HomeMy WebLinkAboutOctober 03, 2019 - Council - Addendum THE CORPORATION OF THE MUNICIPALITY OF BAYHAM
COUNCIL MEETING ADDENDUM
MUNICIPAL OFFICE
Thursday, October 3, 2019
1. ADMINISTRATION
A. Report CAO-59/19 by Paul Shipway, CAOICIerk re Investing in Canada Infrastructure
Program (ICIP) — Community Culture & Recreation Stream — Straffordville Community
Centre Community Hub
2. OTHER BUSINESS
2.1 In Camera
A. Confidential Item regarding a proposed or pending acquisition or disposition of land by the
municipality or local board; a position, plan, procedure, criteria or instruction to be applied
to any negotiations carried on or to be carried on by or on behalf of the municipality or local
board (Bayham Historical Society)
2.2 Out of Camera
YHA
14-11111row' "glE4LIO
REPORT
op �o��� CAO
pol tunity Is
TO: Mayor& Members of Council
FROM: Paul Shipway, CAOICIerk
DATE: October 3, 2019
REPORT: CAO-59/19
SUBJECT: INVESTING IN CANADA INFRASTRUCTURE PROGRAM (ICIP) —
COMMUNITY CULTURE & RECREATION STREAM — STRAFFORDVILLE
COMMUNITY CENTRE COMMUNITY HUB
BACKGROUND:
On August 19, 2019, the Province of Ontario Minister of Infrastructure launched the Investing in
Canada Infrastructure Program (ICIP)— Community Culture & Recreation Stream. The ICIP
Community Culture & Recreation Stream objective is to support community infrastructure
priorities across the province, improving access to and/or quality of community, cultural, and
recreation priority infrastructure projects.
Applications to the ICIP — Community Culture & Recreation Stream are due November 12,
2019. The ICIP — Community Culture & Recreation Stream application consists of a standard
application, comprehensive technical schedule and a business case requirement.
ICIP — Community Culture & Recreation Stream eligible asset types include:
• Community centres/hubs (e.g., multi-purpose spaces that bring together a variety of
different services, community centres including recreation facilities)
• Recreation facilities (e.g., hockey arenas, multipurpose recreation centres, playing fields)
• Cultural facilities (e.g., theatres, libraries, museums, cultural centres, civic squares,
performing arts centres)
• Education and health facilities advancing Truth and Reconciliation Commission Calls to
Action (e.g., funding for new and/or existing Indigenous healing centres, spaces in
education facilities for traditional teaching/programming)
The ICIP Community Culture & Recreation Stream funding allocation model is as follows:
Investing in Canada Infrastructure Program (ICIP)
Rural & Northern Stream Funding Share
Federal Provincial Municipal
40% (Max.) 33.33% (Max.) 26.67% (Min.)
On September 5, 2019 the Council of the Corporation of the Municipality of Bayham passed the
following resolution:
THAT Report CAO-52/19 re Investing in Canada Infrastructure Program
(ICIP) - Community Culture & Recreation Stream be received for
information;
AND THAT Council provide staff direction to utilize Facility Reserve Funds
to finalize design details for the Investing in Canada Infrastructure Program
(ICIP) – Community Culture & Recreation Stream grant application;
AND THAT Council direct staff to make application to the Investing in
Canada Infrastructure Program (ICIP) — Community Culture & Recreation
Stream for the following projects:
1. Straffordville Community Centre Community Hub
DISCUSSION
Staff have completed initial high-level costing on potential grant components for Council
consideration as follows:
STRAFFORDVILLE COMMUNITY HUB
This project would include the enhancement and redesign of ancillary structures at the
Straffordville Community Hub into combined structures towards further diversification and multi-
use abilities of the facilities at the Straffordville Community Centre.
ITEM NO. 1A-FA-08 STRAFFORDVILLE FOOD BOOTH BUILDING
Estimated Capital Cost $350,000
Estimated Operating Impact –$5,000
Notes: This would consist of major renovations on
the existing Food Booth building
incorporating a commercial kitchen and
washrooms.
