HomeMy WebLinkAboutOctober 03, 2017 - Special Council - Budget THE CORPORATION OF THE MUNICIPALITY OF BAYHAM
COUNCIL BUDGET MEETING AGENDA
MUNICIPAL OFFICE
56169 Heritage Line, Straffordville, ON
Council Chambers
Tuesday, October 3, 2017 (if necessary)
6:30 p.m.
1. CALL TO ORDER
2. DISCLOSURES OF PECUNIARY INTEREST & THE GENERAL NATURE THEREOF
3. 2018 — 2027 DRAFT DRAFT CAPITAL BUDGET
A. Report TR-12/17 by Lorne James, Treasurer re 2018-2027 Capital Budget— Draft
i. 2018 — 2027 Capital Budget - Draft
4. ANNOUNCEMENTS
5. BY-LAW
A. By-Law 2017-096 Being a By-law to confirm all actions of Council
6. ADJOURNMENT
REPORT
TREASURY DEPARTMENT
v` 5
�c
Ppol.t unity IS�o
TO: Mayor & Members of Council
FROM: Lorne James, Treasurer
DATE: October 2, 2017
REPORT: TR-12/17 FILE NO. C-07
SUBJECT: 2018-2027 CAPITAL BUDGET - DRAFT
BACKGROUND:
Attached hereto as Appendix 'A', for Council review and direction, is the 2018-2027 Capital
Budget-Draft. The Capital Budget-Draft, as presented, introduces the recommendations
contained within the:
1) Municipality of Bayham Asset Management Plan
2) Municipality of Bayham Ontario Regulation 453/07 Water Financial Plan
3) Municipality of Bayham Roads Need Study
4) Municipality of Bayham Bridge and Culvert Study
5) Municipality of Bayham Facility Audit
6) Municipality of Bayham Storm Sewer Assessment
The presentation and consideration of a ten (10) year Capital Budget allows Council to be
aware of, and proactive towards, long-term financial commitments and to be able to strategically
financially plan for the procurement, maintenance and/or replacement of various items. The
multi-year budget also allows Council to direct staff to normalize costs so that the Capital
Budget is relatively `smooth' and does not feature drastic `peaks' in levy requirements.
Staff will present a two (2) year Operating Budget for Council consideration on January 2nd
2018.
CONSULTATION
On January 19, 2017 the Treasurer presented Report TR-3/2017 re 2018 Budget Schedule:
Budget Proposed 20168 Start Time
Budget Review Dates For
_ Discussion
Budget Public Consultation January 20, 2017 -August 31,
2017
2018 and 10 Year Capital Monday, October 2, 2017 6:30 p.m.
Plan (Special Meeting)
Tuesday, October 3, 2017 6:30 p.m.
(Special Meeting-if required)
2018 Levy Supported Tuesday January 2, 2018 6:30 p.m.
Operating Budget (Special Meeting)
Wednesday, January 3, 2018
(Special Meeting-if required) 6:30 p.m.
Thursday, January 4, 2018
(Budget Open House) 6:00 p.m. to 7:00 p.m.
As part of the consultation the following activities were conducted:
1) Posting (January 20, 2017) of a Budget Consultations webpage including:
a. Historic Capital & Operating Budgets
b. Budget formulation information
c. Terminology
d. 'How the Municipal Budget Works' and 'How Property Tax is Calculated'
explanatory videos
e. Online Public Consultation Form
2) Budget Consultation Notice (January 20, 2017)
a. Online
b. Municipal Facility Notice Boards
3) Summer Newsletter Posting
a. Included with Municipal Tax Bill
4) Availability of Treasurer to discuss all of the above.
No comments were submitted during the Capital Budget Consultation period.
DISCUSSION
The Capital Budget factors in two (2) years of Gas Tax funding as the allocations are set,
beyond 2019 a conservative estimate has been forecasted. Likewise, the Ontario Community
Infrastructure Fund (OCIF) program has set allocations for two (2) years and its continuation will
be at the discretion of the Province. Staff continuously work diligently on sourcing all potential
avenues of funding in an attempt to produce an effective and sustainable levy. It is expected
Phase 2 of the Federal Infrastructure Plan, when announced, will have an impact on Capital
Budgets beyond 2018.
The 2018-2027 Capital Budget generally aims to focus on core assets such as roads, bridges,
culverts, water, equipment and wastewater, as funding allocated through Gas Tax and OCIF is
based on the Municipality's prior Net Book Values of core assets in previous Financial
Information Returns (FIR). This fact is further reinforced by the recently enacted Jobs for
Infrastructure and Prosperity Act and forthcoming regulations under the same which will attempt
to mandate focus of primary funding; municipal, provincial and federal, towards core assets.
The Capital Budget features finite detail in the first five (5) years of the budget, 2018-2022, while
2023-2027, the final five (5) years, is broad and expected to require additional funding and
refinement, however is present to illustrate the known capital costs in future years.
The Capital Budget presented utilizes a mix of reserves, grant funding and tax levy throughout.
The Capital Budget does not rely on debt financing due to the financial realities of the
Municipality and the need to preserve debt capacity. The Treasurer has attempted to minimize
the capital impact on the levy by creating a dynamic reserve funding scheme in the later years
of the Capital Budget. This scheme suits the current Municipal financial reality and provides the
greatest opportunity to minimize the capital impact of the levy in the future, however it is not
considered a risk adverse scheme, and unplanned capital requirements have the capability to
cause complications and financial strain within the 2018-2027 capital funding model. When
reserves are utilized the transfer is noted on the bottom of the budget sheet. Of note, as per
verbal direction of Council, the 2018-2027 Capital Budget utilizes the annual Library Transfer to
fund the Facilities Reserve going forward.
As Council is aware from previous Budget Reports the Municipality of Bayham has not
historically held a normalized and stable capital levy. The 2013-2017 Capital levies were
as follows:
Historical Capital Levy 2012-2016
2013 $801,000
2014 $825,000
2015 $597,851
2016 $289,141
2017 $422,000*
Avg. $586,998
* 2017 had an additional Capital Transfer of$138,410 within the
2017 Operating Budget.
Specifically in 2015 the Municipality lowered the Capital Levy to incorporate OPP and
OMPF Funding level changes and in 2016 the Municipality lowered the Capital Levy to
incorporate the Ojibwa Financing into the Operating Budget. 2016 onward has
commenced the rebuilding of the Capital Levy to an amount which will permit stabilization
or reduction of the infrastructure funding deficit in the future.
The Municipality has several large life cycle asset replacements, betterments and
rehabilitations over the next ten years both in linear assets, rolling stock, fire equipment
and infrastructure which will be challenging based on the current financial implications.
Deferring the capital programs and replacements in the years projected only increases
the funding deficit as the replacement or rehabilitation costs will inflate annually and
make the capital deficit increase. In addition to funding capital programs as required,
proper financial management requires the reserves to be replenished to be able to fund
needs/events outside of the capital budget scope.
The above strategy and historical information results in the staff recommendation for
Council to avoid any ventures, where possible, which are not core assets and/or not risk
averse as the Municipality has limited financial resources to allocate.
The attached 2018-2027 Capital Budget Draft focuses on protecting the fair to good
condition assets and extending their useful lives as far as possible, with both operating
and capital programs, while assets that are in poor condition will be exhausted until
replacement is a necessity and in some cases upon Council direction to divest the
Corporation of the asset(s). Staff will continue to monitor the underlying metrics of upper
level government granting programs to ensure that the staff presented municipal funding
strategy aligns with said programs to maximize potential funding allocations.
RECOMMENDATION
1. THAT Report TR-12/17 re 2018-2027 Capital Budget- Draft be received for information;
2. AND THAT Council provide staff direction.
Respectfully submitted, Reviewed by,
Lorne James, CPA, CA Paul Shipway, CAOICIerk
1
INNYHAilf
Ppojtunity ISo�`�y
2018-2027 Capital Budget - DRAFT
2
Municipality of Bayham -2018 -2027 Capital Summary
2018 I 2019 I 2020 I 2021 I 2022 I 2023 I 2024 I 2025 I 2026 I 2027
Expenditures($2
General Government 80,000 70,000 35,000 35,000 60,000 40,000 35,000 75,000 35,000 35,000
Fire 20,000 250,000 0 237,000 0 225,000 431,000 561,500 0 491,000
Building 0 0 0 0 0 0 0 0 0 40,000
By-law 0 0 0 0 0 0 0 0 0 20,000
Roads 1,069,000 3,822,000 1,079,000 1,814,000 4,474,000 1,739,000 1,679,000 7,690,000 829,000 1,150,500
Water 13,500 48,500 13,500 33,500 28,500 15,000 50,000 0 0 20,000
Waste Water 101,667 51,667 101,667 80,000 50,000 50,000 50,000 50,000 50,000 70,000
Parks&Rec. 250,000 80,000 22,000 50,000 60,000 50,000 50,000 50,000 50,000 50,000
Facilities 125,000 250,000 165,000 30,000 25,000 0 0 0 0 0
Planning&Development 17,000 5,000 0 0 0 15,000 25,000 20,000 10,000 10,000
1,676,167 4,577,167 1,416,167 2,279,500 4,697,500 2,134,000 2,320,000 8,446,500 974,000 1,886,500
Financing(SI
Tax levy 559,000 1,599,600 676,000 746,000 2,285,000 1,486,000 1,336,000 3,396,500 854,000 1,612,500
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 749,000 2,807,400 565,000 1,400,000 2,264,000 580,000 450,000 4,900,000 0 0
Third party 0 0 0 0 0 0 0 0 0
Reserves 368,167 140,167 150,167 113,500 128,500 68,000 534,000 150,000 50,000 274,000
Other 0 30,000 25,000 20,000 20,000 0 0 0 70,000 0
Transfer reserve 0 0 0 0 0 0 0 0 0 0
Debt Financing 0 0 0 0 0 0 0 0 0 0
1,676,167 4,577,167 1,416,167 2,279,500 4,697,500 2,134,000 2,320,000 8,446,500 974,000 1,886,500
3
By-law No.2018-XXX
Schedule"A"
Municipality of Bayham - 2018 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($2
General Government 80,000 40,000 0 0 15,000 0 25,000 14
Fire 20,000 0 0 0 0 0 20,000 25
Building 0 0 0 0 0 0 0 36
By-law 0 0 0 0 0 0 0 47
Roads 1,069,000 60,000 0 0 520,000 0 489,000 58
Water 13,500 13,500 0 0 0 0 0 69
Waste Water 101,667 101,667 0 0 0 0 0 80
Parks&Rec. 250,000 44,000 0 0 191,000 0 15,000 91
Facilities 125,000 102,000 0 0 23,000 0 0 102
Planning&Development 17,000 7,000 0 0 0 0 10,000 113
1,676,167 368,167 0 0 749,000 0 559,000
4
Municipality of Bayham - 2019 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($1
General Government 70,000 25,000 0 0 0 0 45,000 15
Fire 250,000 0 0 0 0 0 250,000 26
Building 0 0 0 0 0 0 0 37
By-law 0 0 0 0 0 0 0 48
Roads 3,822,000 0 0 0 2,757,400 30,000 1,034,600 59
Water 48,500 48,500 0 0 0 0 0 70
Waste Water 51,667 51,667 0 0 0 0 0 81
Parks&Rec. 80,000 0 0 0 0 0 80,000 92
Facilities 250,000 15,000 0 0 50,000 0 185,000 103
Planning&Development 5,000 0 0 0 0 0 5,000 114
4,577,167 140,167 0 0 2,807,400 30,000 1,599,600
5
Municipality of Bayham - 2020 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
General Government 35,000 0 0 0 0 0 35,000 16
Fire 0 0 0 0 0 0 0 27
Building 0 0 0 0 0 0 0 38
By-law 0 0 0 0 0 0 0 49
Roads 1,079,000 0 0 0 565,000 25,000 489,000 60
Water 13,500 13,500 0 0 0 0 0 71
Waste Water 101,667 101,667 0 0 0 0 0 82
Parks & Rec. 22,000 0 0 0 0 0 22,000 93
Facilities 165,000 35,000 0 0 0 0 130,000 104
Planning & Developmei 0 0 0 0 0 0 0 115
1,416,167 150,167 0 0 565,000 25,000 676,000
6
Municipality of Bayham -2021 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 35,000 0 0 0 0 0 35,000 17
Fire 237,000 0 0 0 0 0 237,000 28
Building 0 0 0 0 0 0 0 39
By-law 0 0 0 0 0 0 0 50
Roads 1,814,000 0 0 0 1,400,000 20,000 394,000 61
Water 33,500 33,500 0 0 0 0 0 72
Waste Water 80,000 80,000 0 0 0 0 0 83
Parks&Rec. 50,000 0 0 0 0 0 50,000 94
Facilities 30,000 0 0 0 0 0 30,000 105
Planning&Development 0 0 0 0 0 0 0 116
2,279,500 113,500 0 0 1,400,000 20,000 746,000
7
Municipality of Bayham - 2022 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 60,000 25,000 0 0 0 0 35,000 18
Fire 0 0 0 0 0 0 0 29
Building 0 0 0 0 0 0 0 40
By-law 0 0 0 0 0 0 0 51
Roads 4,474,000 0 0 0 2,264,000 20,000 2,190,000 62
Water 28,500 28,500 0 0 0 0 0 73
Waste Water 50,000 50,000 0 0 0 0 0 84
Parks&Rec. 60,000 0 0 0 0 0 60,000 95
Facilities 25,000 25,000 0 0 0 0 0 106
Planning&Development 0 0 0 0 0 0 0 117
4,697,500 128,500 0 0 2,264,000 20,000 2,285,000
8
Municipality of Bayham - 2023 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 40,000 0 0 0 0 0 40,000 19
Fire 225,000 0 0 0 0 0 225,000 30
Building 0 0 0 0 0 0 0 41
By-law 0 0 0 0 0 0 0 52
Roads 1,739,000 0 0 0 580,000 0 1,159,000 63
Water 15,000 15,000 0 0 0 0 0 74
Waste Water 50,000 50,000 0 0 0 0 0 85
Parks&Rec. 50,000 0 0 0 0 0 50,000 96
Facilities 0 0 0 0 0 0 0 107
Planning&Development 15,000 3,000 0 0 0 0 12,000 118
2,134,000 68,000 0 0 580,000 0 1,486,000
9
Municipality of Bayham - 2024 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($1
General Government 35,000 0 0 0 0 0 35,000 20
Fire 431,000 431,000 0 0 0 0 0 31
Building 0 0 0 0 0 0 0 42
By-law 0 0 0 0 0 0 0 53
Roads 1,679,000 0 0 0 450,000 0 1,229,000 64
Water 50,000 50,000 0 0 0 0 0 75
Waste Water 50,000 50,000 0 0 0 0 0 86
Parks&Rec. 50,000 0 0 0 0 0 50,000 97
Facilities 0 0 0 0 0 0 0 108
Planning&Development 25,000 3,000 0 0 0 0 22,000 119
2,320,000 534,000 0 0 450,000 0 1,336,000
10
Municipality of Bayham - 2025 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($1
General Government 75,000 40,000 0 0 0 0 35,000 21
Fire 561,500 60,000 0 0 0 0 501,500 32
Building 0 0 0 0 0 0 0 43
By-law 0 0 0 0 0 0 0 54
Roads 7,690,000 0 0 0 4,900,000 0 2,790,000 65
Water 0 0 0 0 0 0 0 76
Waste Water 50,000 50,000 0 0 0 0 0 87
Parks&Rec. 50,000 0 0 0 0 50,000 98
Facilities 0 0 0 0 0 0 0 109
Planning&Development 20,000 0 0 0 0 0 20,000 120
8,446,500 150,000 0 0 4,900,000 0 3,396,500
11
Municipality of Bayham - 2026 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($1
General Government 35,000 0 0 0 0 0 35,000 22
Fire 0 0 0 0 0 0 0 33
Building 0 0 0 0 0 0 0 44
By-law 0 0 0 0 0 0 0 55
Roads 829,000 0 0 0 0 70,000 759,000 66
Water 0 0 0 0 0 0 77
Waste Water 50,000 50,000 0 0 0 0 0 88
Parks&Rec. 50,000 0 0 0 0 50,000 99
Facilities 0 0 0 0 0 0 0 110
Planning&Development 10,000 0 0 0 0 0 10,000 121
974,000 50,000 0 0 0 70,000 854,000
12
Municipality of Bayham - 2027 Capital Summary
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($1
General Government 35,000 0 0 0 0 0 35,000 23
Fire 491,000 184,000 0 0 0 0 307,000 34
Building 40,000 0 0 0 0 0 40,000 45
By-law 20,000 0 0 0 0 0 20,000 56
Roads 1,150,500 0 0 0 0 0 1,150,500 67
Water 20,000 20,000 0 0 0 0 0 78
Waste Water 70,000 70,000 0 0 0 0 0 89
Parks&Rec. 50,000 0 0 0 0 0 50,000 100
Facilities 0 0 0 0 0 0 0 111
Planning&Development 10,000 0 0 0 0 0 10,000 122
1,886,500 274,000 0 0 0 0 1,612,500
13
Municipality of Bayham
General Government-Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
General Government 80,000 70,000 35,000 35,000 60,000 40,000 35,000 75,000 35,000 35,000
80,000 70,000 35,000 35,000 60,000 40,000 35,000 75,000 35,000 35,000
Financing ($)
Tax levy 25,000 45,000 35,000 35,000 35,000 40,000 35,000 35,000 35,000 35,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 15,000 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 40,000 25,000 0 0 25,000 0 0 40,000 0 0
80,000 70,000 35,000 35,000 60,000 40,000 35,000 75,000 35,000 35,000
14
Municipality of Bayham
General Government-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 80,000 40,000 0 0 15,000 0 25,000
80,000 40,000 0 0 15,000 0 25,000
Details of 2018-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's 'Debt Financing Grants [Other ITax Levy 'Page Reference
Council Computers GG-1 10,000 10,000 0 0 0 0 0 123
Community Based Strategic Plan GG-2 30,000 15,000 0 0 15,000 0 0 124 RED
Detailed Design Standards GG-8 15,000 15,000 0 0 0 0 0 130
Liability Reserve Transfer 5,000 0 0 0 0 0 5,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
80,000 40,000 0 0 15,000 0 25,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 79,764 10,000 40,000 49,764
2327 Election 40,000 10,000 40,000 10,000
2337 Liability 218,620 5,000 0 223,620
15
Municipality of Bayham
General Government-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 70,000 25,000 0 0 0 0 45,000
70,000 25,000 0 0 0 0 45,000
-
Details of 2019-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's (Debt Financing (Grants (Other Tax Levy Page Reference
Postage Machine GG-3 10,000 10,000 0 0 0 0 0 125
Folding Insert Machine GG-4 15,000 15,000 0 0 0 0 0 126
Tender Portal GG-5 10,000 0 0 0 0 0 10,000 127
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
70,000 25,000 0 0 0 0 45,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 49,764 10,000 25,000 34,764
2327 Election 10,000 10,000 0 20,000
2337 Liability 223,620 15,000 0 238,620
16
Municipality of Bayham
General Government-2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 35,000 0 0 0 0 0, 35,000
35,000 0 0 0 0 0 35,000
—
Details of 2020-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's (Debt Financing (Grants (Other Tax Levy (Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
35,000 0 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 34,764 10,000 0 44,764
2327 Election 20,000 10,000 0 30,000
2337 Liability 238,620 15,000 0 253,620
