your
system:
Drinking Water System Name Drinking Water System Number
Malahide Distribution System 260004774
Bayham Distribution System 260004748
Did you provide a copy of your annual report to all Drinking-Water System owners that are
connected to you and to whom you provide all of its drinking water?
Yes [X] No [ ]
Township of Malahide Office
87 John Street
Aylmer, ON N5H 2C3
Drinking-Water Systems Regulation O. Reg. 170/03
Drinking Water Systems Regulations
(PIBS 4435e01) December 2011
Page 2 of 4
Indicate how you notified system users that your annual report is available, and is free of
charge.
[X] Public access/notice via the web
[X] Public access/notice via Government Office
[ ] Public access/notice via a newspaper
[X] Public access/notice via Public Request
[ ] Public access/notice via a Public Library
[ ] Public access/notice via other method _______________________________________
Describe your Drinking-Water System
The Port Burwell Area Secondary Water Supply System transmission main extends from the
Elgin Area Water Treatment Plant servicing Central Elgin, Malahide and Bayham. The
watermain serves approximately 270 direct connections to the system. Tertiary lines are
connected to the system through metering chambers. The entire system services
approximately 3000 people.
The system has 40 sub-surface chambers for isolation, metering, air relief and draining.
Along the main there are sample stations and hydrants for monitoring and flushing.
The Port Burwell Area Secondary Water System is controlled and monitored by the SCADA
system. There is an elevated storage facility located on Nova Scotia Line, which is controlled
by the valve house on Dexter Line. This Tower (Port Burwell Tower) has a capacity of
1518m3. The system is re-chlorinated at two locations: the Port Burwell Tower and
Lakeview Re-Chlorination Facility. The re-chlorination facilities contain sodium hypochlorite
dosing pumps connected to a Programmable Logic Controller (PLC), with a flow paced signal
from the flow meter and chlorine analyzer for residual control by the PLC.
List all water treatment chemicals used over this reporting period
Sodium Hypochlorite 12%
Drinking-Water Systems Regulation O. Reg. 170/03
Drinking Water Systems Regulations
(PIBS 4435e01) December 2011
Page 3 of 4
Were any significant expenses incurred to?
[X] Install required equipment
[X] Repair required equipment
[X] Replace required equipment
Please provide a brief description and a breakdown of monetary expenses incurred
-Analyzer for Lakeview ($5000)
-Eyewash repairs at Lakeview and Tower ($1,400)
-Metering chamber at Holy Cross ($55,900)
-Tower inspection and repairs ($12,500)
-Painting of tower—engineering only ($4,300)
-SCADA upgrades and maintenance ($2,500)
-Tower flow meter replacement ($16,000)
-PB02 chamber upgrades ($18,000)
-Replace V001 bypass valve ($2,000)
-E038 repairs ($4800)
-Spare watermain repair parts ($2,500)
-Nova Scotia Line watermain repair ($10,000)
-Leak detection and datalogging at VO01 ($4,800)
-Leak repair on Nova Scotia Line ($1,000)
-Chlorine feed pump ($1,700)
-Chemical feed pump rebuild kits ($950)
-Thawing machine ($1,000)
-Hydrant parts ($1,500)
-Submersible portable pump ($350)
Provide details on the notices submitted in accordance with subsection 18(1) of the Safe
Drinking-Water Act or section 16-4 of Schedule 16 of O.Reg.170/03 and reported to Spills
Action Centre
Incident
Date Parameter Result Unit of
Measure Corrective Action Corrective
Action Date
n/a n/a n/a n/a n/a n/a
Microbiological testing done under the Schedule 10, 11 or 12 of Regulation 170/03, during
this reporting period.
