Loading...
HomeMy WebLinkAbout2010 - Port Burwell Wastewater Treatment Plant January 17, 2011 Ann Neary District Manager Ministry of the Environment 733 Exeter Rd. London, ON N6E 1L3 Re: Annual Reporting as per C of A#6348—7QAJBF for the Port Burwell Wastewater Treatment plant. Dear: Madam Neary The following is a summary of the year 2010 operations for the Port Burwell Wastewater Treatment Plant, owned and operated by the Municipality of Bayham in accordance with the conditions set out in section#10 (6) of the above said C of A. Section a. The attached spreadsheet entitled Annual Compliance Summary captures the monthly treatment performance of the wastewater treatment plant along with compliance and objective criteria met. b. There were no significant operational problems encountered in 2010. c. All equipment was maintained on a routine basis, following manufactures recommendations and or past operating history. These records are available at the wastewater treatment plant for review at any time. d. Daily in house lab work and visual inspections of the treatment process are the tools used to make adjustments for continued effluent quality. e. HTC Instrumentation calibrates flow-metering equipment on an annual basis. The calibration report is available at the wastewater treatment plant for review at any time. The in house lab equipment is calibrated on a regular basis by operations staff. f. See attached spreadsheet for the effluent objectives that were met during the 2010 reporting period. g. Biosolids are hauled to land under the organic conditional site#S-0506-30 and S-0513-41. A total of 1336.5 m3 was hauled in the spring and fall to a total area of 41.8 acres. Records are available for review at the wastewater treatment plant. h. A sulphide reducing chemical known as Bioxide is being injected into the system at various locations in the collection system which has proven to successfully reduce odour complaints. i. There were no spills or abnormal discharge events to report during 2010. Please do not hesitate to call me with any question or concerns at 519-874-4761. Sincerely, Ed Roloson Water/Wastewater Superintendent ( ORO) Port Burwell Wastewater Treatment Plant Year: 2010 Municipality of Bayham Works#: 110001319 Population Served: 2530 Annual Compliance Summary Design Avg Flow(m3): 1060 FLOWS BIOCHEMICAL 02 DEMAND SUSPENDED SOLIDS PHOSPHORUS NITROGEN SERIES EFFLUENT SEPTAGE 2010 Total Avg.Day Max Day Avg.Raw Avg.Raw Avg.Eff. Avg.Load Avg.Raw Avg.Eff. Avg.Load Avg.Raw Avg.Eff. Avg.Load Avg.Eff. Avg.Load Avg.Eff. Avg.Eff. E.Coli DO pH RECEIVAGE Flow Flow Flow CBOD CBOD CBOD CBOD SS SS SS Phos. Phos. Phos. NH3+NH4 NH3+NH4 Nitrate Nitrite Geo.Mean VOLUMES Month m3 m3 m3 (mg/L) (kg/day) (mg/L) (kg/day) (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) (kg/day) (mg/L) (kg/day) (mg/L) (mg/L) cnt/100m1 mg/L m' January 17346 598.1 964.0 200.0 119.62 5.00 2.99 272.5 7.90 4.72 6.54 0.60 0.36 0.19 0.11 16.35 0.12 45.69 5.26 7.98 February 13524 483.0 602.0 248.3 119.93 4.50 2.17 381.8 6.50 3.14 7.55 0.50 0.24 0.54 0.26 17.73 0.13 0.03 5.28 7.57 March 19154 660.5 897.0 254.0 167.77 5.80 3.83 294.8 8.80 5.81 5.35 0.38 0.25 1.98 1.31 11.87 0.15 3.59 5.38 7.48 April 20705 714.0 1438.0 176.8 126.24 3.00 2.14 189.8 5.80 4.14 5.74 0.26 0.19 1.63 1.16 10.91 0.28 51.88 5.34 7.83 May 21307 734.7 1040.0 170.0 124.90 2.20 1.62 191.2 3.90 2.87 5.08 0.30 0.22 0.47 0.35 10.56 0.17 1.39 5.37 7.59 June 18708 645.1 1111.0 189.8 122.44 2.00 1.29 246.3 3.30 2.13 7.08 0.28 0.18 0.67 0.43 9.58 0.06 140.34 5.23 7.53 73 July 20274 654.0 793.0 134.8 88.16 2.30 1.50 206.0 4.80 3.14 3.83 0.13 0.09 1.55 1.01 5.60 0.07 49.72 5.11 7.89 174 August 19597 632.2 818.0 303.2 191.68 2.20 1.39 2086.6 2.90 1.83 11.97 0.16 0.10 1.85 1.17 4.18 0.07 28.00 5.36 7.82 175 September 17900 596.7 691.0 242.3 144.58 2.80 1.67 1542.0 3.30 1.97 7.92 0.56 0.33 1.43 0.85 8.46 0.19 5.09 5.66 7.88 61 October 19444 627.2 763.0 153.5 96.28 3.00 1.88 492.8 4.50 2.82 6.25 0.12 0.08 0.70 0.44 11.68 0.09 34.68 5.27 7.98 November 19162 639.4 900.0 228.8 146.29 2.00 1.28 1102.8 2.60 1.66 5.70 0.34 0.22 0.16 0.10 14.98 0.06 23.76 5.36 7.96 December 22646 781.0 993.0 275.8 215.40 2.00 1.56 1774.0 3.60 2.81 8.10 0.28 0.22 0.12 0.09 12.45 0.06 7.22 5.18 7.53 AVERAGE 19147.3 647.2 917.5 [214.8 138.61 3.07 1.94 731.72 4.83 3.09 6.76 0.33 0.21 0.94 0.61 11.20 0.12 32.62 5.32 7.75 121 MAXIMUM 22646.0 781.0 1438.0 303.2 215.40 5.80 3.83 2086.60 8.80 5.81 11.97 0.60 0.36 1.98 1.31 17.73 0.28 5.66 7.98 175 CRITERIA Apr 16-Nov 30 1060.0 < 15 15.90 < 15 15.90 <1.0 1.06 <2 2.16 200.00 CRITERIA Dec 1-Apr 15 1060.0 < 15 15.90 < 15 15.90 <1.0 1.06 <5 5.30 none MEETS Concentration Criteria YES YES YES YES YES YES YES YES Yes OBJECTIVES non-freezing 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <1 1.06 150.00 _ >5 OBJECTIVES freezing 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <3 3.18 150.00 >5 Reasons for failure/Other Problems: Remedial Actions: Effluent at Outfall Sewer MH79 Sample Date: 26-Apr-10 Effluent discharge to the Big Otter Creek Parameters Result CBOD[mg/L[ 3 Total Suspended Solids[mg/L1 4 Total Phosphorus[mg/L] 0.27 Nitrogen-Kjeldahl(N)[mg/LI 5.8 Ammonia+Ammonium(.N)[mg/L] 5 Nitrite(as nitrogen)[mg/L] 0.31 Nitrate(as nitrogen)[mg/LJ 7.63 Nitrate+Nitrite(as nitrogen)[mg/L] 7.94