17
Municipality of Bayham
General Government-2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 35,000 0 0 0 0 0 35,000
35,000 0 0 0 0 0 35,000
Details of 2021 -General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
35,000 0 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 44,764 10,000 0 54,764
2327 Election 30,000 10,000 0 40,000
2337 Liability 253,620 15,000 0 268,620
18
Municipality of Bayham
General Government-2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 60,000 25,000 0 0 0 0 35,000
60,000 25,000 0 0 0 0 35,000
Details of 2022-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing Grants 'Other Tax Levy Page Reference
Computer Infrastructure GG-6 25,000 25,000 0 0 0 0 0 128
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
60,000 25,000 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 54,764 10,000 25,000 39,764
2327 Election 40,000 10,000 40,000 10,000
2337 Liability 268,620 15,000 0 283,620
19
Municipality of Bayham
General Government-2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 40,000 0 0 0 0 0 40,000
40,000 0 0 0 0 0 40,000
Details of 2023-General Government-Projects
I
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
40,000 0 0 0 0 0 40,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 39,764 10,000 0 49,764
2327 Election 10,000 15,000 0 25,000
2337 Liability 283,620 15,000 0 298,620
20
Municipality of Bayham
General Government-2024 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 35,000 0 0 0 0 0 35,000
35,000 0 0 0 0 0 35,000
Details of 2024-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing (Grants Other (Tax Levy (Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
35,000 0 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 49,764 10,000 0 59,764
2327 Election 25,000 10,000 0 35,000
2337 Liability 298,620 15,000 0 313,620
21
Municipality of Bayham
General Government-2025 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
General Government 75,000 40,000 0 0 0 0 35,000
75,000 40,000 0 0 0 0 35,000
Details of 2025-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing Grants 'Other Tax Levy Page Reference
I
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Computer Infrastructure Upgrades GG-7 40,000 40,000 0 0 0 0 0 129
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
75,000 40,000 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 59,764 10,000 40,000 29,764
2327 Election 35,000 10,000 0 45,000
2337 Liability 313,620 15,000 0 328,620
22
Municipality of Bayham
General Government-2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($j
General Government 35,000 0 0 0 0 0 35,000
35,000 0 0 0 0 0 35,000
Details of 2026-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants (Other Tax Levy Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
35,000 0 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 29,764 10,000 0 39,764
2327 Election 45,000 10,000 50,000 5,000
2337 Liability 328,620 15,000 0 343,620
23
Municipality of Bayham
General Government-2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($j
General Government 35,000 0 0 0 0 0 35,000
35,000 0 0 0 0 0 35,000
Details of 2027-General Government-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants (Other Tax Levy Page Reference
Liability Reserve Transfer 15,000 0 0 0 0 0 15,000 N/A
Working Capital Transfer 10,000 0 0 0 0 0 10,000 N/A
Election Reserve Transfer 10,000 0 0 0 0 0 10,000 N/A
35,000 0 0 0 0 0 35,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2301 Working Capital 39,764 10,000 0 49,764
2327 Election 5,000 10,000 0 15,000
2337 Liability 343,620 15,000 0 358,620
24
Municipality of Bayham
Fire -Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Fire 20,000 250,000 0 237,000 0 225,000 431,000 561,500 0 491,000
20,000 250,000 0 237,000 0 225,000 431,000 561,500 0 491,000
Financing ($)
Tax levy 20,000 250,000 0 237,000 0 225,000 0 501,500 0 307,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 0 0 0 0 0 0 431,000 60,000 0 184,000
20,000 250,000 0 237,000 0 225,000 431,000 561,500 0 491,000
25
Municipality of Bayham
Fire-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Fire 20,000 0 0 0 0 0 20,000
20,000 0 0 0 0 0 20,000
Details of 2017- Fire-Projects
Info _ Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Rescue Boat FD-1 20,000 0 0 0 0 0 20,000 131
20,000 0 0 0 0 0 20,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 0 0 0
2308 Fire Equipment 0 0 0
26
Municipality of Bayham
Fire-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
Fire 250,000 0 0 0 0 0 250,000
250,000 0 0 0 0 0 250,000
Details of 2019-Fire-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing (Grants (Other ITax Levy (Page Reference
1
Fire Department App. Reserve Transfer 225,000 0 0 0 0 0 225,000 N/A
Fire Equipment Reserve Transfer 25,000 0 0 0 0 0 25,000 N/A
250,000 0 0 0 0 0 250,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 0 225,000 0 225,000
2308 Fire Equipment 0 25,000 0 25,000
27
Municipality of Bayham
Fire-2020 Projects
Financing
Total Cost Reserve Fund DC's Debt FinancinglGrants Other Tax Levy Page Reference
Expenditures ($)
Fire 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2020- Fire- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 225,000 0 0 225,000
2308 Fire Equipment 25,000 0 0 25,000
28
Municipality of Bayham
Fire-2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants 'Other ITax Levy Page Reference
Expenditures ($)
Fire 237,000 0 0 0 0 0 237,000
237,000 0 0 0 0 0 237,000
Details of 2020-Fire-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing Grants 'Other Tax Levy Page Reference
Hydraulic Ram E-Tool FD-2 12,000 0 0 0 0 0 12,000 132
Fire Department App Reserve Transfer 225,000 0 0 0 0 0 225,000 N/A
237,000 0 0 0 0 0 237,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 225,000 225,000 0 450,000
2308 Fire Equipment 25,000 0 0 25,000
29
Municipality of Bayham
Fire-2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Fire 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2022 - Fire- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 450,000 0 0 450,000
2308 Fire Equipment 25,000 0 0 25,000
30
Municipality of Bayham
Fire-2023 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing (Grants (Other Tax Levy (Page Reference
Expenditures($)
Fire 225,000 0 0 0 0 0 225,000
1 225,000 0 0 0 0 0 225,000
Details of 2022- Fire-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing (Grants Other Tax Levy Page Reference
Fire Department App Reserve Transfer 225,000 0 0 0 0 0 225,000 N/A
225,000 0 0 0 0 0 225,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 450,000 225,000 0 675,000
2308 Fire Equipment 25,000 0 0 25,000
31
Municipality of Bayham
Fire-2024 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Fire 431,000 431,000 0 0 0 0 0
431,000 431,000 0 0 0 0 0
Details of 2024-Fire- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other 'Tax Levy Page Reference
Tanker 1 Replacement FD-3 431,000 431,000 0 0 0 0 0 133
431,000 431,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 675,000 0 431,000 244,000
2308 Fire Equipment 25,000 0 0 25,000
32
Municipality of Bayham
Fire-2025 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing Grants 'Other ITax Levy Page Reference
Expenditures($)
Fire 561,500 60,000 0 0 0 0 501,500
561,500 60,000 0 0 0 0 501,500
Details of 2025-Fire-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing Grants 'Other ITax Levy 'Page Reference
Suppression Equipment FD-5 175,000 175,000 135
Pumper 2 Replacement FD-4 381,500 60,000 321,500 134
Tech Rescue-Equipment FD-6 5,000 5,000 136
561,500 60,000 0 0 0 0 501,500
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 244,000 0 60,000 184,000
2308 Fire Equipment 25,000 0 0 25,000
33
Municipality of Bayham
Fire-2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Fire 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2026-Fire- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 184,000 0 0 184,000
2308 Fire Equipment 25,000 0 0 25,000
34
Municipality of Bayham
Fire-2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Fire 491,000 184,000 0 0 0 0 307,000
491,000 184,000 0 0 0 0 307,000
Details of 2027-Fire-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Tanker 2- Replacement FD-7 471,000 184,000 0 0 0 0 287,000 137
Pick Up Truck BL-1 20,000 0 0 0 0 0 20,000 139
491,000 184,000 0 0 0 0 307,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2303 Fire Department App. 184,000 0 184,000 0
2308 Fire Equipment 25,000 0 0 25,000
35
Municipality of Bayham
Building -Years 2018-2027
2018 2019 2020 2021 2022 2023 I 2024 2025 2026 2027
Expenditures ($)
Building 0 0 0 0 0 0 0 0 0 40,000
0 0 0 0 0 0 0 0 0 40,000
Financing ($)
Tax levy 0 0 0 0 0 0 0 0 0 40,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 40,000
36
Municipality of Bayham
Building - 2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing 'Grants Other ITax Levy Page Reference
Expenditures ($) I
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2018 - Building - Projects
I
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing 'Grants Other ITax Levy Page Reference
1
0 0 0 0 01 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
37
Municipality of Bayham
Building -2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy 'Page Reference
Expenditures ($) _
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2019 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
38
Municipality of Bayham
Building - 2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2020 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
39
Municipality of Bayham
Building -2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy 'Page Reference
Expenditures ($) _
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2021 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy 'Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
40
Municipality of Bayham
Building - 2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2022 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
41
Municipality of Bayham
Building - 2023 Projects
-
Financing
Total Cost Reserve Fund DC's Debt Financing (Grants (Other (Tax Levy Page Reference
Expenditures ($)
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2023 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
42
Municipality of Bayham
Building - 2024 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing 'Grants Other 'Tax Levy Page Reference
Expenditures ($) _
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2024- Building - Projects
Info Financing
Sheet# Total CostReserve Fund 'DC's Debt Financing Grants lather 'Tax Levy Page Reference
01 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
43
Municipality of Bayham
Building - 2025 Projects
-
Financing
Total Cost Reserve Fund DC's Debt Financing (Grants !Other Tax Levy Page Reference
Expenditures ($)
-
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2025- Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing !Grants (Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
44
Municipality of Bayham
Building -2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Building 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2026 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing Grants Other Tax Levy Page Reference
0 01 0 0 0I 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
45
Municipality of Bayham
Building - 2027 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing (Grants !Other Tax Levy Page Reference
Expenditures ($)
Building 40,000 0 0 0 0 0 40,000
40,000 0 0 0 0 0 40,000
Details of 2027 - Building - Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing !Grants (Other Tax Levy Page Reference
Pick-Up Truck B-1 40,000 0 0 0 0 0 40,000 138
40,000 0 0 0 0 0 40,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2314 Building 0 0 0 0
46
Municipality of Bayham
By-law-Years 2017-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
By-law 0 0 0 0 0 0 0 0 20,000
0 0 0 0 0 0 0 0 0 20,000
Financing ($)
Tax levy 0 0 0 0 0 0 0 0 0 20,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 0 0 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0 0 20,000
47
Municipality of Bayham
By-law-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2018 - By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
48
Municipality of Bayham
By-law- 2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2019 - By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
49
Municipality of Bayham
By-law-2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing (Grants Other ITax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2020 - By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 01 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
50
Municipality of Bayham
By-law-2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2021 - By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
51
Municipality of Bayham
By-law- 2022 Projects
i
Financing
Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy 'Page Reference
Expenditures ($)
By-law 0 0 0 0 0 01 0
0 0 0 0 0 0 0
Details of 2022 - By-law- Projects
I
Info _ Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
52
Municipality of Bayham
By-law- 2023 Projects
Financing
Total Cost Reserve Fund JDC's Debt Financing (Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 o o
Details of 2023 - By-law- Projects
Info _ Financing
Sheet# Total Cost Reserve Fund (DC's Debt Financing (Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
53
Municipality of Bayham
By-law- 2024 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) i
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2024- By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy 'Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
54
Municipality of Bayham
By-law-2025 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2025- By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
55
Municipality of Bayham
By-law- 2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2026 - By-law- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
56
Municipality of Bayham
By-law-2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
By-law 20,000 0 0 0 0 0 20,000
20,000 0 0 0 0 0 20,000
Details of 2027 - By-law- Projects
Info _ Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Pick Up Truck BL-1 20,000 0 0 0 0 0 20,000 139
20,000 0 0 0 0 0 20,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2319 By-law 0 0 0 0
57
Municipality of Bayham
Roads-Years 2018-2027
I 2018 I 2019 I 2020 I 2021 I 2022 I 2023 I 2024 I 2025 I 2026 2027
Expenditures ($)
Roads 1,069,000 3,822,000 1,079,000 1,814,000 4,474,000 1,739,000 1,679,000 7,690,000 829,000 1,150,500
1,069,000 3,822,000 1,079,000 1,814,000 4,474,000 1,739,000 1,679,000 7,690,000 829,000 1,150,500
Financing ($)
Tax levy 489,000 1,034,600 489,000 394,000 2,190,000 1,159,000 1,229,000 2,790,000 759,000 1,150,500
Development charges 0 0 0 0 0 0 0 0 0
Grants 520,000 2,757,400 565,000 1,400,000 2,264,000 580,000 450,000 4,900,000 0 0
Third party 0 30,000 25,000 20,000 20,000 0 0 0 70,000 0
Reserves 60,000 0 0 0 0 0 0 0 0 0
1,069,000 3,822,000 1,079,000 1,814,000 4,474,000 1,739,000 1,679,000 7,690,000 829,000 1,150,500
58
Municipality of Bayham
Roads-2018 Projects
Financing
Total Cost Reserve Fund 'DC's iDebt Financing 'Grants 'Other ITax Levy 'Page Reference
Expenditures($)
Roads 1,069,000 60,000 0 0 520,000 0 489,000
1,069,000 60,000 0 0 520,000 0 489,000
Details of 2018-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy 'Page Reference
Bridge/Culvert
Tunnel Line Bridge PW-1 75,000 0 0 0 75,000 0 140 OCIF
Equipment
Road Construction
Maple Grove Line PW-3 230,000 0 0 0 230,000 0 142 Gas Tax
Tunnel Line PW-2 125,000 0 0 0 125,000 0 141 OCIF
Best Line PW-4 50,000 0 0 0 30,000 0 20,000 143 OCIF
Springer Hill Rd. PW-5 375,000 0 0 0 0 375,000 144
Stewart Road PW-6 65,000 0 0 0 0 0 65,000 145
Eden Line PW-7 160,000 60,000 0 0 60,000 0 40,000 146 Gas Tax R-RC R
Other
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Sidewalks PW-8 65,000 0 0 0 0 0 65,000 147
B&C Inspection PW-10 10,000 0 0 0 0 0 10,000 149
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Transfer to Equipment Reserve 0 0 0 0 0 0 0 N/A
Transfer to Road Reserve 0 0 0 0 0 0 0 N/A
1,069,000 60,000 0 0 520,000 0 489,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 104,256 0 60,000 44,256
2362 Federal Gas Tax 101,776 221,000 290,000 32,776
59
Municipality of Bayham
Roads-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($) _
Roads 3,822,000 0 0 0 2,757,400 30,000 1,034,600
3,822,000 0 0 0 2,757,400 30,000 1,034,600
Details of 2019-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund I DC's 'Debt Financing 'Grants 'Other 'Tax Levy 'Page Reference
Bridge/Culvert
Carson Line Bridge PW-12 200,000 0 0 0 200,000 0 0 151 OCIF
Equipment
Bulldozer PW-13 100,000 0 0 0 0 10,000 90,000 152
20 Ton Float PW-14 50,000 0 0 0 0 0 50,000 153
PW Pick Up Truck PW-15 25,000 0 0 0 0 0 25,000 154
PW Pick Up Truck PW-16 25,000 0 0 0 0 0 25,000 155
Tandem Combo Unit PW-17 350,000 20,000 330,000 156
Road Construction
Carson Line PW-18 100,000 0 0 0 100,000 0 0 157 OCIF
Tollgate Rd PW-19 275,000 0 0 0 275,000 0 0 158 Gas Tax/O!