No. of
Samples
Collected
Range of E.Coli
Results
(cfu/100mL)
Range of Total
Coliform Results
(cfu/100mL) Number
of HPC
Samples
Range of HPC Results
(cfu/mL)
for period
being
reported
Minimum
#
Maximum
#
Minimum
#
Maximum
#
Minimum
#
Maximum
#
Distribution 170 0 0 0 0 66 0 30
Drinking-Water Systems Regulation O. Reg. 170/03
Drinking Water Systems Regulations
(PIBS 4435e01) December 2011
Page 4 of 4
Operational testing done under Schedule 7, 8 or 9 of Regulation 170/03 during the period
covered by this Annual Report.
No. of Samples
Collected
Range of Results
Minimum Maximum
Free Chlorine
Residual(mg/L) 367 0.42 2.28
Summary of additional testing and sampling carried out in accordance with the
requirement of an approval, order or other legal instrument.
Date of legal instrument
issued Parameter Date Sampled Result Unit of Measure
n/a n/a n/a n/a n/a
Summary of lead testing under Schedule 15.1 during this reporting period
(applicable to the following drinking water systems; large municipal residential systems, small
municipal residential systems, and non-municipal year-round residential systems)
Location Type Number of
Samples
Range of Lead Results
(min#) – (max #)
Unit of
Measure
Number of
Exceedances
Plumbing n/a n/a n/a n/a
Distribution n/a n/a n/a n/a
Summary of Organic parameters sampled during this reporting period or the most recent
sample results
DISTRIBUTION WATER Sample Date
(mm/dd/yyyy) Sample Result MAC
Number of
Exceedances
MAC 1/2 MAC
Trihalomethane: Total
(ug/L)
Annual
Running
Average
37.25 100.00 No No
List any Inorganic or Organic parameter(s) that exceeded half the standard prescribed in
Schedule 2 of Ontario Drinking Water Quality Standards.
Parameter Result Value Unit of Measure Date of Sample
n/a n/a n/a n/a
NOTE: For
continuous
monitors use 8760
as the number of
samples.
}
fY' Ontario Drinking-Water Systems Regulation O. Reg. 170/03
OPTIONAL ANNUAL REPORT TEMPLATE
Drinking-Water System Number: 260004748
Drinking-Water System Name: Bayham Distribution System
Drinking-Water System Owner: The Corporation of the Municipality of Bayham
Drinking-Water System Category: WD Large Municipal Residential
Period being reported: 2015
Complete if your Category is Large Municipal Complete for all other Categories.
Residential or Small Municipal Residential
Does your Drinking-Water System serve Number of Designated Facilities served:
more than 10,000 people? Yes [ ] No [ x ] N/A
Is your annual report available to the public Did you provide a copy of your annual
at no charge on a web site on the Internet? report to all Designated Facilities you
Yes [ x ] No [ ] serve?
Yes [ ] No [ ]
Location where Summary Report required
under O. Reg. 170/03 Schedule 22 will be Number of Interested Authorities you
available for inspection. report to:
1 Chatham St. Did you provide a copy of your annual
Port Burwell, Ont. report to all Interested Authorities you
NOJ 1 TO report to for each Designated Facility?
Yes [ ] No [ ]
Note: For the following tables below, additional rows or columns may be added or an
appendix may be attached to the report
List all Drinking-Water Systems (if any), which receive all of their drinking water from
your system:
Drinking Water System Name Drinking Water System Number
N/A
Did you provide a copy of your annual report to all Drinking-Water System owners that
are connected to you and to whom you provide all of its drinking water?
Yes [ ] No [ ]
Drinking Water Systems Regulations Page 1 of 6
(PTBS 4435e01)February 2008
eit- Ontario Drinking-Water Systems Regulation O. Reg. 170/03
Indicate how you notified system users that your annual report is available, and is free of
charge.
[x] Public access/notice via the web
[x] Public access/notice via Government Office
[ ] Public access/notice via a newspaper
[ x] Public access/notice via Public Request
[ ] Public access/notice via a Public Library
[x] Public access/notice via other method_water
bills
Describe your Drinking-Water System
The Bayham water distribution system consists of various size transmission mains and
apparatuses including 81 fire hydrants, 100 main valves and 4 air release and 3 drain
chambers. The location of these are mainly located in the villages of Port Burwell and
Vienna. The estimated service population is less than 2000 with 820 fully metered
service connections. A booster pump station is located on the transmission main to
Vienna. This pump operates when the pressure drops to activate the pump which would
normally occur during fire flows or main line flushing.
