Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2019 - First Quarter - Port Burwell Wastewater Treatment Plant
Port Burwell Wastewater Treatment Plant Year: 2019 Municipality of Bayham Works#: 110001319 Population Served: 2530 Annual Compliance Summary Design Avg Flow(ms): 1060 FLOWS BIOCHEMICAL 02 DEMAND SUSPENDED SOLIDS PHOSPHORUS NITROGEN SERIES EFFLUENT SEPTAGE 2018 Total Avg.Day Max Day Avg.Raw Avg.Raw Avg.Eff. Avg.Load Avg.Raw Avg.Eff. Avg.Load Avg.Raw Avg.Eff. Avg.Load Avg.Raw Avg.Eff. Avg.Eff. Avg.Load Avg.Eff. Avg.Eff. Avg.Eff. Avg.Loading Federal(WSER) E.Coli DO Minimum Maximum Minimum Maximum RECEIVAGE Flow Flow Flow CBOD CBOD CBOD CBOD SS S5 5S Phos. Phos. Phos. TKN TKN NH,+NH4 NH,+NH. Nitrate Nitrite Un-Ionized Un-Ionized Un-ionized Geo.Mean Temp. Temp. pH pH VOLUMES Month _ m3 m3 m3 (mg/L) (kg/day) (mg/L) (kg/day) (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) NH,+NH4(mg/L)NH,+NH4(mg/L)NH,+NH4(mg/L cnt/100m1 mg/L -c -c en- January 21058 726.1 1045.0 174.0 126.34 4.0 2.90 185.4 8.1 5.88 4.30 0.37 0.27 43.74 2.38 0.68 0.49 15.11 0.17 0.0021 0.0015 8.37 5.31 6.8 11.0 7.06 7.40 February 22656 809.1 1211.0 211.5 171.12 4.5 3.64 183.8 4.7 3.80 4.19 0.40 0.32 40.93 7.80 2.10 1.70 7.36 2.29 0.0051 0.0041 26.41 5.28 6.5 10.1 6.89 7.51 March 22564 778.1 1136.0 194.5 151.34 7.8 6.07 162.8 13.4 10.43 4.78 0.52 0.40 44.90 1.30 0.39 0.30 10.75 1.33 0.0011 0.0008 26.32 5.28 6.1 9.2 6.67 7.35 April May June July August September October November December _ AVERAGE 22092.7 7771.1 1130.7 193.3 149.60 5.43 4.20 177.33 8.73 6.70 4.42 0.43 0.33 43.19 3.83 1.06 0.83 11.07 1.26 0.0027 0.0022 20.37 5.29 6.5 10.1 6.87 7.42 #DIV/0! MAXIMUM 22656.0 609.1 1211.0 211.5 171.12 7.80 6.07 185.40 13.40 10.43 4.78 0.52 0.40 44.90 _7.80 2.10 1.70 15.11 2.29 0.0051 0.0041 0.000 5.31 6.8 11.0 7.06 7.51 0.00 CRITERIA Apr 16-Nov 30 1060.0 < 15 15.90 < 15 15.90 <1.0 1.06 <2 2.16 0.10 0.106 1.25 200.00 CRITERIA Dec 1-Apr 15 1060.0 < 15 15.90 < 15 15.90 <1.0 1.06 <5 5.30 0.10 0.106 1.25 none MEETS Concentration Criteria YES YES YES YES YES YES YES YES YES YES YES Yes OBJECTIVES Apr16-Nov30 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <1 1.06 0.10 0.106 1.25 150.00 >5 OBJECTIVES Dec 1-Apr 15 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <3 3.18 0.10 0.106 1.25 150.00 >5 Reasons for failure/Other Problems: Remedial Actions: July 2014-Federal(WSER)un-i0vized ammonia sampling is n0 longer required. EFFLUENT MONITORING-OUTFALL SEWER MH79 Sample Date: Parameter Result(mg/L) CBOD, Total Suspended Solids Total Phosphorus Total Kjeldahl Nitrogen Total Ammonia Nitrate Effluent discharge to the Big Otter Creek Nitrite