Chapel St PW-20 75,000 0 0 0 0 0 75,000 159
McQuiggan Line PW-21 45,000 45,000 160
Woodworth Rd PW-22 15,000 0 0 0 0 0 15,000 161
Other
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Fuel System PW-23 30,000 30,000 162
Lakeshore Line Study PW-24 10,000 0 0 0 0 0 10,000 163
PB Storm Sewer-Phase 1b,c,d PW-25 2,533,000 2,182,400 350,600 164 FCM-OCIF'
Roads Needs Study PW-131 25,000 0 0 0 0 0 25,000 270
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
3,822,000 0 0 0 2,757,400 30,000 1,034,600
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 32,776 220,000 250,000 2,776
60
Municipality of Bayham
Roads-2020 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing (Grants 'Other Tax Levy Page Reference
Expenditures($)
Roads 1,079,000 0 0 0 565,000 25,000 489,000
1,079,000 0 0 0 565,000 25,000 489,000
Details of 2020-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing (Grants Other Tax Levy (Page Reference
Bridge/Culvert
Light Line Guiderail-ET PW-26 25,000 0 0 0 25,000 0 0 165 Gas Tax
Godby Rd. Bridge PW-27 110,000 0 0 0 0 0 110,000 166
Best Line Culvert PW-28 15,000 0 0 0 15,000 0 0 167 Gas Tax
Equipment
Front End Loader PW-29 325,000 0 0 0 0 25,000 300,000 168
Pick Up Truck PW-30 25,000 0 0 0 0 0 25,000 169
2 Ton Pick Up Truck PW-31 80,000 0 0 0 0 0 80,000 170
Road Construction
Teal Nevill Road PW-32 50,000 0 0 0 50,000 0 0 171 Gas Tax
Elliot Road PW-33 35,000 0 0 0 35,000 0 0 172 Gas Tax
Mitchell Rd PW-34 90,000 0 0 0 90,000 0 0 173 Gas Tax
Jackson Line(East) PW-35 350,000 0 0 0 350,000 0 0 174 OCIF
Other
Machine Time -100,000 -100,000 N/A
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
B&C Inspection PW-10 10,000 10,000 149
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
1,079,000 0 0 0 565,000 25,000 489,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 2,776 230,000 215,000 17,776
61
Municipality of Bayham
Roads-2021 Projects
Financing
Total Cost Reserve Fund (DC's 'Debt Financing 'Grants 'Other 'Tax Levy 'Page Reference
Expenditures ($)
Roads 1,814,000 0 0 0 1,400,000 20,000 394,000
1,814,000 0 0 0 1,400,000 20,000 394,000
Details of 2021 -Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund (DC's 'Debt Financing 'Grants 'Other 'Tax Levy 'Page Reference
Bridge/Culvert
Equipment
Backhoe PW-36 170,000 0 0 0 0 20,000 150,000 175
Road Construction
Other
Pitt St Parking Lot PW-37 80,000 0 0 0 0 0 80,000 176
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
PB Storm Sewer-Phase 1 e,f PW-38 1,600,000 1,400,000 200,000 177
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
1,814,000 0 0 0 1,400,000 20,000 394,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 17,776 220,000 0 237,776
62
Municipality of Bayham
Roads-2022 Projects
Financing
Total Cost Reserve Fund (DC's (Debt Financing Grants Other Tax Levy (Page Reference
Expenditures($) _
Roads 4,474,000 0 0 0 2,264,000 20,000 2,190,000
4,474,000 0 0 0 2,264,000 20,000 2,190,000
Details of 2022-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing Grants Other Tax Levy (Page Reference
Bridge/Culvert
Equipment
Tandem PW-39 350,000 0 0 0 20,000 330,000 178
Road Construction
Maple Grove Line PW-40 140,000 0 0 0 140,000 0 0 179 Gas Tax
Springer Hill Dr. PW-41 140,000 0 0 0 140,000 0 0 180 Gas Tax
Eden Line PW-42 40,000 0 0 0 0 0 40,000 181
Coyle Road PW-43 113,000 0 0 0 0 0 113,000 182
George St. PW-44 35,000 0 0 0 0 0 35,000 183
Henry St. PW-45 19,000 0 0 0 0 0 19,000 184
Baldwin Line PW-46 13,000 0 0 0 13,000 0 0 185 OCIF
Ball Line PW-47 4,000 0 0 0 4,000 0 0 186 OCIF
Bayham Drive PW-48 35,000 0 0 0 35,000 0 0 187 OCIF
Bayham Norfolk Boundary PW-49 75,000 0 0 0 75,000 0 0 188 OCIF
Beattie Road PW-50 35,000 0 0 0 35,000 0 0 189 OCIF
Black Bridge Line PW-51 10,000 0 0 0 10,000 0 0 190 OCIF
Chute Line PW-52 35,000 0 0 0 35,000 0 0 191 OCIF
Clarke Road PW-53 65,000 0 0 0 65,000 0 0 192 OCIF
Clearview Drive PW-54 2,000 0 0 0 2,000 0 0 193 OCIF
Coyle Rd PW-55 40,000 0 0 0 40,000 0 0 194 OCIF
Creek Rd. PW-56 10,000 0 0 0 10,000 0 0 195 OCIF
Csinos Rd PW-57 10,000 0 0 0 10,000 0 0 196 OCIF
Dennis Road PW-58 15,000 0 0 0 0 0 15,000 197
Eden Line PW-59 25,000 0 0 0 0 0 25,000 198
Godby Rd. PW-60 75,000 0 0 0 0 0 75,000 199
Gregson Rd. PW-61 35,000 0 0 0 0 0 35,000 200
Harmony Acres Line PW-62 10,000 0 0 0 0 0 10,000 201
Hoover Valley Rd. PW-63 4,000 0 0 0 0 0 4,000 202
Howey Line PW-64 55,000 0 0 0 0 0 55,000 203
Jackson Line PW-65 10,000 0 0 0 0 0 10,000 204
Other 0
PB Storm Sewer-Phase 3 PW-66 3,100,000 0 0 0 1,650,000 0 1,450,000 205 OCIF/TU/GT
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
B&C Inspection PW-10 10,000 0 0 0 0 0 10,000 149
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Reserve Transfer 0 0 0 0 0 0 0 N/A
4,474,000 0 0 0 2,264,000 20,000 2,190,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 237,776 220,000 280,000 177,776
63
Municipality of Bayham
Roads-2023 Projects
Financing
Total Cost Reserve Fund I DC's (Debt Financing(Grants 'Other (Tax Levy Page Reference
Expenditures($2
Roads 1,739,000 0 0 0 580,000 0 1,159,000
1,739,000 0 0 0 580,000 0 1,159,000
Details of 2023-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund I DC's 'Debt Financing'Grants 'Other (Tax Levy 'Page Reference
Bridge/Culvert
Baynor South Bridge PW-67 275,000 0 0 0 230,000 0 45,000 206 Gas Tax
Equipment
Road Construction
Pressey Line PW-68 260,000 0 0 0 0 0 260,000 207
Brown Road PW-69 160,000 0 0 0 0 0 160,000 208
Green Line PW-70 30,000 0 0 0 0 0 30,000 209
Vienna Line PW-71 350,000 0 0 0 350,000 0 0 210 OCIF
Tollgate Rd. PW-72 178,000 0 0 0 0 0 178,000 211
James Line PW-73 40,000 0 0 0 0 0 40,000 212
McQuiggan Line PW-74 25,000 0 0 0 0 0 25,000 213
Mitchell Rd PW-75 40,000 0 0 0 0 0 40,000 214
Orchard Line PW-76 5,000 0 0 0 0 0 5,000 215
Ottergate Line PW-77 2,000 0 0 0 0 0 2,000 216
Owl Cage Rd PW-78 8,000 0 0 0 0 0 8,000 217
Ridge Line PW-79 45,000 0 0 0 0 0 45,000 218
Sandytown Rd. PW-80 100,000 0 0 0 0 0 100,000 219
Somers Rdl PW-81 87,000 0 0 0 0 0 87,000 220
Stewart Road PW-82 60,000 0 0 0 0 0 60,000 221
Toll Gate Rd PW-83 55,000 0 0 0 0 0 55,000 222
Woodworth Road PW-84 55,000 0 0 0 0 0 55,000 223
Other
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
1,739,000 0 0 0 580,000 0 1,159,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 9,188
2305 Road Construction 44,256 0 44,256
2362 Federal Gas Tax 177,776 220,000 230,000 167,776
64
Municipality of Bayham
Roads-2024 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants Other Tax Levy 'Page Reference
Expenditures($).
Roads 1,679,000 0 0 0 450,000 0 1,229,000
1,679,000 0 0 0 450,000 0 1,229,000
Details of 2024-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing 'Grants Other Tax Levy 'Page Reference
Bridge/Culvert
Equipment
Road Construction
Murray Road PW-85 60,000 0 0 0 0 0 60,000 224
Light Line PW-86 330,000 0 0 0 330,000 0 0 225 OCIF
Jackson Line(East) PW-87 120,000 0 0 0 120,000 0 0 226 Gas Tax
Ann Street PW-88 80,000 0 0 0 0 0 80,000 227
Centre Street PW-89 160,000 0 0 0 0 0 160,000 228
Chestnut Street PW-90 50,000 0 0 0 0 0 50,000 229
Edison Drive PW-91 190,000 0 0 0 0 0 190,000 230
Elm Street PW-92 150,000 0 0 0 0 0 150,000 231
Front Street PW-93 15,000 0 0 0 0 0 15,000 232
Fulton Street PW-94 45,000 0 0 0 0 0 45,000 233
King Street PW-95 30,000 0 0 0 0 0 30,000 234
North Street PW-96 65,000 0 0 0 0 0 65,000 235
Oak Street PW-97 15,000 0 0 0 0 0 15,000 236
Old Mill Line PW-98 50,000 0 0 0 0 0 50,000 237
Otter Street PW-99 15,000 0 0 0 0 0 15,000 238
Pearl Street PW-100 30,000 0 0 0 0 0 30,000 239
Pine Street PW-101 25,000 0 0 0 0 0 25,000 240
Queen St. PW-102 15,000 0 0 0 0 0 15,000 241
Snow Street PW-103 30,000 0 0 0 0 0 30,000 242
Soper Road PW-104 75,000 0 0 0 0 0 75,000 243
Union Street PW-105 80,000 0 0 0 0 0 80,000 244
Walnut Street PW-106 35,000 0 0 0 0 0 35,000 245
Water Street PW-107 15,000 0 0 0 0 0 15,000 246
Other
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
B&C Inspection PW-10 10,000 0 0 0 0 0 10,000 149
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Roads Needs Study PW-131 25,000 0 0 0 0 0 25,000 270
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
1,679,000 0 0 0 450,000 0 1,229,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 167,776 220,000 120,000 267,776
65
Municipality of Bayham
Roads-2025 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing 'Grants 'Other ITax Levy 'Page Reference
Expenditures($)
Roads 7,690,000 0 0 0 4,900,000 0 2,790,000
7,690,000 0 0 0 4,900,000 0 2,790,000
Details of 2025-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund (DC's Debt Financing 'Grants 'Other ITax Levy 'Page Reference
Bridge/Culvert
Equipment
Tandem PW-108 350,000 0 0 0 350,000 247
Road Construction
Alward Street PW-109 35,000 0 0 0 0 0 35,000 248
Arthur Street PW-110 18,000 0 0 0 0 0 18,000 249
Donnelly Drive PW-111 18,000 0 0 0 0 0 18,000 250
Duke Street PW-112 18,000 0 0 0 0 0 18,000 251
East Street PW-113 35,000 0 0 0 0 0 35,000 252
Elgin Street PW-114 18,000 0 0 0 0 0 18,000 253
Fifth Street PW-115 35,000 0 0 0 0 0 35,000 254
First Street PW-116 55,000 0 0 0 0 0 55,000 255
Fourth Street PW-117 55,000 0 0 0 0 0 55,000 256
Garner Rd. PW-118 15,000 0 0 0 0 0 15,000 257
Garnham Street PW-119 55,000 0 0 0 0 0 55,000 258
Hesch Street PW-120 18,000 0 0 0 0 0 18,000 259
Main Street PW-121 110,000 0 0 0 0 0 110,000 260
Old Chapel Street PW-122 35,000 0 0 0 0 0 35,000 261
Second St. PW-123 18,000 0 0 0 0 0 18,000 262
Sandytown Road PW-124 45,000 0 0 0 0 0 45,000 263
Short Street PW-125 18,000 0 0 0 0 0 18,000 264
Third Street PW-126 70,000 0 0 0 0 0 70,000 265
Wardwalk PW-127 35,000 0 0 0 0 0 35,000 266
West St. PW-128 70,000 0 0 0 0 0 70,000 267
Other
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
PB Storm Sewer-Phase 2 PW-129 2,800,000 2,100,000 700,000 268
PB Storm Sewer-Phase 4 PW-130 2,100,000 1,500,000 600,000 269
PB Storm Sewer-Phase 5 PW-132 1,700,000 1,300,000 400,000 271
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
0
7,690,000 0 0 0 4,900,000 0 2,790,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 267,776 220,000 0 487,776
66
Municipality of Bayham
Roads-2026 Projects
Financing
Total Cost Reserve Fund DC's 'Debt Financing 'Grants lather Tax Levy Page Reference
Expenditures($)
Roads 829,000 0 0 0 0 70,000 759,000
829,000 0 0 0 0 70,000 759,000
Details of 2026-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund I DC's 'Debt Financing Grants lather Tax Levy Page Reference
Bridge/Culvert
Equipment
Grader PW-133 425,000 0 0 0 0 50,000 375,000 272
Tandem PW-134 350,000 0 0 0 0 20,000 330,000 273
Road Construction
Bay Nor Rd. PW-135 60,000 0 0 0 0 0 60,000 274
Bogus Rd PW-136 20,000 0 0 0 0 0 20,000 275
Other
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
B&C Inspection PW-10 10,000 0 0 0 0 0 10,000 149
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
829,000 0 0 0 0 70,000 759,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 9,188
2305 Road Construction 44,256 0 44,256
2362 Federal Gas Tax 487,776 220,000 0 707,776
67
Municipality of Bayham
Roads-2027 Projects
Financing
Total Cost Reserve Fund I DC's (Debt Financing I Grants'Other ITax Levy IPage Reference
Expenditures($)
Roads 1,150,500 0 0 0 0 0 1,150,500
1,150,500 0 0 0 0 0 1,150,500
Details of 2027-Roads-Projects
Info Financing
Sheet# Total Cost Reserve Fund I DC's (Debt Financing I Grants'Other ITax Levy IPage Reference
BridgelCulvert
Sandytown Road Culvert PW-137 7,500 0 0 0 0 0 7,500 276
Equipment
Pick Up Truck PW-138 40,000 0 0 0 0 0 40,000 277
Road Construction
Vienna Line PW-139 180,000 0 0 0 0 0 180,000 278
Brown Rd. PW-140 80,000 0 0 0 0 0 80,000 279
Faye St. PW-141 18,000 0 0 0 0 0 18,000 280
Homer St. PW-142 18,000 0 0 0 0 0 18,000 281
Hurley Lane PW-143 30,000 0 0 0 0 0 30,000 282
Southey Street PW-144 20,000 0 0 0 0 0 20,000 283
Addison Street PW-145 130,000 0 0 0 0 0 130,000 284
Burwell Street PW-146 20,000 0 0 0 0 0 20,000 285
Tennyson Street PW-147 20,000 0 0 0 0 0 20,000 286
Cowper Street PW-148 20,000 0 0 0 0 0 20,000 287
Travis St. PW-149 10,000 0 0 0 0 0 10,000 288
Gray St. PW-150 30,000 0 0 0 0 0 30,000 289
Baldwin Line PW-151 13,000 0 0 0 0 0 13,000 290
Ball Line I PW-152 4,000 0 0 0 0 0 4,000 291
Bayham Drive PW-153 35,000 0 0 0 0 0 35,000 292
Bayham Norfolk Boundary PW-154 75,000 0 0 0 0 0 75,000 293
Beattie Road PW-155 35,000 0 0 0 0 0 35,000 294
Black Bridge Line PW-156 10,000 0 0 0 0 0 10,000 295
Chute Line PW-157 35,000 0 0 0 0 0 35,000 296
Clarke Road PW-158 65,000 0 0 0 0 0 65,000 297
Clearview Drive PW-159 2,000 0 0 0 0 0 2,000 298
Coyle Rd PW-160 40,000 0 0 0 0 0 40,000 299
Creek Rd. PW-161 10,000 0 0 0 0 0 10,000 300
Csinos Rd PW-162 10,000 0 0 0 0 0 10,000 301
Dennis Road PW-163 15,000 0 0 0 0 0 15,000 302
Eden Line PW-164 25,000 0 0 0 0 0 25,000 303
Godby Rd. PW-165 75,000 0 0 0 0 0 75,000 304
Gregson Rd. PW-166 35,000 0 0 0 0 0 35,000 305
Harmony Acres Line PW-167 10,000 0 0 0 0 0 10,000 306
Hoover Valley Rd. PW-168 4,000 0 0 0 0 0 4,000 307
Howey Line PW-169 55,000 0 0 0 0 0 55,000 308
Jackson Line PW-170 10,000 0 0 0 0 0 10,000 309
0
Other 0
Machine Time -100,000 0 0 0 0 0 -100,000 N/A
Guard Rails PW-9 10,000 0 0 0 0 0 10,000 148
Road Signs PW-11 4,000 0 0 0 0 0 4,000 150
Sidewalks PW-8 50,000 0 0 0 0 0 50,000 147
Road Construction Transfer 0 0 0 0 0 0 0 N/A
Equipment Transfer 0 0 0 0 0 0 0 N/A
1,150,500 0 0 0 0 0 1,150,500
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2302 Equipment 9,188 0 0 9,188
2305 Road Construction 44,256 0 0 44,256
2362 Federal Gas Tax 707,776 220,000 0 927,776
68
Municipality of Bayham
Water-Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Water 13,500 48,500 13,500 33,500 28,500 15,000 50,000 0 0 20,000
13,500 48,500 13,500 33,500 28,500 15,000 50,000 0 0 20,000
Financing ($)
Tax levy 0 0 0 0 0 0 0 0 0 0
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 13,500 48,500 13,500 33,500 28,500 15,0001 50,000 0 0 20,000
13,500 48,500 13,500 33,500 28,500 15,000 50,000 0 0 20,000
69
Municipality of Bayham
Water-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _ -
Water 13,500 13,500 0 0 0 0 0
13,500 13,500 0 0 0 0 0
Details of 2018 -Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants 'Other Tax Levy Page Reference
Air Valves W-1 13,500 13,500 0 0 0 0 0 310
13,500 13,500 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 392,756 100,000 13,500 479,256
70
Municipality of Bayham
Water-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing'Grants Other Tax Levy Page Reference
Expenditures ($)
Water 48,500 48,500 0 0 0 0 0
48,500 48,500 0 0 0 0 0
Details of 2019-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing'Grants Other Tax Levy Page Reference
Air Valves W-1 13,500 13,500 0 0 0 0 0 310
Water Financial Plan W-2 35,000 35,000 0 0 0 0 0 311
48,500 48,500 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 479,256 100,000 48,500 530,756
71
Municipality of Bayham
Water- 2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Water 13,500 13,500 0 0 0 0 0
13,500 13,500 0 0 0 0 0
Details of 2020 -Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Air Valves W-1 13,500 13,500 0 0 0 0 0 310
13,500 13,500 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 530,756 100,000 13,500 617,256
72
Municipality of Bayham
Water-2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Water 33,500 33,500 0 0 0 0 0
33,500 33,500 0 0 0 0 0
Details of 2021 -Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's 'Debt Financing Grants 'Other Tax Levy Page Reference
Pick Up Truck W-5 20,000 20,000 0 0 0 0 0 314
Air Valves W-1 13,500 13,500 0 0 0 0 0 310
33,500 33,500 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 617,256 100,000 33,500 683,756
73
Municipality of Bayham
Water-2022 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
Water 28,500 28,500 0 0 0 0 0
28,500 28,500 0 0 0 0 0
Details of 2022-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing 'Grants 'Other 'Tax Levy Page Reference
Air Valves W-1 13,500 13,500 0 0 0 0 0 310
Equipment-Richmond W-3 15,000 15,000 0 0 0 0 0 312
28,500 28,500 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 683,756 100,000 28,500 755,256
74
Municipality of Bayham
Water-2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing 'Grants 'Other 1Tax Levy Page Reference
Expenditures($)
Water 15,000 15,000 0 0 0 0 0
15,000 15,000 0 0 0 0 0
Details of 2023-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Equipment-Richmond W-3 15,000 15,000 0 0 0 0 0 312
15,000 15,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 755,256 100,000 15,000 840,256
75
Municipality of Bayham
Water-2024 Projects
Financing
Total Cost Reserve Fund DC's (Debt Financing Grants Other ITax Levy Page Reference
Expenditures($) _
Water 50,000 50,000 0 0 0 0 0
50,000 50,000 0 0 0 0 0
Details of 2024-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing Grants Other ITax Levy Page Reference
Water Financial Plan W-4 35,000 35,000 0 0 0 0 313
Equipment-Richmond W-3 15,000 15,000 0 0 0 0 0 312
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 840,256 100,000 50,000 890,256
76
Municipality of Bayham
Water-2025 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Expenditures($)
Water 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2025-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing (Grants 'Other 'Tax Levy'Page Reference
0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 890,256 100,000 0 990,256
77
Municipality of Bayham
Water-2026 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Expenditures($)
Water 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2026-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing (Grants 'Other 'Tax Levy'Page Reference
0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 990,256 100,000 0 1,090,256
78
Municipality of Bayham
Water-2027 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Expenditures($)
Water 20,000 20,000 0 0 0 0 0
20,000 20,000 0 0 0 0 0
Details of 2027-Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Pick Up Truck W-6 20,000 20,000 315
20,000 20,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2310 Water Works 1,090,256 100,000 20,000 1,170,256
79
Municipality of Bayham
Waste Water-Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Waste Water 101,667 51,667 101,667 80,000 50,000 50,000 50,000 50,000 50,000 70,000
101,667 51,667 101,667 80,000 50,000 50,000 50,000 50,000 50,000 70,000
Financing ($)
Tax levy 0 0 0 0 0 0 0 0 0 0
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 101,667 51,667 101,667 80,000 50,000 50,000 50,000 50,000 50,000 70,000
101,667 51,667 101,667 80,000 50,000 50,000 50,000 50,000 50,000 70,000
80
Municipality of Bayham
Waste Water-2018 Projects
I
Financing
Total Cost Reserve Fund IDC's Debt Financing (Grants Other Tax Levy Page Reference
Expenditures($)
Waste Water 101,667 101,667 0 0 0 0 0
101,667 101,667 0 0 0 0 0
Details of 2018-Waste Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Manhole Rehabilitation WW-2 50,000 50,000 0 0 0 0 0 317
Pump Station Check Valves WW-3 10,000 10,000 0 0 0 0 0 318