List all water treatment chemicals used over this reporting period
No chemicals - stand alone distribution system that receives treated water.
Were any significant expenses incurred to?
[x ] Install required equipment
[x] Repair required equipment
[ x ] Replace required equipment
Please provide a brief description and a breakdown of monetary expenses incurred
$610,564 --- regulatory operating expenses including purchase of water
Capital costs incurred for 2015 totaled $5,000 for radio water meter head replacements.
Drinking Water Systems Regulations Page 2 of 6
(PTBS 4435e01)February 2008
}
fY' Ontario Drinking-Water Systems Regulation O. Reg. 170/03
Provide details on the notices submitted in accordance with subsection 18(1) of the Safe
Drinking-Water Act or section 16-4 of Schedule 16 of O.Reg.170/03 and reported to
Spills Action Centre
Incident Parameter Result Unit of Corrective Action Corrective
Date Measure Action Date
Aug. Total Coliforms 82 Count Flushed and Aug.
6/2015 /100mL resampled. 11/2015
Microbiological testing done under the Schedule 10, 11 or 12 of Regulation 170/03,
during this reporting period.
Number Range of E.Coli Range of Total Number Range of HPC
of Or Fecal Coliform of HPC Results
Samples Results Results Samples (min#)-(max#)
(min#)-(max#) (min#)-(max#)
Raw
Treated
Distribution 177 0 0 177 <10 - 960
Operational testing done under Schedule 7, 8 or 9 of Regulation 170/03 during the
period covered by this Annual Report.
Number of Range of Results
Grab (min#)-(max#) NOTE: For continuous
Samples monitors use 8760 as the
Turbidity number of samples.
Chlorine 665 0.20— 1.85 (free)
Fluoride(If the
DWS provides
fluoridation)
NOTE: Record the unit of measure if it is not milligrams per litre.
Drinking Water Systems Regulations Page 3 of 6
(PIBS 4435e01)February 2008
N_
L' Ontario Drinking-Water Systems Regulation 0. Reg. 170/03
Summary of additional testing and sampling carried out in accordance with the
requirement of an approval, order or other legal instrument.
Date of legal instrument Parameter Date Sampled Result Unit of Measure
issued
Summary of Inorganic parameters tested during this reporting period or the most
recent sample results
Parameter Sample Date I Result Value Unit of Measure Exceedance
Antimony
Arsenic
Barium
Boron
Cadmium
Chromium
*Lead
Mercury
Selenium
Sodium
Uranium
Fluoride
Nitrite
Nitrate
*only for drinking water systems testing under Schedule 15.2; this includes large municipal non-
residential systems, small municipal non-residential systems,non-municipal seasonal residential
systems, large non-municipal non-residential systems, and small non-municipal non-residential
systems
Summary of lead testing under Schedule 15.1 during this reporting period
Drinking Water Systems Regulations Page 4 of 6
(PIBS 4435e01)February 2008
Ontario Drinking-Water Systems Regulation O. Reg. 170/03
(applicable to the following drinking water systems; large municipal residential systems, small
municipal residential systems, and non-municipal year-round residential systems)
Number of Range of Number of
Location Type Alkalinity Results
Samples Exceedances
(min#)—(max#)
Plumbing
Distribution 8 lead, pH and 95-128 alk. 0
alkalinity pH= 7.09-7.88
Lead =<0.01-1.62
lag/L
Summary of Organic parameters sampled during this reporting period or the most
recent sample results
Parameter Sample Result Unit of Exceedance
Date Value Measure
Alachlor
Aldicarb
Aldrin+Dieldrin
Atrazine+N-dealkylated metobolites
Azinphos-methyl
Bendiocarb
Benzene
Benzo(a)pyrene
Bromoxynil
Carbaryl
Carbofuran
Carbon Tetrachloride
Chlordane(Total)
