Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2020 - Second Quarter - Port Burwell Wastewater Treatment Plant
Port Burwell Wastewater Treatment Plant Year:2020 Municipality of Bayham Works # :110001319 Population Served:2530 Annual Compliance Summary Design Avg Flow (m3):1060 FLOWS BIOCHEMICAL 02 DEMAND SUSPENDED SOLIDS PHOSPHORUS NITROGEN SERIES EFFLUENT SEPTAGE Dec 1 - Apr 15 Apr 16 - Nov 30 Dec 1 - Apr 15 Apr 16 - Nov 30 2020 Total Avg. Day Max Day Avg. Raw Avg. Raw Avg. Eff.Avg. Load Avg. Raw Avg. Eff.Avg. Load Avg. Raw Avg. Eff.Avg. Load Avg. Raw Avg. Eff.Avg. Eff.Avg. Eff.Avg. Load Avg. Load Avg. Eff.Avg. Eff.Avg. Eff.Avg. Loading Federal (WSER)E. Coli DO Minimum Maximum Minimum Maximum RECEIVAGE Flow Flow Flow CBOD CBOD CBOD CBOD SS SS SS Phos.Phos.Phos.TKN TKN NH3 + NH4 NH3 + NH4 NH3 + NH4 NH3 + NH4 Nitrate Nitrite Un-ionized Un-ionized Un-ionized Geo. Mean Temp.Temp.pH pH VOLUMES Month m3 m3 m3 (mg/L)(kg/day)(mg/L)(kg/day)(mg/L)(mg/L)(kg/day)(mg/L)(mg/L)(kg/day)(mg/L)(mg/L)(mg/L)(mg/L)(kg/day)(kg/day)(mg/L)(mg/L)NH3 + NH4 (mg/L) NH3 + NH4 (mg/L) NH3 + NH4 (mg/L) cnt/100ml mg/L 0C 0C m3 January 27527 949.2 1798.0 152.5 144.75 6.0 5.70 176.0 9.6 9.11 2.78 0.36 0.34 35.58 5.53 2.43 2.31 3.07 0.36 0.0063 0.0060 22.40 5.32 8.8 13.3 7.12 7.49 February 21294 734.3 923.0 224.0 164.48 3.3 2.42 194.8 6.7 4.92 4.19 0.42 0.31 44.85 3.33 1.48 1.09 7.34 0.34 0.0046 0.0034 4.43 5.33 8.0 9.4 7.11 7.31 March 27238 939.2 1329.0 174.2 163.61 7.8 7.33 212.2 10.7 10.05 3.48 0.51 0.48 35.75 6.88 2.92 2.74 2.85 10.10 0.0101 0.0095 13.69 5.22 8.9 9.6 7.16 7.41 April 25356 874.3 1077.0 160.0 139.89 3.5 3.06 154.4 7.5 6.56 3.46 0.23 0.20 38.23 6.78 3.40 3.40 2.97 2.97 2.91 0.67 0.0125 0.0109 65.60 5.31 9.3 10.8 7.01 7.41 May 22074 761.2 1014.0 232.0 176.60 6.0 4.57 276.0 8.7 6.62 4.41 0.34 0.26 45.50 8.82 4.17 3.17 2.57 0.37 0.0186 0.0141 40.26 5.25 11.3 15.6 7.09 7.38 June 16877 582.0 661.0 303.8 176.81 4.8 2.79 238.6 7.4 4.31 5.66 0.25 0.15 59.06 2.62 0.81 0.47 4.47 0.27 0.0043 0.0025 11.34 5.34 14.4 18.9 7.10 7.29 July 0.00 0.00 0.00 0.00 0.0000 August 0.00 0.00 0.00 0.00 0.0000 September 0.00 0.00 0.00 0.00 0.0000 October 0.00 0.00 0.00 0.00 0.0000 November 0.00 0.00 0.00 0.00 0.0000 December 0.00 0.00 0.00 0.00 0.0000 AVERAGE 23394.3 806.7 1133.7 207.8 80.51 5.23 2.16 208.67 8.43 3.46 4.00 0.35 0.14 43.16 5.66 2.56 2.79 2.28 2.21 3.87 2.02 0.0094 0.0039 26.29 5.30 10.1 12.9 7.10 7.38 #DIV/0! MAXIMUM 27527.0 949.2 1798.0 303.8 176.81 7.80 7.33 276.00 10.70 10.05 5.66 0.51 0.48 59.06 8.82 3.40 4.17 2.97 3.17 7.34 10.10 0.0186 0.0141 0.000 5.34 14.4 18.9 7.16 7.49 0.00 CRITERIA Apr 16 - Nov 30 1060.0 <15 15.90 <15 15.90 < 1.0 1.06 < 2 2.16 0.10 0.106 1.25 200.00 CRITERIA Dec 1 - Apr 15 1060.0 <15 15.90 <15 15.90 < 1.0 1.06 < 5 5.30 0.10 0.106 1.25 none MEETS Concentration Criteria YES YES YES YES YES YES YES NO YES NO YES YES YES Yes OBJECTIVES Apr 16 - Nov 30 1060.0 <10 10.60 <10 10.60 < 0.75 0.80 < 1 1.06 0.10 0.106 1.25 150.00 > 5 OBJECTIVES Dec 1 - Apr 15 1060.0 <10 10.60 <10 10.60 < 0.75 0.80 < 3 3.18 0.10 0.106 1.25 150.00 > 5 Reasons for failure / Other Problems:Remedial Actions: July 2014 - Federal (WSER) un-ionized ammonia sampling is no longer required.EFFLUENT MONITORING - OUTFALL SEWER MH79 April and May ammonia non-compliances due to high flows due to heavy rain events - both occurrences reported to the MECP via emails dated May 6th and June 5th Sample Date : Parameter Result (mg/L)Parameter Result (mg/L) CBOD5 12 pH 7.29 Total Suspended Solids 15 Dissolved Oxygen 5.11 Total Phosphorus 0.23 Temperature 11.4 Total Kjeldahl Nitrogen 10.3 Un-ionized Ammonia 0.0361 Total Ammonia 9.0 E.coli 2 Nitrate 1.32 Effluent discharge to the Big Otter Creek Nitrite 0.25