Pump Equipment WW-1 41,667 41,667 0 0 0 0 0 316
101,667 101,667 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 2,355,927 250,000 101,667 2,504,260
81
Municipality of Bayham
Waste Water-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing (Grants (Other (Tax Levy Page Reference
Expenditures($)
Waste Water 51,667 51,667 0 0 0 0 0
51,667 51,667 0 0 0 0 0
Details of 2019-Waste Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Pump Station Check Valves WW-3 10,000 10,000 0 0 0 0 0 318
Pump Equipment WW-1 41,667 41,667 0 0 0 0 0 316
51,667 51,667 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 2,504,260 250,000 51,667 2,702,593
82
Municipality of Bayham
Waste Water-2020 Projects
Financing
Total Cost Reserve Fund DC's 'Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
Waste Water 101,667 101,667 0 0 0 0 0
101,667 101,667 0 0 0 0 0
Details of 2020-Waste Water-Projects
Info Financing 1
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing 'Grants Other Tax Levy Page Reference
Pump Station Check Valves WW-3 10,000 10,000 0 0 0 0 0 318
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
Pump Equipment WW-1 41,667 41,667 0 0 0 0 0 316
101,667 101,667 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 2,702,593 250,000 101,667 2,850,926
83
Municipality of Bayham
Waste Water-2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
1
Expenditures($)
Waste Water 80,000 80,000
80,000 80,000 0 0 0 0 0
Details of 2021 -Waste Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing (Grants Other Tax Levy Page Reference
Pick Up Truck W-5 _ 20,000 20,000 0 0 0 0 0 314
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
Pump Station Check Valves WW-3 10,000 10,000 0 L 0 0 0 0 318
80,000 80,000 01 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 2,850,926 250,000 80,000 3,020,926
84
Municipality of Bayham
Waste Water-2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other ITax Levy Page Reference
Expenditures($)
Waste Water 50,000 50,000 0 0 0 0 0
50,000 50,000 0 0 0 0 0
Details of 2022-Waste Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing (Grants (Other ITax Levy Page Reference
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 3,020,926 250,000 50,000 3,220,926
85
Municipality of Bayham
Waste Water-2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Waste Water 50,000 50,000 0 0 0 0 0
50,000 50,000 0 0 0 0 0
Details of 2023-Waste Water-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing (Grants Other Tax Levy]Page Reference
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 3,220,926 250,000 50,000 3,420,926
86
Municipality of Bayham
Waste Water-2024 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Waste Water 50,000 50,000 0 0 0 0 0
50,000 50,000 0 EMI. 0 0
Details of 2024-Waste Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 3,420,926 250,000 50,000 3,620,926
87
Municipality of Bayham
Waste Water-2025 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Waste Water 50,000 50,000 0 0 0 0 0
50,000 50,000 0 0 0 0 0
Details of 2025-Waste Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 3,620,926 250,000 50,000 3,820,926
88
Municipality of Bayham
Waste Water-2026 Projects
Financing
Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Waste Water 50,000 50,000
50,000 50,000 0 0 0 0 0
Details of 2026-Waste Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
50,000 50,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 3,820,926 250,000 50,000 4,020,926
89
Municipality of Bayham
Waste Water-2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Waste Water 70,000 70,000
70,000 70,000 0 0 0 0 0
Details of 2027-Waste Water- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Pick Up Truck W-6 20,000 20,000 0 0 0 0 0 315
New Pumps WW-4 50,000 50,000 0 0 0 0 0 319
70,000 70,000, 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2312 Sewage Works 4,020,926 250,000 70,000 4,200,926
90
Municipality of Bayham
Parks and Rec. -Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Parks and Rec. 250,000 80,000 22,000 50,000 60,000 50,000 50,000 50,000 50,000 50,000
250,000 80,000 22,000 50,000 60,000 50,000 50,000 50,000 50,000 50,000
Financing ($) _
Tax levy 15,000 80,000 22,000 50,000 60,000 50,000 50,000 50,000 50,000 50,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 191,000 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 44,000 0 0 0 0 0 0 0 0 0
250,000 80,000 22,000 50,000 60,000 50,000 50,000 50,000 50,000 50,000
91
Municipality of Bayham
Parks and Rec.-2018 Projects
Financing 1
Total Cost Reserve Fund _ DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 250,000 44,000 0 0 191,000 0 15,000
250,000 44,000 0 0 191,000 0 15,000
Details of 2018-Parks&Rec.-Projects
Info Financing
Sheet# Total Cost Reserve Fund ]DC's (Debt Financing Grants (Other (Tax LevylPage Reference
East Pier Rehabilitation PR-1 150,000 0 0 0 150,000 0 0 320 OTF
Richmond Fence-CSA PR-2 35,000 20,000 0 0 0 0 15,000 321
Accessible Viewing Platform PR-3 65,000 24,000 0 0 41,000 0 0 322 EAF
250,000 44,000 0 0 191,000 0 15,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 97,023 10,000 0 107,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 31,034 0 20,000 11,034
2318 Parks& Playground 71,722 0 24,000 47,722
92
Municipality of Bayham
Parks and Rec.-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 80,000 0 0 0 0 0 80,000
80,000 0 0 0 0 0 80,000
Details of 2019-Parks &Rec.- Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's (Debt Financing Grants Other Tax Levy Page Reference
PB Shed - Pavilion Conversion PR-4 45,000 0 0 0' 0 0 45,000 323
Cenotaph PR-10 25,000 0 0 0 0 25,000 329
Flag Poles PR-5 10,000 0 0 0 0 0 10,000 324
80,000 0 0 0 0 0 80,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 107,023 10,000 0 117,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks&Playground 47,722 0 0 47,722
93
Municipality of Bayham
Parks and Rec. -2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Parks and Rec. 22,000 0 0 0 0 0 22,000
22,000 0 0 0 0 0 22,000
Details of 2020- Parks &Rec. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Straffordville Pavilion PR-6 10,000 0 0 0 0 0 10,000 325
Straffordville Storage Sheds PR-7 12,000 0 0 0 0 0 12,000 326
22,000 0 0 0 0 0 22,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 117,023 10,000 0 127,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks& Playground 47,722 0 0 47,722
94
Municipality of Bayham
Parks and Rec. -2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2021 - Parks & Rec. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants 'Other Tax Levy Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 127,023 10,000 0 137,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
95
Municipality of Bayham
Parks and Rec. -2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing (Grants Other Tax Levy Page Reference
Expenditures ($) _
Parks and Rec. 60,000 0 0 0 0 0 60,000
60,000 0 0 0 0 0 60,000
Details of 2022-Parks & Rec. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Electric Charging Station PR-9 10,000 0 0 0 0 0 10,000 328
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
60,000 0 0 0 0 0 60,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 137,023 10,000 0 147,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
96
Municipality of Bayham
Parks and Rec. -2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2023- Parks & Rec.-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 147,023 10,000 0 157,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
97
Municipality of Bayham
Parks and Rec. - 2024 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2024-Parks & Rec. -Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 157,023 10,000 0 167,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
98
Municipality of Bayham
Parks and Rec. -2025 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2025- Parks & Rec. -Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 167,023 10,000 0 177,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
99
Municipality of Bayham
Parks and Rec.-2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2026- Parks & Rec. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 177,023 10,000 0 187,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
100
Municipality of Bayham
Parks and Rec. -2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Parks and Rec. 50,000 0 0 0 0 0 50,000
50,000 0 0 0 0 0 50,000
Details of 2027- Parks & Rec.- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy'Page Reference
Playground Equipment PR-8 50,000 0 0 0 0 0 50,000 327
50,000 0 0 0 0 0 50,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2307 Trail 187,023 10,000 0 197,023
2328 Waste Management 83,177 0 0 83,177
2350 Parkland 11,034 0 0 11,034
2318 Parks & Playground 47,722 0 0 47,722
101
Municipality of Bayham
Facilities -Years 2018-2027
H
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Facilities 125,000 250,000 165,000 30,000 25,000
125,000 250,000 165,000 30,000 25,000 0 0 0 0 0
Financing ($)
Tax levy 0 185,000 130,000 30,000 0
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 23,000 50,000 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 102,000 15,000 35,000 0 25,000 0 0 0 0 0
125,000 250,000 165,000 30,000 25,000 0 0 0 0 0
102
Municipality of Bayham
Facilities.-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants 'Other Tax Levy'Page Reference
Expenditures($)
Facilities 125,000 102,000 0 0 23,000 0 0
125,000 102,000 0 0 23,000 0 0
Details of 2018-Facilities.-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants 'Other Tax Levy IPage Reference
SCC Chairs&Stage FA-1 23,000 0 0 0 23,000 0 0 330 NHSF
SCC Generator FA-2 75,000 75,000 0 0 0 0 0 331
PB Library Ramp FA-3 15,000 15,000 0 0 0 0 0 332
FD Stn 2-HVAC FA-4 12,000 12,000 0 0 0 0 0 333
125,000 102,000 0 0 23,000 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 68,000 40,000 102,000 6,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2129 2,129
103
Municipality of Bayham
Facilities.-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures($)
Facilities 250,000 15,000 0 0 50,000 0 185,000
250,000 15,000 0 0 50,000 0 185,000
Details of 2019-Facilities.-Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
SCC Water Treatment System FA-5 20,000 0 0 0 0 0 20,000 334
Straffordville Library Elevator FA-6 200,000 0 0 50,000 0 150,000 335 EAF
PB Library-HRV FA-7 15,000 15,000 0 0 0 0 0 336
Museum HRV Furnace FA-8 15,000 0 0 0 0 0 15,000 337
250,000 15,000 0 0 50,000 0 185,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 6,000 40,000 15,000 31,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 0 0 2,129
104
Municipality of Bayham
Facilities.-2020 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 165,000 35,000 0 0 0 0 130,000
165,000 35,000 0 0 0 0 130,000
Details of 2020 - Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's 'Debt Financing Grants Other Tax Levy Page Reference
Salt Storage Shed FA-9 100,000 0 0 0 0 0 100,000 338
SCC Old Chapel Parking FA-10 30,000 0 0 0 0 0 30,000 339
Straffordville Food Booth FA-11 35,000 35,000 0 0 0 0 0 340
165,000 35,000 0 0 0 0 130,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 31,000 40,000 35,000 36,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
105
Municipality of Bayham
Facilities. -2021 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 30,000 0 0 0 0 0 30,000
30,000 0 0 0 0 0 30,000
Details of 2021 - Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy'Page Reference
Facility Audits FA-12 30,000 0 0 0 0 0 30,000 341
30,000 0 0 0 0 0 30,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 36,000 40,000 0 76,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 0 0 2,129
106
Municipality of Bayham
Facilities. -2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Facilities 25,000 25,000 0 0 0 0 0
25,000 25,000 0 0 0 0 0
Details of 2022- Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing 'Grants 'Other ITax Levy Page Reference
PB Library-Washroom FA-13 15,000 15,000 0 0 0 0 0 342
MM -Accessible Washroom FA-14 10,000 10,000 0 0 0 0 0 343
25,000 25,000 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 76,000 40,000 25,000 91,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 0 0 2,129
107
Municipality of Bayham
Facilities. -2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2023- Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's 'Debt Financing Grants lather Tax Levy Page Reference
o o 0 0 0 0 0
o o 0 0 0 0 0
o o 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 91,000 40,000 0 131,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
108
Municipality of Bayham
Facilities.-2024 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 0 0 0 0 0 0 0
o o 0 0 0 0 0
Details of 2024- Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
o o 0 0 0 0 0
o o 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 131,000 40,000 0 171,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
109
Municipality of Bayham
Facilities. -2025 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2025- Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund I DC's Debt Financing IGrants Other Tax Levy Page Reference
0 0 0 0 0 0 0
o o 0 0 0 0 0
o o 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 171,000 40,000 0 211,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
110
Municipality of Bayham
Facilities. -2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2026- Facilities. - Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 211,000 40,000 0 251,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
111
Municipality of Bayham
Facilities.-2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Facilities 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2027- Facilities. -Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other 'Tax Levy Page Reference
0 0 0 0 0 0 0
0 0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2336 Facilities 251,000 40,000 0 291,000
2361 VCC 82,327 0 0 82,327
2360 SCC 2,129 2,129
112
Municipality of Bayham
Planning & Development-Years 2018-2027
2018 2019 2020 2021 2022 2023 2024 2025 2026 2027
Expenditures ($)
Planning & Development 17,000 5,000 0 0 0 15,000 25,000 20,000 10,000 10,000
17,000 5,000 0 0 0 15,000 25,000 20,000 10,000 10,000
Financing ($)
Tax levy 10,000 5,000 0 0 0 12,000 22,000 20,000 10,000 10,000
Development charges 0 0 0 0 0 0 0 0 0 0
Grants 0 0 0 0 0 0 0 0 0 0
Third party 0 0 0 0 0 0 0 0 0 0
Reserves 7,000 0 0 0 0 3,000 3,000 0 0 0
17,000 5,000 0 0 0 15,000 25,000 20,000 10,000 10,000
113
Municipality of Bayham
Planning and Development-2018 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Planning and Development 17,000 7,000 0 0 0 0 10,000
17,000 7,000 0 0 0 0 10,000
Details of 2018- Planning and Development- Projects
Info Financing
Sheet# Total Cosi Reserve Fund DC's Debt Financing 'Grants Other Tax Levy Page Reference
Official Plan Review PD-1 7,000 7,000 0 0 0 0 0 344
Zoning By-Law PD-2 10,000 0 0 0 0 0 10,000 345
17,000 7,000 0 0 CI 0 10,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from
2363 Planning 11,625 0 7,000 4,625
114
Municipality of Bayham
Planning and Development-2019 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Planning and Development 5,000 0 0 0 0 0 5,000
5,000 0 0 0 0 0 5,000
Details of 2019 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Zoning By-Law PD-2 5,000 0 0 0 0 0 5,000 345
5,000 0 0 0 0 0 5,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 4,625 0 4,625
115
Municipality of Bayham
Planning and Development- 2020 Projects
Financing
Total Cost Reserve Fund DC's (Debt Financing Grants Other ITax Levy Page Reference
Expenditures ($) _
Planning and Development 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2020 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's (Debt Financing (Grants (Other ITax Levy Page Reference
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 4,625 0 0 4,625
116
Municipality of Bayham
Planning and Development- 2021 Projects
Financing
Total Cost Reserve Fund (DC's 'Debt Financing (Grants lather (Tax Levy[Page Reference
Expenditures ($)
Planning and Development 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2021 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's Debt Financing 'Grants 'Other 'Tax LevylPage Reference
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 4,625 0 4,625
117
Municipality of Bayham
Planning and Development-2022 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy'Page Reference
Expenditures ($)
Planning and Development 0 0 0 0 0 0 0
0 0 0 0 0 0 0
Details of 2022 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
0 0 0 0 0 0 0
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 4,625 0 4,625
118
Municipality of Bayham
Planning and Development-2023 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($)
Planning and Development 15,000 3,000 0 0 0 0 12,000
15,000 3,0001 0 0 0 0 12,000
Details of 2023 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Official Plan Review PD-3 15,000 3,000 0 0 0 0 12,000 346
15,000 3,000 0 0 0 0 12,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 4,625 3,000 1,625
119
Municipality of Bayham
Planning and Development- 2024 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants lather 'Tax Levy[Page Reference
Expenditures ($)
Planning and Development 25,000 3,000 0 0 0 0 22,000
25,000 3,000 0 0 0 0 22,000
Details of 2024- Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's 'Debt Financing 'Grants 'Other 'Tax Levy'Page Reference
Zoning By-Law PD-4 10,000 01 0 0 0 0 10,000 347
Official Plan Review PD-3 15,000 3,000 0 0 0 0 12,000 346
25,000 3,000 0 0 0 0 22,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning 1,625 3,000 -1,375
120
Municipality of Bayham
Planning and Development- 2025 Projects
Financing
Total Cost Reserve Fund IDC's 'Debt Financing 'Grants lather 'Tax Levy Page Reference
Expenditures ($)
Planning and Development 20,000 0 0 0 0 0 20,000
20,000 0 0 0 0 0 20,000
Details of 2025- Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund IDC's 'Debt Financing 'Grants 'Other 'Tax Levy Page Reference
Zoning By-Law PD-4 10,000 0 0 0 0 0 10,000 347'
OP Review PD-3 10,000 0 0 0 0 0 10,000 346
20,000 0 0 0 0 0 20,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning -1,375 0 0 -1,375
121
Municipality of Bayham
Planning and Development-2026 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy'Page Reference
Expenditures ($) _
Planning and Development 10,000 0 0 0 0 0 10,000
10,000 0 0 0 0 0 10,000
Details of 2026 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
OP Review PD-3 10,000 0 0 0 0 0 10,000 346
10,000 0 0 0 0 0 10,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning -1,375 10,000 0 8,625
122
Municipality of Bayham
Planning and Development- 2027 Projects
Financing
Total Cost Reserve Fund DC's Debt Financing Grants Other Tax Levy Page Reference
Expenditures ($) _
Planning and Development 10,000 0 0 0 0 0 10,000
10,000 0 0 0 0 0 10,000
Details of 2027 - Planning and Development- Projects