Chlorpyrifos
Cyanazine
Diazinon
Dicamba
1,2-Dichlorobenzene
1,4-Dichlorobenzene
Dichlorodiphenyltrichloroethane(DDT)+
metabolites
1,2-Dichloroethane
1,1-Dichloroethylene
(vinylidene chloride)
Dichloromethane
2-4 Dichlorophenol
2,4-Dichlorophenoxy acetic acid(2,4-D)
Diclofop-methyl
Dimethoate
Drinking Water Systems Regulations Page 5 of 6
(PIBS 4435e01)February 2008
r�
L' Ontario Drinking-Water Systems Regulation O. Reg. 170/03
Dinoseb
Diquat
Diuron
Glyphosate
Heptachlor+Heptachlor Epoxide
Lindane(Total)
Malathion
Methoxychlor
Metolachlor
Metribuzin
Monochlorobenzene
Paraquat
Parathion
Pentachlorophenol
Phorate
Picloram
Polychlorinated Biphenyls(PCB)
Prometryne
Simazine
THM 2015 61.5 ug/L
(NOTE:show latest annual average)
Temephos
Terbufos
Tetrachloroethylene
2,3,4,6-Tetrachlorophenol
Triallate
Trichloroethylene
2,4,6-Trichlorophenol
2,4,5-Trichlorophenoxy acetic acid(2,4,5-T)
Trifluralin
Vinyl Chloride
List any Inorganic or Organic parameter(s) that exceeded half the standard prescribed
in Schedule 2 of Ontario Drinking Water Quality Standards.
Parameter Result Value Unit of Measure Date of Sample
THM 55 ug/L Jan. 12 /2015
THM 41 ug/L April 7/2015
THM 70 ug/L July 6/2015
THM 80 ug/L Oct. 5/2015
Drinking Water Systems Regulations Page 6 of 6
(PIBS 4435e01)February 2008
2015 ANNUAL
SUMMARY REPORT FOR MUNICIPAL WATER SYSTEMS
Report
This report is a summary of water quality information for the Bayham Water
Distribution System,Water Works#260004748, published in accordance with
Schedule 22 of the Ontario's Drinking Water Systems Regulation for the reporting
period of January 1, 2014 to December 31, 2015. The Bayham Water Distribution
System is categorized as a Class I, Large Municipal Residential Drinking Water System.
Who gets a copy of the Report:
The owner of the drinking—water system shall ensure that the following receive the
summary report no later than March 31 for the preceding calendar year;
in the case of a drinking water system owned by a municipality, the members of
the Municipal Council;
in the case of a drinking water system owned by a municipal service board
established under section 195 of the Municipal Act, 2001, the members of the
municipal service board; or
in the case of a drinking water system owned by a corporation, the board of
directors of the corporation.
What must the Report contain?
The report must,
(a) list the requirements of the Act, the regulations, the system's approval and any
order that the system failed to meet at any time during the period covered by
the report and specify the duration of the failure; and
(b) for each failure referred to in clause (a), describe the measures that were taken
to correct the failure.
The Bayham Water Distribution System complied with the following Drinking Water
Legislation;
Safe Drinking Water Act
O. Reg 170/03, O. Reg 128/04
System Drinking Water Licence # 061-101
Note: MOE inspection conducted on October 23, 2015 indicates full compliance as a
100% score was achieved.
What else must the report contain?
The report must also include the following information for the purposes of enabling the
owner of the system to assess the capability of the system to meet existing and planned
uses of the system:
A summary of the quantities and flow rates of the water supplied during the
period covered by the report;
A comparison of the summary referred to in paragraph 1 to the rated capacity and
flow rates approved in the system's approval.
Attachments
2015 flows
Report Prepared by;
Ed Roloson, CMM III
Water/Wastewater Operations Manager
Overall Responsible Operator (ORO)