OR
ITEM NO. 1B -FA-08 STRAFFORDVILLE FOOD BOOTH BUILDING
Estimated Capital Cost $1,200,000
Estimated Operating Impact –$5,000
Notes: This would consist of demolition of the
existing Food Booth building. Reconstruction
of a smaller concrete pad in conjunction with
construction of a covered pavilion, extending
off the rear of the existing Community Centre,
incorporating an indoor commercial kitchen,
washrooms and storage space, with upper
level meeting/office space (abutting the
SCC). This would include a direct link from
the commercial kitchen to the Straffordville
Community Centre and possible reduction of
ancillary hydro services.
ITEM No. 2 -FA-01 SCC HVAC
Estimated Capital Cost $52,000
_Estimated Operating Impact N/A
Notes: This item is carried in the 2020 Capital
Budget. This project should result in a minor
reduction in utilities due to increased
efficiency of the devices
ITEM NO. 3 -FA-07 SCC WATER TREATMENT SYSTEM
Estimated Capital Cost $20,000 - $40,000
Estimated Annual Operating Impact $15,000 - $25,000
Notes: Treatment requirements are based on two
main functions, source water chemistry and
required water capacity to be treated.
Treatment and operations of this type of
public facility falls under Ontario Regulation
319/08.
ITEM NO.4 -FA-12 SCC OLD CHAPEL PARKING
Estimated Capital Cost $40,000
Estimated Annual Operating Impact N/A
Notes: Would provide parking on Old Chapel and
staff access to the SCC.
ITEM NO. 5 -PR-01 -STRAFFORDVILLE PAVILION
Estimated Capital Cost $10,000
Estimated Annual Operating Impact N/A
Notes: Replacement of external steel as a lifecycle
upgrade and to match existing buildings.
ITEM NO. 6 -PR-02—STRAFFORDVILLE STORAGE SHEDS—PORTABLE SOCCER NETS
Estimated Capital Cost $25,000
Estimated Annual Operating Impact N/A
Notes: Replacement of external steel as a lifecycle
upgrade and to match existing buildings.
ITEM NO. 7— BALL DIAMOND LIGHTS
Estimated Capital Cost $89,000
Estimated Annual Operating Impact N/A
Notes: This project should result in a minor reduction
in utilities due to increased efficiency of the
devices. This will result in reduced
maintenance fees.
ITEM No. 7—ACCESSIBLE WALKING TRAIL
Estimated Capital Cost $145,000
Estimated Annual Operating Impact N/A
Notes: Approximately 700 metres of concrete
accessible walking trail throughout the SCC
grounds. Would create accessible viewing
and access to all facilities on site. If
maintained in the winter would have an
operating budget impact. Includes minor
fence alterations.
ITEM NO. 8—PLAYGROUND—ACCESSIBLE PLAYGROUND MODIFICATION
Estimated Capital Cost $200,000
Estimated Annual Operating Impact N/A
Notes: Would include addition of two accessible play
structures and installation of rubberized
accessible surface increasing playground
size to approximately 580 m2.
The estimates provided are based on preliminary assessment. The Municipality would need to
incorporate contingency and inflation into the same. Further, intent is to apply for the grant for
work to be conducted in 2021, so 2020 can be utilized for budgeting and procurement.
RECOMMENDATION
1. THAT Report CAO-59/19 re Investing in Canada Infrastructure Program (ICIP) —
Community Culture & Recreation Stream— Straffordville Community Centre Community
Hub be received for information;
2. AND THAT Council direct staff to make application to the Investing in Canada
Infrastructure Program (ICIP) - Community Culture & Recreation Stream grant for the
following:
Respectfully Submitted by:
Paul Shipway
CAOICIerk
23'-0" 7'-0"
/ // /
V\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \
y y1
O \ n �;
\ K \ 0�n� w'F
ITl zPA or
cf3zx
\ AOD \�Wmm�
\ a r \
AmVK!"-!"