Info Financing
Sheet# Total Cost Reserve Fund [DC's Debt Financing Grants Other Tax Levy'Page Reference
OP Review PD-3 10,000 0 0 0 0 0 10,000 346
10,000 0 0 0 0 0 10,000
Budgeted Reserve Balance
Opening Closing
Acc No. Name Balance Transfer to Transfer from Balance
2363 Planning -1,375 10,000 0 8,625
123
Municipality of Bayham GG-1
Capital Budget - Information Sheet
Year: 2018 Asset ID #
Department: General Government
Service/Program: Council
Capital Project Description: Council Computers
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Replace Laptops for new term of Council
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 10,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
124
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # GG-2
Department: General Government
Service/Program: General Government
Capital Project Description: Community Based Strategic Plan
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Community Based Strategic Plan - Background and Community Consults with 2014-2018 Council. Final
interview with 2018-2022 Council
Capital Budget - Total Project Cost 30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant 15,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years)
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
125
Municipality of Bayham GG-3
Capital Budget - Information Sheet
Year: 2019 Asset ID #
Department: General Government
Service/Program: Treasury Department
Capital Project Description: Postage Machine
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
The postage Machine is at the end of its useful life and needs replaced
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 10,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
126
Municipality of Bayham GG-4
Capital Budget - Information Sheet
Year: 2019 Asset ID #
Department: General Government
Service/Program: Treasury Department
Capital Project Description: Folding Insert Machine
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
This asset is at the end of its useful life and needs replaced
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
127
Municipality of Bayham GG-5
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: General Government
Service/Program: General Government
Capital Project Description: Tender Portal
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Design of custom Tender Portal to obtain compliance with procurement by-law for Municipal Website.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing
Source: Year 1 Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 8
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
128
Municipality of Bayham GG-6
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID #
Department: General Government
Service/Program: General Government
Capital Project Description: Computer Infrastructure
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Computer infrastructure technology renewal and upgrade
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 25,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 8
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
129
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # GG-7
Department: General Government
Service/Program: General Government
Capital Project Description: Computer Infrastructure Upgrades
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Replacement of Computer Operating Infrastructure
Capital Budget - Total Project Cost 40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 40,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 8
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
130
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # GG-8
Department: General Government
Service/Program: General Government
Capital Project Description: Detailed Design Standards
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Corporate Detailed Design Standards as per direction of Council.
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
131
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2018 Asset ID # FD-1
Department: Fire Services
Service/Program: Technical Rescue
Capital Project Description: Rescue Craft
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Current rescue craft(Zodiac and Fortuna)are becoming increasingly costly and difficult to maintain. While
not excessively utilized, the ability to respond to an ice or water rescue are high impact, high visibility
incidents. The craft must be reliable and safe for both victims and operators. This expenditure was originally
in 2019 but is being moved forward due to the condition of the craft.
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
132
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2021 Asset ID # FD-2
Department: Fire Services
Service/Program: Technical Rescue
Capital Project Description: Hydraulic Ram E-Tool
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement X Other
Comments:
There is currently no hydraulic ram capability in the Port Burwell station. They have a cutter and combi-
tool only. The proposal is to add this capability as part of a standard vehicle extrication tool set.
Capital Budget - Total Project Cost $12,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 12,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 12,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 12,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
133
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2024 Asset ID # FD-3
Department: Fire Services
Service/Program: L_ Suppression Apparatus
Capital Project Description: Apparatus Replacement, Tanker 1
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Projected life span of a tanker is being changed to 25 years. This is over the NFPA recommendation of 20 years
for tankers. The cost of maintaining the apparatus will be monitored to ensure it wouldn't be prudent to replace
the unit earlier. Operating safety will part of the review.
Capital Budget - Total Project Cost $431,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 431,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 431,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 431,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs _
Net Impact
134
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2025 Asset ID # FD-4
Department: Fire Services
Service/Program: Suppression Apparatus
Capital Project Description: Apparatus Replacement, Pump 2
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Projected life span of a pumper is being changed to 20 years. This is over the NFPA recommendation of 10 years
for pumpers The cost of maintaining the apparatus will be monitored to ensure it wouldn't be prudent to replace
the unit earlier. Operating safety will part of the review.
Capital Budget - Total Project Cost $381,500
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 381,500 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 321,500
Reserves/ Reserve Funds 60,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 381,500
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
135
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2025 Asset ID # FD-5
Department: Fire Services
Service/Program: Suppression Equipment
Capital Project Description: Self Contained Breathing Apparatus (SCBA)
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Expected end-of-life for the current SCBA sets purchased in 2010. The purchase would include 22
backpacks, 66 air cylinders, 50 masks., and 2 RIT packs.
Capital Budget - Total Project Cost $175,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 175,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 175,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 175,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact none none none none none
136
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # FD-6
Department: Fire Services
Service/Program: Technical Rescue
Capital Project Description: End Of Life Replacement
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Standard replacement of ten year life safety equipment such as carabiners, pulleys, helmets, ice/water
suits, etc.
Capital Budget - Total Project Cost $5,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 5,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 5,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 5,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
137
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2027 Asset ID # FD-7
Department: Fire Services
Service/Program: Suppression Apparatus
Capital Project Description: Apparatus Replacement, Tanker 2
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Projected life span of a tanker is being changed to 25 years. This is over the NFPA recommendation of 20 years
for tankers. The cost of maintaining the apparatus will be monitored to ensure it wouldn't be prudent to replace
the unit earlier. Operating safety will part of the review.
Capital Budget - Total Project Cost $471,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 471,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 287,000
Reserves/ Reserve Funds 184,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 471,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
138
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # B-1
Department: Building
Service/Program:
Capital Project Description: Vehicle Replacement
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
The Municipal truck will be 10 years old in 2027 and is need of replacement
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 40,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
139
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # BL-1
Department: Bylaw Enforcement/Fire
Service/Program: Truck
Capital Project Description: Truck Replacement
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Vehicle Replacement
Capital Budget - Total Project Cost $40,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 40,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs $0 $0 $0 $0 $0
Savings (decrease) in Operating Costs $0 $0 $0 $0 $0
Net Impact - - - - -
140
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-1
Department: Public Works
Service/Program: Roads
Capital Project Description: Bridge Repairs-Tunnel Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Tunnel Line bridge requires repairs to the concrete abatements, install joints, waterproof& pave deck.
Engineer and tender
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 75,000 OCIF
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
141
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-2
Department: Public Works
Service/Program: Roads
Capital Project Description: Tunnel Line Micro Resurface
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Single Coat of TC
Capital Budget - Total Project Cost $125,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $125,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 125,000 OCIF
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 125,000`
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
142
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-3
Department: Public Works
Service/Program: Roads
Capital Project Description: Maple Grove Line Reconstruction
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Yr 3- Double coat of Tar and Chip
Capital Budget - Total Project Cost $230,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $230,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds
Subdividers Agreements
Government Grant 230,000 Gas Tax
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 230,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
143
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-4
Department: Public Works
Service/Program: Roads
Capital Project Description: Best line-Culloden Rd to Springerhill Rd
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Single TC
Capital Budget - Total Project Cost $50,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 30,000 OCIF
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-5 144
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # 25052
Department: Public Works
Service/Program: Roads
Capital Project Description: Springer Hill Road
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
older T&C surface, approx. 20%patched
Upgrade
Plan resurface with double T&C, repair culverts and ditching
Special meas. 7.0m, Springer Hill Rd. Culv. (52004), 36.7m I., 3.4m w.;1960
Features
Capital Budget - Total Project Cost $375,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $375,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 375,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
145
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-6
Department: Public Works
Service/Program: Roads
Capital Project Description: Stewart Rd - regular granular upgrades
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments 1_
Regular granular upgrade cycle to maintain adequate road surface. Improve drainage
Capital Budget - Total Project Cost $65,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $65,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 65,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 65,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-7 146
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # 25006
Department: Public Works
Service/Program: Roads
Capital Project Description: Eden Line
Springerhill to Culloden
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some patched road areas and narrow shoulders
Upgrade
Plan resurface with double TC,add granular base
Special Eden Line Culv. (52003), CPS Pipe 8.5m pl.w., 24m I., 3.3m w.; 1960
Features
Capital Budget - Total Project Cost $160,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $160,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 60,000
Reserves/ Reserve Funds 60,000
Subdividers Agreements
Government Grant 40,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 160,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
147
Municipality of Bayham PW-8
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID #
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Side Walk Upgrades/Removal
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
The sidealks in the entirety of the Municipality are in fair to poor condition and need to be removed or replaced with new
accessible sidewalks. A service Delivery Review on sidewalks is required.
Capital Budget- Total Project Cost $ 300,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000.00 Year 4 $ 50,000.00
Year 2 $50,000.00 Year 5 $ 50,000.00
Year 3 $50,000.00 Year 6 $ 50,000.00
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Tax Levy 50,000 50,000 50,000 50,000 50,000 50,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
Total Financing 50,000 50,000 50,000 50,000 50,000 50,000
Specify the Expected Useful Life of the Asset(in years) 25
Impact on Operating Budget:
Year 1 Year2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
148
Municipality of Bayham PW-9
Capital Budget-Information Sheet
Year: (indicate read 2018 Asset ID#
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Guard Rails
Capital Project Priority/Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement x Other
Comments:
There are sections of guard rails that need to be installed according to the Roads Needs Study.
Capital Budget-Total Project Cost $ 30,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 10,000.00 Year 4
Year 2 $ 10,000.00 Year 5
Year 3 $ 10,000.00 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 10,000.00 $ 10,000.00 $ 10,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 10,000.00 $ 10,000.00 $ 10,000.00
Specify the Expected Useful Life of the Asset(in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
149
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PW-10
Department: Public Works
Service/Program: Roads
Capital Project Description: Bridge & Culvert Inspections
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue _ Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement X Other
Comments:
Bridge & culvert infrastructure require inspections by a qualified engineer every 2 years. 2016 was the
last inspection.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years)
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
150
Municipality of Bayham
Capital Budget-Information Sheet
Year: (indicate year) 2018 Asset ID# PW-11
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: NEW ROAD SIGNS
Capital Project Priority/Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
road sign upgrade as per roads need study
Capital Budget-Total Project Cost $ 4,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 4,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 4,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 4,000.00
Specify the Expected Useful Life of the Asset(in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
151
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PW-12
Department: Public Works
Service/Program: Roads
Capital Project Description: Carson Line Bridge Repairs
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Repair bridge approach, install joints and end treatments
Capital Budget - Total Project Cost $200,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $200,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds
Subdividers Agreements
Government Grant 200,000 OCIF
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 200,000
Specify the Expected Useful Life of the Asset (in years) 20+
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
152
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PW-13
Department: Public Works
Service/Program: Roads
Capital Project Description: Crawler Dozer
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Replacement of 1993 Crawler Dozer
Capital Budget - Total Project Cost $100,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $100,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 90,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale 10,000
Other: specify
Total Financing 100,000`
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
153
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PW-14
Department: Public Works
Service/Program: Roads
Capital Project Description: 20 Ton Float
Capital Project Priority / Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
20 Ton Float to be able to Float Equipment and operate more efficiently
Capital Budget - Total Project Cost $50,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 50,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs _
Net Impact - - -
154
Municipality of Bayham PW-15
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Pick Up Truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Truck 01, a 2008 Pick Up Truck, needs to be replaced as it is cost prohibitive to maintain. This unit is vital to the Public
Works fleet to maintain municipal and county roads, Parks and Recreation.
Capital Budget- Total Project Cost $ 25,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 25,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 25,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
155
Municipality of Bayham PW-16
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Pick Up Truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Truck 14, a 2007 Pick Up Truck, needs to be replaced as it is cost prohibitive to maintain. This unit is vital to the Public
Works fleet to maintain municipal and county roads, Parks and Recreation.
Capital Budget- Total Project Cost $ 25,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 25,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 25,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
156
Municipality of Bayham PW-17
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Tandem Combo Unit
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Truck 09, a 2007 Tandem and the 2004 Brine Truck needs to be replaced as it is cost prohibitive to maintain. By
purchasing a Tandem Combo Unit there weill be a reduction in fleet size.
Capital Budget- Total Project Cost $ 350,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 330,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale $ 20,000.00
Other:specify
Total Financing $ 350,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
157
Municipality of Bayham PW-18
Capital Budget-Information Sheet
Year: (indicate read 2019 Asset ID#
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Carson Line
Capital Project Priority/Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement x Other
Comments:
Carson Line(Plank to Talbot)-patched surface,bridge approches are rough. Reconstruct bridge approches and resurface
with a single layer of T&C.
Capital Budget-Total Project Cost $ 100,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 100,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 100,000.00 OCIF
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 100,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
Municipality of Bayham PW-19 158
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # 25070
Department: Public Works
Service/Program: Roads
Capital Project Description: Toll Gate Road
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface with single T&C
Special
Features
Capital Budget - Total Project Cost $275,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $275,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 275,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 275,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-20 159
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # 25130
Department: Public Works
Service/Program: Roads
Capital Project Description: Chapel Street
Plank to Chute
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
a few cracks and patches on sloped area
Upgrade
Plan resurface
Special
Features
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 75,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-21 160
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # 25091
Department: Public Works
Service/Program: Roads
Capital Project Description: McQuiggan Line
Woodworth to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review generally good; some potholes, ponding along edges, no defined road turn-around, needs
curve, EOR signs
Upgrade Granular Upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $45,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $45,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 45,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 45,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-22 161
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: Public Works
Service/Program: Roads
Capital Project Description: Woodworth Rd
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade Granular Upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $15,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - -
162
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PW-23
Department: Public Works
Service/Program: Fleet
Capital Project Description: Fuel Cardlock System
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Fuel Cardlock System will assist in rebate claims. Rekey shop so no other persons required inside shop
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
163
Municipality of Bayham PW-24
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID #
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Lakeshore Line Study
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Lakeshore Line Access Options Study
Capital Budget- Total Project Cost $ 10,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3 Year 4 Year 5 Year 6
Tax Levy 10,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset(in years)
Impact on Operating Budget:
Year 1 Year2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
164
Municipality of Bayham PW-25
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Detailed Design will
ensure priority Phase projects are'Shovel Ready'to qualify for Federal Infrastructure Phase 2 Programs-Phase 1 b,c,d
Capital Budget-Total Project Cost $ 2,533,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $2,533,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 350,600.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 2,182,400.00 FCM-OCIFTU
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 2,533,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
165
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PW-26
Department: Public Works
Service/Program: Roads
Capital Project Description: Light Line End Treatments
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Proper standardized bridge end treatments are required for Light Line
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds
Subdividers Agreements
Government Grant 25,000 Gas Tax
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 25,000'
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
166
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PW-27
Department: Public Works
Service/Program: Roads
Capital Project Description: Bridge Repairs-Godby Rd
Capital Project Priority / Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Godby bridge requires repairs to the concrete abatements, end treatments, waterproof& pave deck.
Engineer and tender
Capital Budget - Total Project Cost $110,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $110,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 110,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 110,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
167
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PW-28
Department: Public Works
Service/Program: Roads
Capital Project Description: Best Line Culvert Cable Guard Rails
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Best Line Culvert requires triple cable guardrails to be installed
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
168
Municipality of Bayham PW-29
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID#
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Front End Loader
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Replacing existing 2007 asset which is costing too much in maintenance. Critical to operations
Capital Budget-Total Project Cost $ 325,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 325,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 300,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale $ 25,000.00
Other:specify
Total Financing $ 325,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
169
Municipality of Bayham PW-30
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Pick Up Truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
2010 Pick Up Truck, needs to be replaced as it is cost prohibitive to maintain. This unit is vital to the Public Works fleet to
maintain municipal and county roads, Parks and Recreation.
Capital Budget- Total Project Cost $ 25,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 25,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 25,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
170
Municipality of Bayham PW-31
Capital Budget- Information Sheet
Year: (indicate year) 2020 Asset ID#
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: 2 Ton Pick Up Truck
Capital Project Priority/Need For Work: (check all that apply) _
Health or Safety Issue _ Growth Related Need
Energy-Environmental Sustainability _ Service Enhancement
X Cost Savings-Improvement to Existing Asset _ Accessibility Improvement
X Asset Replacement Other
Comments:
Replace existing 2007 1 Ton Pick Up truck with a 2 Ton Pick Up Truck This unit is vital to the Public Works fleet to maintain
municipal and county roads,Parks and Recreation.
Capital Budget-Total Project Cost $ 80,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 80,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 80,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 80,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs _
Net Impact $ - $ - $ - $ - $
Municipality of Bayham 171
Capital Budget - Information Sheet PW-32
Year: (indicate year) 2020 Asset ID # 25026
Department: Public Works
Service/Program: Roads
Capital Project Description: Teall Nevill
Plank to Glen Erie
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good, but some resurfacing and spot repairs anticipated
Upgrade
Plan Y4-6: resurface with single T&C
Special
Features
Capital Budget - Total Project Cost $50,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 50,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-33 172
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # 25042
Department: Public Works
Service/Program: Roads
Capital Project Description: Elliot Road
Pressey to Talbot
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good surface, narrow shoulders,some minor patching and edge cracking
Upgrade
Plan resurface with single T&C
Special OP-designated rural residential area on west side
Features
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-34 173
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # 25193
Department: Public Works
Service/Program: Roads
Capital Project Description: Mitchell Road
Heritage to Jackson
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good condition
Upgrade
Plan resurface with single T&C, rebuild where required
Special
Features
Capital Budget - Total Project Cost $90000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $90,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 90,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 90,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
174
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PW-35
Department: Public Works
Service/Program: Roads
Capital Project Description: Jackson Line East
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Jackson Line East reconstruction and double surface treatment
Capital Budget - Total Project Cost $350,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 350,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 350,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
175
Municipality of Bayham PW-36
Capital Budget-Information Sheet
Year: (indicate year) 2021 Asset ID#
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Backhoe
Capital Project Priority/Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Replace the existing 2011 backhoe which is at end of life
Capital Budget-Total Project Cost $ 170,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 170,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 150,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale $ 20,000.00
Other:specify
Total Financing $ 170,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
176
Municipality of Bayham PW-37
Capital Budget- Information Sheet
Year: (indicate year) 2021 Asset ID#
Department: PUBLIC WORKS
Service/Program: Parking
Capital Project Description: Pitt St.Parking
Capital Project Priority/Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Develop parking lot at base of Pitt St.West. Install stairs to parking lot.
Capital Budget-Total Project Cost $ 80,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 80,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 80,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 80,000.00
Specify the Expected Useful Life of the Asset(in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
177
Municipality of Bayham PW-38
Capital Budget - Information Sheet
Year: (indicate year) 2021 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Detailed Design will
ensure priority Phase projects are'Shovel Ready'to qualify for Federal Infrastructure Phase 2 Programs-Phase 1 e,f
Capital Budget-Total Project Cost $ 1,600,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $1,600,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 200,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 1,400,000.00 FCM-OCIFTU
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 1,600,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
178
Municipality of Bayham PW-39
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Tandem
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Truck 03, a 2012 International needs to be replaced as it is cost prohibitive to maintain.
Capital Budget- Total Project Cost $ 350,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 330,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale $ 20,000.00
Other:specify
Total Financing $ 350,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
179
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-40
Department: Public Works
Service/Program: Roads
Capital Project Description: Maple Grove Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
single TC
Capital Budget - Total Project Cost $140,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $140,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds
Subdividers Agreements
Government Grant 140,000
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 140,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-41 180
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25052
Department: Public Works
Service/Program: Roads
Capital Project Description: Springer Hill Road
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan rsingle T&C
Special meas. 7.0m, Springer Hill Rd. Culv. (52004), 36.7m I., 3.4m w.;1960
Features
Capital Budget - Total Project Cost $140,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $140,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 140,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-42 181
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25006
Department: Public Works
Service/Program: Roads
Capital Project Description: Eden Line
Springerhill to Culloden
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan single TC
Special Eden Line Culv. (52003), CPS Pipe 8.5m pl.w., 24m I., 3.3m w.; 1960
Features
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 40,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-43 182
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25075
Department: Public Works
Service/Program: Roads
Capital Project Description: Coyle Road
Heritage-Banor
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good condition, add curve/int. warning signs before Vincent
Upgrade
Plan resurface with single T&C
Special
Features
Capital Budget - Total Project Cost $113,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $113,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 113,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 113,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
183
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-44
Department: Public Works
Service/Program: Roads
Capital Project Description: George St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Resurface-Asphalt
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
184
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-45
Department: Public Works
Service/Program: Roads
Capital Project Description: Henry St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Resurface Asphalt
Capital Budget - Total Project Cost $19,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $19,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 19,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 19,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
185
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-46
Department: Public Works
Service/Program: Roads
Capital Project Description: Baldwin Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $13,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $13,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 13,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 13,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
186
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-47
Department: Public Works
Service/Program: Roads
Capital Project Description: Ball Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $4,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $4,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 4,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 4,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
187
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-48
Department: Public Works
Service/Program: Roads
Capital Project Description: Bayham Drive
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-49 188
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25004
Department: Public Works
Service/Program: Roads
Capital Project Description: Bayham Norfolk Boundary Road
Plank to Heritage Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review narrow bridge-approach needs guard rails, 2MC, 0. Hall int., Coyle int.,two 90 deg. bends,
review curve signage
Upgrade Gravel- resurface with single T&C
Plan
Special Baynor S. Bridge (53003), conc. rigid frame, 9.3 m long, 5.4m wide; 1915
Features
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 75,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
189
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-50
Department: Public Works
Service/Program: Roads
Capital Project Description: Beattie Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
190
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-51
Department: Public Works
Service/Program: Roads
Capital Project Description: Black Bridge Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-52 191
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25022
Department: Public Works
Service/Program: Roads
Capital Project Description: Chute Line
Just past Chapel to Tollgate
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan regular granular upgrades
Special
1.7km
Features
Capital Budget - Total Project Cost $35,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000.00
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
192
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-53
Department: Public Works
Service/Program: Roads
Capital Project Description: Clarke Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $65,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $65,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 65,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 65,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
193
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-54
Department: Public Works
Service/Program: Roads
Capital Project Description: Clearview Drive
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $2,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $2,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 2,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 2,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
194
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-55
Department: Public Works
Service/Program: Roads
Capital Project Description: Coyle Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $40,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 40,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
195
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-56
Department: Public Works
Service/Program: Roads
Capital Project Description: Creek Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
196
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-57
Department: Public Works
Service/Program: Roads
Capital Project Description: Csinos Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-58 197
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 25081
Department: Public Works
Service/Program: Roads
Capital Project Description: Dennis Road
Calton to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
narrow road shoulders; road and shoulder erosion recently repaired
Upgrade
Plan monitor shoulder erosion, regular granular upgrades
Special
Features section length increased from 0.9 to 1.3km (maintained portion)
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-59 198
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Eden Line
major curve to Bayham Norfolk Boundary
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
safety concerns with steep side slopes,curves,trees in shoulders
Upgrade Granular Upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 25,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
199
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-60
Department: Public Works
Service/Program: Roads
Capital Project Description: Godby Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 75,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
200
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PW-61
Department: Public Works
Service/Program: Roads
Capital Project Description: Gregson Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
201
Municipality of Bayham PW-62
Capital Budget-Information Sheet
Year: (indicate year) 20221 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Harmony Acres Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 10,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 10,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 10,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 10,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
202
Municipality of Bayham PW-63
Capital Budget-Information Sheet
Year: (indicate year) 20221 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Hoover Valley Rd
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 4,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 4,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 4,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 4,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
203
Municipality of Bayham PW-64
Capital Budget-Information Sheet
Year: (indicate year) 20221 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Howey Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 55,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 55,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 55,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 55,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
204
Municipality of Bayham PW-65
Capital Budget-Information Sheet
Year: (indicate year) 20221 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Jackson Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 10,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 10,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 10,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 10,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
205
Municipality of Bayham PW-66
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/ Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Conduct replacements-
Phase 3
Capital Budget-Total Project Cost $ 3,100,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 3,100,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 1,450,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 1,650,000.00
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 3,100,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
206
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # PW-67
Department: Public Works
Service/Program: Roads
Capital Project Description: Baynor South Bridge
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Replace Baynor South Bridge
Capital Budget - Total Project Cost $275,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $275,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 45,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 230000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 275,000`
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
Municipality of Bayham PW-68 207
Capital Budget - Information Sheet
Year: (indicate year) 2021 Asset ID # 25028
Department: Public Works
Service/Program: Roads
Capital Project Description: Pressey Line
Springer Hill to Bayham Drive
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
collector road to Tillsonburg;generally in good condition,some cracking
Upgrade
Plan resurface with asphalt(50mm), add gran.A to shoulders
Special
Features
Capital Budget - Total Project Cost $260,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $260,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 260,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 260,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-69 208
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25093
Department: Public Works
Service/Program: Roads
Capital Project Description: Brown Road
Vienna to Nova Scotia
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some surface cracking
Upgrade
Plan resurface with double T&C
Special
Features
Capital Budget - Total Project Cost $160,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $160,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 160,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 160,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-70 209
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25041
Department: Public Works
Service/Program: Roads
Capital Project Description: Green Line
Talbot to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
older T&C,some cracking;serves autobody shop at end
Upgrade resurface with double T&C
Plan
Special
Features
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-71 210
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25089
Department: Public Works
Service/Program: Roads
Capital Project Description: Vienna Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some surface patches&cracking, especially approx. 100m west of residential area
Upgrade pulverize,add gran.A,grade and compact, double T&C
Plan
Special rural residential section on north side, at east end near Vienna
Features
Capital Budget - Total Project Cost $350,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 350,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 350,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-72 211
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25072
Department: Public Works
Service/Program: Roads
Capital Project Description: Toll Gate Road
Tunnel to Heritage
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan resurface single TC
Special
Features
Capital Budget - Total Project Cost $178,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $178,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 178,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 178,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - -
Municipality of Bayham PW-73 212
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # 25035
Department: Public Works
Service/Program: Roads
Capital Project Description: James Line
Richmond to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good, narrows towards end; no curve signs or turn-around, some narrow shoulders
Upgrade granular upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 40,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-74 213
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25091
Department: Public Works
Service/Program: Roads
Capital Project Description: McQuiggan Line
Woodworth to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review generally good; some potholes, ponding along edges, no defined road turn-around, needs
curve, EOR signs
Upgrade Granular Upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $25,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 25,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 2-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
214
Municipality of Bayham PW-75
Capital Budget-Information Sheet
Year: (indicate year) 20231 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Mitchell Rd
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 40,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 40,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 40,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 40,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
Municipality of Bayham PW-76 215
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25097
Department: Public Works
Service/Program: Roads
Capital Project Description: Orchard Line
Nova Scotia to Brown
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan granular upgrades
Special
Features
Capital Budget - Total Project Cost $5,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $5,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 5,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 5,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - -
216
Municipality of Bayham PW-77
Capital Budget-Information Sheet
Year: (indicate year) 20231 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Ottergate Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 2,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 2,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 2,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 2,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
217
Municipality of Bayham PW-78
Capital Budget-Information Sheet
Year: (indicate year) 20231 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Owlcage Rd
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 8,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 8,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 8,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 8,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
218
Municipality of Bayham PW-79
Capital Budget-Information Sheet
Year: (indicate year) 20231 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Ridge Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 45,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 45,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 45,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 45,000.00
Specify the Expected Useful Life of the Asset(1s years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
Municipality of Bayham PW-80 219
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Sandytown Road
Sandytown Road
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade regular granular upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $100,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $100,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 100,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 100,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - -
Municipality of Bayham PW-81 220
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # 25047
Department: Public Works
Service/Program: Roads
Capital Project Description: Somers Road
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
granular upgrades
Upgrade
Plan
Special
Features
Capital Budget - Total Project Cost $87,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $87,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 87,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 87,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - -
221
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # PW-82
Department: Public Works
Service/Program: Roads
Capital Project Description: Stewart Rd - regular granular upgrades
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments 1_
Regular granular upgrade cycle to maintain adequate road surface. Improve drainage
Capital Budget - Total Project Cost $60,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $60,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 60,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 60,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
222
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # PW-83
Department: Public Works
Service/Program: Roads
Capital Project Description: Toll Gate Rd
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments 1_
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $55,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $55,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 55,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 55,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
223
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # PW-84
Department: Public Works
Service/Program: Roads
Capital Project Description: Woodworth Rd
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments 1_
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $55,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $55,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 55,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 55,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-85 224
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25197
Department: Public Works
Service/Program: Roads
Capital Project Description: Murray Road
Talbot to Eden
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some spot repairs needed
Upgrade
Plan resurface with single T&C
Special
Features
Capital Budget - Total Project Cost $60,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $60,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 60,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 60,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-86 225
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25083
Department: Public Works
Service/Program: Roads
Capital Project Description: Light Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review recent surface coat-very good,except minor cracking near bridge; recommend guard rails for
bridge approaches(bridge item)
Upgrade
Plan resurface as required
Special Light Line Br. (53005); rigid frame- 2 lanes; 9.1m long, 7.8m wide; 1930
Features
Capital Budget - Total Project Cost $330,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $330,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant _ 330,000
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 330,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
226
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # PW-87
Department: Public Works
Service/Program: Roads
Capital Project Description: Jackson Line East
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Single TC
Capital Budget - Total Project Cost $120,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $120,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 120,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 120,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-88 227
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25140
Department: Public Works
Service/Program: Roads
Capital Project Description: Ann Street
Union to Edison
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $80,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $80,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 80,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 80,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-89 228
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Centre Street
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
local access road, some cracking, pavement cuts/patches, no signs or turn-around at end
Upgrade
Plan Sign Review: install EOR checkerboard sign at end; resurface as required
Special
Features
Capital Budget - Total Project Cost $160,000
the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $160,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 160,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 160,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-90 229
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25143
Department: Public Works
Service/Program: Roads
Capital Project Description: Chestnut Street
Union to Elm
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
a few large cracks, mostly between Queen and Elm
Upgrade
Plan seal large cracks(maint.); resurface as required
Special
Features
Capital Budget - Total Project Cost $50,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 50,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-91 230
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Edison Drive
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade Resurface as required
Plan
Special
Features
Capital Budget - Total Project Cost $190,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $190,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 190,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 190,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-92 231
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25141
Department: Public Works
Service/Program: Roads
Capital Project Description: Elm Street
Plank to Chestnut
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
additional parking lane between Plank and Fulton
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $150,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $150,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 150,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 150,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-93 232
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25135
Department: Public Works
Service/Program: Roads
Capital Project Description: Front Street
Plank to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no sign at end of street
Upgrade seal large cracks(maint.), install EOR checkerboard sign at end of street;Y10+: resurface as
Plan required
Special
Features
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-94 233
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25129
Department: Public Works
Service/Program: Roads
Capital Project Description: Fulton Street
Union to Centre
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan seal large cracks(maint.); resurface as required
Special
Features
Capital Budget - Total Project Cost $45,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $45,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 45,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 45,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-95 234
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25132
Department: Public Works
Service/Program: Roads
Capital Project Description: King Street
Water to North
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-96 235
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25131
Department: Public Works
Service/Program: Roads
Capital Project Description: North Street
Plank to Chapel
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
pavement reasonably level, but extensive small cracks on north part
Upgrade
Plan resurface
Special
Features
Capital Budget - Total Project Cost $65,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $65,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 65,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 65,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-97 236
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25137
Department: Public Works
Service/Program: Roads
Capital Project Description: Oak Street
Plank to Queen
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan seal large cracks(maint.); resurface as required
Special
Features
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-98 237
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25148
Department: Public Works
Service/Program: Roads
Capital Project Description: Old Mill Line
Plank Road to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $50,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 50,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-99 238
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25136
Department: Public Works
Service/Program: Roads
Capital Project Description: Otter Street
Plank to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no sign at end of street
Upgrade
Plan install EOR checkerboard sign at end of street; resurface as required
Special
Features
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-100 239
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25146
Department: Public Works
Service/Program: Roads
Capital Project Description: Pearl Street
Centre to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no sign at end of street or turn-around
Upgrade install EOR checkerboard sign at end of pavement(start of laneway); resurface as required
Plan
Special
Features
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-101 240
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25144
Department: Public Works
Service/Program: Roads
Capital Project Description: Pine Street
Fulton to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no sign at end of street or turn-around, house/laneway at end of street
Upgrade install EOR checkerboard sign at end; resurface as required
Plan
Special
Features
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 25,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - - -
241
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # PW-102
Department: Public Works
Service/Program: Roads
Capital Project Description: Queen St.