oI
v
\ \ o ,,\ =I \ \
\/ 17'-10" Z / 5-2"
/\
Z
EXIST.8"CONCRETE BLOCK WALL
(REPAINT ALL EXISTING INTERIOR 38"DOOR
\ WALLS w/EPDXY) \
\
\ 7
\ \
,C
\ mg.G'm OOx7
\ 0o N m
\ N 4 m A Z x Z
\ A o -
,s14"oyWS
A
AO m9A =A \\ n � m›
o\ zmT
zNm
\ gOGoZ mrE1- Ar Of
Q)
OoWKMTozyO5myi \ o
mtiA co cm z®Amo o
\ gnq 0 - W85 om \
\ mz 0 m '='4 "K \ mc,m - ,
o o W o
EXISTING \
ROOF TRUSSES y
\ \
\ 10'-03/8" 12'-6" \
\/ // /-
\ \
\ NEW 6"CONCRETE BLOCK WALL \
\ �\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\
\ R
38"DOOR 38"DOOR
\ \
o \, / �@, ,\ \
\ \f"' 1 1 r I l ) \
\v Bs' 77 Int \
\ V n
L7 i EXISTING O.H. DOOR(MAKE[\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \
I_ FINISHES GOOD)OR NEW
INSULATED 0.-DOOR(TO
MATCH EXISTING)
c PROJECT TITLE: PROJECT ID.: CEC-18-0718
ao
> MUNICIPALITY OF BAYHAM �
DRAWN BY: JDG a centric A
N c ENGINEERING
o STRAFFORVILLE, ONTARIO DATE ISSUED: 2018/07/04 STRUCTURAL ENGINEERSlil ,��
0 BASEBALL TITLE:
DIAMOND ACCESSORY-ISSUED FOR: 3/16 PRICING 1LONDON,UPONRNDBH050SUITE 200
L8 CAMBRIDGE,ON,NER 60RTH �t1`
BUILDING FLOOR PLAN T
TELEPHONE:(519)963-0444
REFERENCE: N/A
I! 1 ygge
.R 1 Y P I
AA-alt ig M
Aa iia a4
E yea Rig 1S 'g.
155 th b %_
:11a
Z
"-4 r'lI®11 11
�"� (�-3
VN ^3$i
ow. EXISTING HALL EXISTING HALL BELOW �` �q$ FF
� gg V �
8
11 e'-O"PASS- � ppi
PJ
•
ggI 999 H 10''V°'R°.� \ % LE vnNoows ALONG THIS 1 �Jd?IvR
.......E, 'X SERVER COUNTER xALL�LL LOOKING INTO EXISTING IS QQ.g
ELOW ,
STORAGE VParil
_ JANITOR 11 JANITOR
�� -:.A. 29-G.
2 HEN .w.o- MB 1M �� ��u� s-o na-s g$
u-.0-o . 8g
---' s.ox .mw ` www •I W�Re. ,/�p__ E zrW/R e1,� i49A:1
AS :'1®1444
�
--„,„->i PREPARATION COUNTER *. CORRIDOR ® Y MEETING NyR00M w C 44S '''t111
+ --- . ;/-- /' gig;lid;
zr mat
-I CANTEEN 'jB 1 /'
Q I(V!1/1i \M C _ _ STORAGE
.r-o mown MOM N WNIVERSAL W/p 7, H. P __
®®e ® l $ guw
iiiiitii»iiiiiiiiiiiiiiiiiiyiiii�i��ii/iiiiiiiiiiiiiiii?)iii iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiii(iiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiiw//ii/iiiiiiiiiiiiii{iii/
, • o
s-o PAs:-THRG I
il
e I1A
8
0 ® SLOPE SLOPE w
o>
COVERED PAVILLION �+ BB
A
p. gag ah
o
ANEW o
® (EXISTING CONCRETE E0)7` Q 12
TA s
m= .
a
Of b a¢z
�E
>U i Oi
RSLOPE SLOPE - J BC - 0
L , e6E w0i
GZ 2LL
gay FWI A
s oxavnxa x...
' 1 MAIN FLOOR ADDITION 2 MEZZANINE FLOOR PLAN
5 410 SCALE:yr-1.-T A1.0 SCALE:1fi4.-1.-T Al.0