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
resurface
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-103 242
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25142
Department: Public Works
Service/Program: Roads
Capital Project Description: Snow Street
Fulton to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no sign at end of street or turn-around, house/laneway at end of street
Upgrade
Plan install EOR checkerboard sign at end; resurface as required
Special
Features
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-104 243
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25149
Department: Public Works
Service/Program: Roads
Capital Project Description: Soper Road
Old Mill to Light Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
generally good condition, some cracking, especially along edges
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 75,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-105 244
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25145
Department: Public Works
Service/Program: Roads
Capital Project Description: Union Street
end south of Fulton to north end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
no signs or turn-arounds at north/south ends; adjacent houses at both ends
Upgrade
Plan install EOR checkerboard sign at end; resurface as required
Special
Features
Capital Budget - Total Project Cost $80,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $80,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 80,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 80,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-106 245
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25133
Department: Public Works
Service/Program: Roads
Capital Project Description: Walnut Street
Plank to North
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-107 246
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # 25134
Department: Public Works
Service/Program: Roads
Capital Project Description: Water Street
Plank/Walnut to King
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
247
Municipality of Bayham PW-108
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Tandem
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Truck 04, a 2015 International needs to be replaced as it is cost prohibitive to maintain.
Capital Budget- Total Project Cost $ 350,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 330,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale $ 20,000.00
Other:specify
Total Financing $ 350,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
Municipality of Bayham PW-109 248
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25126
Department: Public Works
Service/Program: Roads
Capital Project Description: Alward Street
Heritage to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-110 249
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25127
Department: Public Works
Service/Program: Roads
Capital Project Description: Arthur Street
Plank to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-111 250
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25123
Department: Public Works
Service/Program: Roads
Capital Project Description: Donnelly Drive
Duke to Old Chapel
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review some cracking,especially along edges;adjacent to res. building lots-subject to future
construction impacts
Upgrade
Plan seal larger cracks(maint.); resurface as required
Special
0
Features
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/ Proceeds on Sale _
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-112 251
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25128
Department: Public Works
Service/Program: Roads
Capital Project Description: Duke Street
Heritage to Donnelly
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
adjacent paved church area along street
Upgrade
Plan resurface as required
Special
Features paved parking adj. to church
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-113 252
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25118
Department: Public Works
Service/Program: Roads
Capital Project Description: East Street
Main to First
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-114 253
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25187
Department: Public Works
Service/Program: Roads
Capital Project Description: Elgin Street
Third to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-115 254
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25112
Department: Public Works
Service/Program: Roads
Capital Project Description: Fifth Street
Plank to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade Sign Review: install EOR/checkerboard sign at end of paved road; resurface as required
Plan
Special
Features
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,0000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-116 255
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25115
Department: Public Works
Service/Program: Roads
Capital Project Description: First Street
Plank to CPR Corridor
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $55,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $55,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 55,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 55,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-117 256
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25113
Department: Public Works
Service/Program: Roads
Capital Project Description: Fourth Street
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $55,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $55,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 55,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 55,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
257
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # PW-118
Department: Public Works
Service/Program: Roads
Capital Project Description: Garner Rd
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
resurface
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-119 258
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25125
Department: Public Works
Service/Program: Roads
Capital Project Description: Garnham Street
Heritage to Hesch
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
paved parking lanes between Heritage and Main
Upgrade
Plan Sign Review: install school caution sign at south end of road; resurface as required
Special
Features
Capital Budget - Total Project Cost $55,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $55,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 55,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 55,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-120 259
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25124
Department: Public Works
Service/Program: Roads
Capital Project Description: Hesch Street
east end to west end at school
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
street extends west into school yard,west into private driveway(exist. sign)
Upgrade Sign Review: install EOR sign east end driveway,school caution sign at school driveway;
Plan resurface as required
Special Hesch St. west is rear driveway to Straffordville P.S.
Features
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-121 260
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25116
Department: Public Works
Service/Program: Roads
Capital Project Description: Main Street
Old Chapel to Plank
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
good condition,some cracks
Upgrade
Plan seal large cracks(maint.); resurface as required
Special
Features
Capital Budget - Total Project Cost $110,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $110,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 110,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 110,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-122 261
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25122
Department: Public Works
Service/Program: Roads
Capital Project Description: Old Chapel Street
Main to Donnelly
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features gravel parking adj. to Comm. Centre
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-123 262
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25117
Department: Public Works
Service/Program: Roads
Capital Project Description: Second Street
West to CPR Corridor
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-124 263
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25121
Department: Public Works
Service/Program: Roads
Capital Project Description: Sandytown Road
Heritage to Plank
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some minor cracking along edges
Upgrade
Plan patch edge cracks as required (maint.); resurface as required
Special
Features
Capital Budget - Total Project Cost $45,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $45,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 45,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 45,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-125 264
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25120
Department: Public Works
Service/Program: Roads
Capital Project Description: Short Street
Third to Fourth
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 18,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-126 265
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # 25114
Department: Public Works
Service/Program: Roads
Capital Project Description: Third Street
Elgin to CPR Corridor
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $70,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $70,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 70,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 70,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
266
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # PW-127
Department: Public Works
Service/Program: Roads
Capital Project Description: Wardwalk St.
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
resurface
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
267
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID # PW-128
Department: Public Works
Service/Program: Roads
Capital Project Description: West St.
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
resurface
Capital Budget - Total Project Cost $70,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $70,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 70,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 70,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
268
Municipality of Bayham PW-129
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/ Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Conduct replacements-
Phase 2
Capital Budget-Total Project Cost $ 2,800,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 2,800,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 700,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 2,100,000.00
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 2,800,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
269
Municipality of Bayham PW-130
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/ Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Conduct replacements-
Phase 4
Capital Budget-Total Project Cost $ 2,100,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 2,100,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 600,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 1,500,000.00
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 2,100,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
270
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PW-131
Department: Public Works
Service/Program: Roads
Capital Project Description: Roads Needs Study
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Update of Roads Needs Study
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000 Year 4
Year 2 Year 5
Year 3 Year 6 25,000
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 25,000 25,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 25,000 25,000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
271
Municipality of Bayham PW-132
Capital Budget - Information Sheet
Year: (indicate year) 2025 Asset ID#
Department: PUBLIC WORKS
Service/Program: STORM SEWER
Capital Project Description: Storm Sewer Detailed Design-Port Burwell
Capital Project Priority/ Need For Work: (checkalithatapply)
X Health or Safety Issue Growth Related Need
X Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Storm Sewer Master Plan and Analysis have determined a path forward for Storm Sewer Replacement. Conduct replacements-
Phase 5
Capital Budget-Total Project Cost $ 1,700,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 1,700,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 400,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant $ 1,300,000.00
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 1,700,000.00
Specify the Expected Useful Life of the Asset(in years) 50
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
272
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2026 Asset ID # PW-133
Department: Public Works
Service/Program: Roads/Water/Wastewater
Capital Project Description: Grader Replacement
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Replace 1986 Grader
Capital Budget - Total Project Cost $425,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $425,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 375,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale 50000
Other: specify
'Total Financing 425,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
273
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2026 Asset ID # PW-134
Department: Public Works
Service/Program: Roads/Water/Wastewater
Capital Project Description: Tandem Truck Replacement
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Replace 2015 MAC
Capital Budget - Total Project Cost $350,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $350,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 330,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale 20000
Other: specify
'Total Financing 350,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-135 274
Capital Budget - Information Sheet
Year: (indicate year) 2026 Asset ID # 25004
Department: Public Works
Service/Program: Roads
Capital Project Description: Bayham Norfolk Boundary Road
Plank to Heritage Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review narrow bridge-approach needs guard rails, 2MC, 0. Hall int., Coyle int.,two 90 deg. bends,
review curve signage
Upgrade resurface with single T&C
Plan
Special Baynor S. Bridge (53003), conc. rigid frame, 9.3 m long, 5.4m wide; 1915
Features
Capital Budget - Total Project Cost $60,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $60,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 60,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 60,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
275
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2026 Asset ID # PW-136
Department: Public Works
Service/Program: Roads
Capital Project Description: Bogus Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Resurface
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 20,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
276
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-137
Department: Public Works
Service/Program: Roads
Capital Project Description: Sandytown Rd Culvert
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Sandytown Rd Culvert Replacement
Capital Budget - Total Project Cost $7,500
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $7,500 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 7,500
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 7,500
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
277
Municipality of Bayham PW-138
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID #
Department: PUBLIC WORKS
Service/Program: FLEET
Capital Project Description: Pick Up Truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
2017 Truck Replacement
Capital Budget- Total Project Cost $ 40,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 40,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 40,000.00
Specify the Expected Useful Life of the Asset(in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact $ - $ - $ - $ - $
Municipality of Bayham PW-139 278
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25089
Department: Public Works
Service/Program: Roads
Capital Project Description: Vienna Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some surface patches&cracking, especially approx. 100m west of residential area
Upgrade pulverize,add gran.A,grade and compact, double T&C
Plan
Special
Features Single TC
Capital Budget - Total Project Cost $180,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $180,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 180,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 180,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-140 279
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25093
Department: Public Works
Service/Program: Roads
Capital Project Description: Brown Road
Vienna to Nova Scotia
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some surface cracking
Upgrade
Plan single T&C
Special
Features
Capital Budget - Total Project Cost $80,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $80,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 80,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 80,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
280
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-141
Department: Public Works
Service/Program: Roads
Capital Project Description: Faye St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Asphalt
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 18,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
281
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-142
Department: Public Works
Service/Program: Roads
Capital Project Description: Homer St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Asphalt
Capital Budget - Total Project Cost $18,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $18,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 18,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 18,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-143 282
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Hurley Lane
Bridge Street to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
harbour access road,good construction wtih steel guide rails
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-144 283
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25176
Department: Upgrade Years 7 to 9
Service/Program: Roads
Capital Project Description: Southey Street
Addison to Chatham
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-145 284
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25173
Department: Public Works
Service/Program: Roads
Capital Project Description: Addison Street
Libbye to Cowper
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some cracking, but generally good
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $130,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $130,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 130,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 130,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-146 285
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25174
Department: Public Works
Service/Program: Roads
Capital Project Description: Burwell Street
Addison to Chatham
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan resurface as required
Special
Features
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham Line 286
Capital Budget - Information Sheet PW-147
Year: (indicate year) 2027 Asset ID # 25161
Department: Public Works
Service/Program: Roads
Capital Project Description: Tennyson
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
0
Upgrade
Plan Y7-9: resurface as required
Special
Features
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-148 287
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25192
Department: Public Works
Service/Program: Roads
Capital Project Description: Cowper Street
Addison to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
some cracks, patching needed on west side of Chatham
Upgrade
Plan resurface
Special
Features
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
288
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-149
Department: Public Works
Service/Program: Roads
Capital Project Description: Travis St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Asphalt
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 10,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
289
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-150
Department: Public Works
Service/Program: Roads
Capital Project Description: Grey St.
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments :
Asphalt
Capital Budget - Total Project Cost $30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 5
Tax Levy 30,000
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other: specify
'Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
290
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-151
Department: Public Works
Service/Program: Roads
Capital Project Description: Baldwin Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $13,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $13,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 13,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 13,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
291
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-152
Department: Public Works
Service/Program: Roads
Capital Project Description: Ball Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $4,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $4,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 4,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 4,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
292
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-153
Department: Public Works
Service/Program: Roads
Capital Project Description: Bayham Drive
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-154 293
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25004
Department: Public Works
Service/Program: Roads
Capital Project Description: Bayham Norfolk Boundary Road
Plank to Heritage Line
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review narrow bridge-approach needs guard rails, 2MC, 0. Hall int., Coyle int.,two 90 deg. bends,
review curve signage
Upgrade Gravel
Plan
Special Baynor S. Bridge (53003), conc. rigid frame, 9.3 m long, 5.4m wide; 1915
Features
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 75,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 2-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
294
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-155
Department: Public Works
Service/Program: Roads
Capital Project Description: Beattie Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
295
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-156
Department: Public Works
Service/Program: Roads
Capital Project Description: Black Bridge Line
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-157 296
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25022
Department: Public Works
Service/Program: Roads
Capital Project Description: Chute Line
Just past Chapel to Tollgate
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
Upgrade
Plan regular granular upgrades
Special
1.7km
Features
Capital Budget - Total Project Cost $35,000.00
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 35,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000.00
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
297
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-158
Department: Public Works
Service/Program: Roads
Capital Project Description: Clarke Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $65,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $65,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 65,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 65,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
298
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-159
Department: Public Works
Service/Program: Roads
Capital Project Description: Clearview Drive
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $2,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $2,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 2,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 2,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
299
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-160
Department: Public Works
Service/Program: Roads
Capital Project Description: Coyle Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $40,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 40,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 40,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
300
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-161
Department: Public Works
Service/Program: Roads
Capital Project Description: Creek Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
301
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-162
Department: Public Works
Service/Program: Roads
Capital Project Description: Csinos Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $10,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 _ Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 10,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
Municipality of Bayham PW-163 302
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 25081
Department: Public Works
Service/Program: Roads
Capital Project Description: Dennis Road
Calton to end
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
narrow road shoulders; road and shoulder erosion recently repaired
Upgrade
Plan monitor shoulder erosion, regular granular upgrades
Special
Features section length increased from 0.9 to 1.3km (maintained portion)
Capital Budget - Total Project Cost $15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
Municipality of Bayham PW-164 303
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # 0
Department: Public Works
Service/Program: Roads
Capital Project Description: Eden Line
major curve to Bayham Norfolk Boundary
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Review
safety concerns with steep side slopes,curves,trees in shoulders
Upgrade Granular Upgrades
Plan
Special
Features
Capital Budget - Total Project Cost $25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 25,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - - -
304
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-165
Department: Public Works
Service/Program: Roads
Capital Project Description: Godby Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 75,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
305
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # PW-166
Department: Public Works
Service/Program: Roads
Capital Project Description: Gregson Rd
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Regular granular upgrade cycle to maintain adequate road surface.
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $35,000 Year 4
Year 2 Year 5 _
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: _ Year 1 _ Year 2 Year 3
Tax Levy 35,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact - - -
306
Municipality of Bayham PW-167
Capital Budget-Information Sheet
Year: (indicate year) I 2027I Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Harmony Acres Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 10,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 10,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 10,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 10,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
307
Municipality of Bayham PW-168
Capital Budget-Information Sheet
Year: (indicate year) I 20271 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Hoover Valley Rd
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 4,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 4,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 4,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 4,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
308
Municipality of Bayham PW-169
Capital Budget-Information Sheet
Year: (indicate year) I 20271 Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Howey Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 55,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 55,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 55,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 55,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
309
Municipality of Bayham PW-170
Capital Budget-Information Sheet
Year: (indicate year) I 2027I Asset ID# I I
Department: PUBLIC WORKS
Service/Program: ROADS
Capital Project Description: Jackson Line
Capital Project Priority/Need For Work: (check an that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
Granular Upgrades
Capital Budget-Total Project Cost $ 10,000.00
lithe Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $ 10,000.00 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget-Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy $ 10,000.00
Reserves/Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $ 10,000.00
Specify the Expected Useful Life of the Asset(in years) 3-5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs
Net Impact
310
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # W-1
Department: Water and Wastewater
Service/Program: Water
Capital Project Description: Air Valves
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Evaluation and associated repairs of air release valve chambers
Capital Budget - Total Project Cost $67,500
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2018 Year 1 $13,500 Year 4 $13,500 2021
2019 Year 2 $13,500 Year 5 $13,500 2022
2020 Year 3 $13,500 Year 6 $0
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 13,500 13,500 13,500
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $13,500 13,500 13,500
Specify the Expected Useful Life of the Asset (in years) 30
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
311
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # W-2
Department: Water and Wastewater
Service/Program: Water
Capital Project Description: Water Financial Plan
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Water Financial Plan Update
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2017 Year 1 $35,000 Year 4 $0
2018 Year 2 Year 5 $0
Year 3 Year 6 $0
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 35,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $35,000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
312
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID# W-3
Department: Water and Wastewater
Service/Program: Water--Richmond
Capital Project Description: Water treatment equipment rebuilds/replacement
Capital Project Priority/ Need For Work: (check al/that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Ensure water treatment equipment reliability at all times
Capital Budget-Total Project Cost $45,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $15,000 Year 4
Year 2 $15,000 Year 5
Year 3 $15,000 Year 6
Capital Budget- Financing(indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/Reserve Funds 45,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In/Proceeds on Sale
Other:specify
Total Financing $45,000
Specify the Expected Useful Life of the Asset(in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings(decrease)in Operating Costs less operator time due to breakdowns
Net Impact - - -
313
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # W-4
Department: Water and Wastewater
Service/Program: Water
Capital Project Description: Water Financial Plan
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
Water Financial Plan Update
Capital Budget - Total Project Cost $35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2017 Year 1 $35,000 Year 4 $0
2018 Year 2 Year 5 $0
Year 3 Year 6 $0
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 35,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $35,000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
314
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2021 Asset ID # W-5
Department: Water and Wastewater
Service/Program: Water/Wastewater
Capital Project Description: New Pick up truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments:
New pick up truck to be shared between water and wastewater dept.
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 40,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $40,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
315
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2027 Asset ID # W-6
Department: Water and Wastewater
Service/Program: Water/Wastewater
Capital Project Description: New Pick up truck
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments :
New pick up truck to be shared between water and wastewater dept.
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 40,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 40,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $40,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
316
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2017 Asset ID # WW-1
Department: Water and Wastewater
Service/Program: Nastewater Treatment Plant and Collectior
Capital Project Description Pumps,blowers,electric motors, etc. --- rebuild/ replace with high efficient
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
x Energy-Environmental Sustainability Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments :
Ensure secure, safe, reliable,efficient wastewater equipment.
Capital Budget - Total Project Cost $125,001
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2018 Year 1 $41,667 Year 4
2019 Year 2 $41,667 Year 5
2020 Year 3 $41,667 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 41,667 41667 41667
Subdividers Agreements
Government Grant
Trillium Grant
Trade In /Proceeds on Sale
Other: specify
Total Financing $41,667 41667 41667
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3
Increase in Operating Costs
Savings (decrease) in Operating Costs less freq. breakdowns and energy savings
Net Impact - - -
317
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # WW-2
Department: Water and Wastewater
Service/Program: Wastewater collection
Capital Project Description: Manhole Rehabilitation
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
x Energy-Environmental Sustainability Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Ensure secure, safe, reliable wastewater network with min. I&I at all times.
Capital Budget - Total Project Cost $50,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $50,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 50,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing $50,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs less frequent maint.
Net Impact
318
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # WW-3
Department: Water and Wastewater
Service/Program: Wastewater Collection
Capital Project Description Replacement of pump station check valves (PS#1,2,5,6)
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments :
Ensure secure, safe, reliable,efficient wastewater equipment.
Capital Budget - Total Project Cost $40,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2018 Year 1 $10,000 2021 Year 4 $10,000
2019 Year 2 $10,000 Year 5 $0
2020 Year 3 $10,000 Year 6 $0
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 10,000 $10,000 $10,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In /Proceeds on Sale
Other: specify
Total Financing $10,000 10,000 10,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3
Increase in Operating Costs
Savings (decrease) in Operating Costs less freq. breakdowns and energy savings
Net Impact - - -
319
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # WW-4
Department: Water and Wastewater
Service/Program: Wastewater Collection and Plant Pumps
Capital Project Description Replacement of wastewater pumps
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments :
Ensure secure, safe, reliable,efficient wastewater equipment.
Capital Budget - Total Project Cost $320,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
2020 Year 1 $40,000 2023 Year 4 $40,000
2021 Year 2 $40,000 2024 Year 5 $40,000
2022 Year 3 $40,000 2025 Year 6 $40,000
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 40,000 $40,000 $40,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In /Proceeds on Sale
Other: specify
Total Financing $10,000 10,000 10,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3
Increase in Operating Costs
Savings (decrease) in Operating Costs less freq. breakdowns and energy savings
Net Impact - - -
320
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PR-1
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: East Pier Rehabilitation
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments
Rehabilitation of the PB East Pier
Capital Budget - Total Project Cost 150,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 150,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant 150,000
Trade In / Proceeds on Sale
Other: specify
Total Financing 150,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
321
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PR-2
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Fence Repairs
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Replace Fencing in Richmond and CSA Parks improvements
Capital Budget - Total Project Cost 35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds 20,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
322
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PR-3
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Accessible Viewing Platform
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
Cost Savings-Improvement to Existing Asset x Accessibility Improvement
x Asset Replacement Other
Comments
Accessible Viewing Platform and walkway- Remove, Rebuild - Relies on Approval of EAF Grant
Application
Capital Budget - Total Project Cost 65,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 65,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 24,000
Subdividers Agreements
Government Grant 41,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 65,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
323
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PR-4
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: PB Shed Conversion
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Convert existing PD Diamond Storage Shed into a Pavilion with Electrical Room
Capital Budget - Total Project Cost 45,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 45,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 45,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 45,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
324
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PR-5
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Flag Poles Replacement
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Replace existing flagpoles with new brushed metal that have an internal hayard eliminating need for
boom truck to replace flags
Capital Budget - Total Project Cost 10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
325
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PR-6
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Straffordville Pavilion
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Replace exterior Roof and Fascia on Pavilion
Capital Budget - Total Project Cost 10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
326
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2020 Asset ID # PR-7
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Straffordville Storage Sheds
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Replace exterior roof, paint and replace doors where required
Capital Budget - Total Project Cost 12,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 12,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 12,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 12,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
327
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2021 Asset ID # PR-8
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Playground Equipment Replacement
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset x Accessibility Improvement
x Asset Replacement Other
Comments
Cycle of Playground Equipment Replacement-Approximately$50,000/location
Capital Budget - Total Project Cost 300,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 50,000 Year 4 50,000
Year 2 50,000 Year 5 50,000
Year 3 50,000 Year 6 50,000
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 50,000 50,000 50,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 50,000 50,000 50,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
328
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # PR-9
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Electric Charging Station
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Installation of an Electric Charging Station in PB
Capital Budget - Total Project Cost 10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
329
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2019 Asset ID # PR-10
Department: Parks & Rec
Service/Program: Parks & Rec
Capital Project Description: Cenotaph Masonry
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Repair brick pavers and retaining walls.
Capital Budget - Total Project Cost 25,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 25,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 25,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 25,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
330
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2018 Asset ID # FA-1
Department: Facilities
Service/Program: SCC
Capital Project Description: SCC
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
SCC Chairs & Stage -Applied for under New Horizons Grant- Relies upon approval of grant
Capital Budget - Total Project Cost $23,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $23,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 23000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 23,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
331
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2018 Asset ID # FA-2
Department: Facilities
Service/Program: SCC
Capital Project Description: SCC Generator
Capital Project Priority/ Need For Work: (check all that apply)
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Installation of a Generator at the SCC for Emergency Management and business continuity purposes
Capital Budget - Total Project Cost $75,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $75,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 75,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 75,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
332
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # FA-3
Department: Port Burwell Library
Service/Program: Port Burwell Library
Capital Project Description: Accessible Ramp Reconstruction
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Accessible Ramp Reconstruction
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
333
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2018 Asset ID # FA-4
Department: Fire Services
Service/Program: Fire Stations
Capital Project Description: Station 2 Straffordville HVAC
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
X Asset Replacement Other
Comments:
An engineering assessment of Station 2 Straffordville highlighted that the HVAC equpment at the station
is nearing the end of its service life and is becoming coslty to repair. The system would be replaced by
high efficiency equivalents, reducing yearly maintenance and operating costs.
Capital Budget - Total Project Cost $12,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 12,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 12,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 12,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
334
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2019 Asset ID # FA-5
Department: Facilities
Service/Program: SCC
Capital Project Description: SCC Water Treatment System
Capital Project Priority/ Need For Work:
X Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
X Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments :
Installation of a Water Treatment System to provide potable water. Operational Levy Impact of
approximately$5,200 in addition to Capital Costs. Based on having a qualified person attend site for
issues.
Capital Budget - Total Project Cost $20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 $20,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 20,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 20,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
335
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2019 Asset ID # FA-6
Department: Straffordville Library
Service/Program: Straffordville Library
Capital Project Description: Straffordville Library Elevator
Capital Project Priority/ Need For Work:
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
x Cost Savings-Improvement to Existing Asset x Accessibility Improvement
Asset Replacement Other
Comments
Straffordville Library Elevator Installation
Capital Budget - Total Project Cost 200,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 200,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 150,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant 50,000
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 200,000
Specify the Expected Useful Life of the Asset (in years) 25
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
336
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2019 Asset ID # FA-7
Department: Port Burwell Library
Service/Program: Port Burwell Library
Capital Project Description: HRV- PTAC
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
HRV- PTAC
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
337
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2019 Asset ID # FA-8
Department: Marine Museum
Service/Program: Marine Museum
Capital Project Description: HRV Furnance Replacement
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
HRV Furnance Replacement
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 15,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
338
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2020 Asset ID # FA-9
Department: Public Works
Service/Program: Public Works
Capital Project Description: Salt Storage Shed Replacement
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Replacement of Salt Storage Shed
Capital Budget - Total Project Cost 100,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 100,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 100,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 100,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
339
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2020 Asset ID # FA-10
Department: Parks
Service/Program: Parks
Capital Project Description: SCC Old Chapel Parking
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments
SCC Old Chapel Parking
Capital Budget - Total Project Cost 30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
340
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2020 Asset ID # FA-10
Department: Parks
Service/Program: Parks
Capital Project Description: SCC Food Booth
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Repair inner ceiling, repair food booth portion, new plumbing. Paint exterior and new roof.
Capital Budget - Total Project Cost 35,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 35,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 35,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 35,000
Specify the Expected Useful Life of the Asset (in years) 20
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
341
Municipality of Bayham
Capital Budget - Information Sheet
Year: 2021 Asset ID # FA-12
Department: General Government
Service/Program: General Government
Capital Project Description: Facility Audits
Capital Project Priority/ Need For Work:
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments
Facility Audit Updates
Capital Budget - Total Project Cost 30,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 30,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 30,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 30,000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
342
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # FA-13
Department: Port Burwell Library
Service/Program: Port Burwell Library
Capital Project Description: Accessible Washroom - Upgrades
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Accessible Washroom - Upgrades
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 15,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
343
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2022 Asset ID # FA-14
Department: Marine Museum
Service/Program: Marine Museum
Capital Project Description: Accessible Washroom
Capital Project Priority/ Need For Work: (check all that apply)
x Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
x Asset Replacement Other
Comments
Accessible Washroom
Capital Budget - Total Project Cost 10,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing
Specify the Expected Useful Life of the Asset (in years) 15
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
344
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PD-1
Department: Planning and Development
Service/Program: Planning
Capital Project Description: Official Plan Review
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability x Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
5 Year Review regulated by the Planning Act
Capital Budget - Total Project Cost 7,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 7,000 Year 4
Year 2 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy
Reserves/ Reserve Funds 7,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 7000 0
Specify the Expected Useful Life of the Asset (in years) 5 years
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
345
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2018 Asset ID # PD-2
Department: Planning and Development
Service/Program: Planning
Capital Project Description: Zoning By-law Updates
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Zoning By-law Review Process
Capital Budget - Total Project Cost 15,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 5,000 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000 5000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10000 5000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
346
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2023 Asset ID # PD-3
Department: Planning and Development
Service/Program: Planning
Capital Project Description: Official Plan and Zoning By-law updates
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
OP Review- Reserve
Capital Budget - Total Project Cost 60,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 15,000 Year 4 10,000
Year 2 15,000 Year 5 10,000
Year 3 10,000 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 12,000 12,000 10,000
Reserves/ Reserve Funds 3,000 3,000
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 15,000 15,000 10,000
Specify the Expected Useful Life of the Asset (in years) 10
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
347
Municipality of Bayham
Capital Budget - Information Sheet
Year: (indicate year) 2024 Asset ID # PD-4
Department: Planning and Development
Service/Program: Planning
Capital Project Description: Zoning By-law Updates
Capital Project Priority/ Need For Work: (check all that apply)
Health or Safety Issue Growth Related Need
Energy-Environmental Sustainability X Service Enhancement
Cost Savings-Improvement to Existing Asset Accessibility Improvement
Asset Replacement Other
Comments:
Zoning By-law Review Process
Capital Budget - Total Project Cost 20,000
If the Project Cost will be incurred over more than 1 year-indicate which years below:
Year 1 10,000 Year 4
Year 2 10,000 Year 5
Year 3 Year 6
Capital Budget - Financing (indicate sources of funding for the project)
Source: Year 1 Year 2 Year 3
Tax Levy 10,000 10,000
Reserves/ Reserve Funds
Subdividers Agreements
Government Grant
Trillium Grant
Trade In / Proceeds on Sale
Other: specify
Total Financing 10000 10,000
Specify the Expected Useful Life of the Asset (in years) 5
Impact on Operating Budget:
Year 1 Year 2 Year 3 Year 4 Year 5
Increase in Operating Costs
Savings (decrease) in Operating Costs
Net Impact
THE CORPORATION OF THE
MUNICIPALITY OF BAYHAM
BY-LAW NO. 2017-096
A BY-LAW TO CONFIRM ALL ACTIONS OF
THE COUNCIL OF THE CORPORATION OF
THE MUNICIPALITY OF BAYHAM FOR THE
REGULAR MEETING HELD OCTOBER 3, 2017
WHEREAS under Section 5 (1) of the Municipal Act, 2001 S.O. 2001, Chapter 25, the
powers of a municipal corporation are to be exercised by the Council of the municipality;
AND WHEREAS under Section 5 (3) of the Municipal Act, 2001, the powers of Council
are to be exercised by by-law;
AND WHEREAS the Council of the Corporation of the Municipality of Bayham deems it
advisable that the proceedings of the meeting be confirmed and adopted by by-law.
THEREFORE THE COUNCIL OF THE CORPORATION OF THE MUNICIPALITY OF
BAYHAM ENACTS AS FOLLOWS:
1. THAT the actions of the Council of the Corporation of the Municipality of Bayham
in respect of each recommendation and each motion and resolution passed and
other action by the Council at the budget meeting held October 3, 2017 is hereby
adopted and confirmed as if all proceedings were expressly embodied in this by-
law.
2. THAT the Mayor and Clerk of the Corporation of the Municipality of Bayham are
hereby authorized and directed to do all things necessary to give effect to the
action of the Council including executing all documents and affixing the
Corporate Seal.
READ A FIRST, SECOND AND THIRD TIME and finally passed this 3rd day of
October, 2017.
MAYOR CLERK