Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
2016 - Third Quarter - Port Burwell Wastewater Treatment Plant
Port Burwell Wastewater Treatment Plant Year: 2016 Municipality of Bayham Works # : 110001319 Population Served: 2530 Annual Compliance Summary Design Avg Flow (me): 1060 FLOWS BIOCHEMICAL 02 DEMAND SUSPENDED SOLIDS PHOSPHORUS NITROGEN SERIES EFFLUENT SEPTAGE 2015 Total Avg. Day Max Day Avg.Raw Avg.Raw Avg. Eff. Avg. Load Avg.Raw Avg.Eff. Avg.Load Avg. Raw Avg.Eff. Avg. Load Avg.Raw Avg.Eff. Avg.Eff. Avg.Load Avg. Eff. Avg.Eff. Avg. Eff. Avg.Loading Federal(WSER) E.Coli DO Minimum Maximum Minimum Maximum RECEIVAGE Flow Flow Flow CBOD CBOD CBOD CBOD SS SS SS Phos. Phos. Phos. TKN TKN NH3+ NH4 NH3+NH4 Nitrate Nitrite Un-ionized Un-ionized Un-ionized Geo. Mean Temp. Temp. pH pH VOLUMES Month m3 m3 m3 (mg/L) (kg/day) (mg/L) (kg/day) (mg/L) (mg/L) (kg/day) ' (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) (mg/L) (kg/day) (mg/L) (mg/L) NH3+ NH4(mg/L) NH3+NH4(mg/L) NH3+ NH4(mg/L) cnt/100m1 mg/L -C -C m- January 18136 585.0 724.0 222.3 130.05 2.8 1.64 170.8 4.4 2.57 5.39 0.32 0.19 48.70 1.03 0.18 0.11 16.03 0.07 0.0005 0.0003 36.42 5.30 8.8 12.1 7.01 7.22 February 18137 625.4 798.0 167.6 104.82 3.2 2.00 210.2 5.3 3.31 5.89 0.32 0.20 50.10 1.16 0.35 0.22 14.05 0.81 0.0009 0.0006 0.32 5.31 8.1 10.3 6.90 7.38 March 23278 802.7 1300.0 134.0 107.56 3.3 2.65 149.8 3.6 2.89 4.47 0.37 0.30 42.65 3.64 1.70 1.36 7.55 0.50 0.0049 0.0039 7.73 5.26 9.1 11.1 6.98 7.07 April 24633 849.4 1889.0 182.3 154.85 4.5 3.82 142.8 5.8 4.93 4.09 0.31 0.26 41.60 3.03 1.24 1.05 3.94 0.88 0.0022 0.0019 4.42 5.32 9.2 11.6 6.77 7.62 May 17132 590.8 697.0 260.2 153.73 3.0 1.77 269.2 5.2 3.07 6.07 0.26 0.15 57.42 3.30 0.98 0.58 3.78 0.82 0.0036 0.0022 1 2.55 5.31 12.1 17.7 6.78 7.57 June 14904 513.9 560.0 210.5 108.18 2.5 1.28 199.8 3.5 1.80 6.25 0.23 0.12 56.75 2.23 0.48 0.25 3.83 0.18 0.0012 0.0006 0.12 5.37 17.1 19.7 6.50 6.92 July 17046 549.9 979.0 239.3 131.59 3.5 1.92 264.8 7.3 4.01 5.84 0.26 0.14 55.40 6.88 1.94 1.07 3.39 0.09 0.0072 0.0039 48.03 5.29 19.6 21.9 6.77 7.11 August 15971 515.2 680.0 191.6 98.71 2.6 1.34 165.8 3.2 1.65 5.11 0.19 0.10 43.18 2.44 0.92 0.47 2.08 0.10 0.0032 0.0017 0.34 5.39 21.2 22.8 6.78 6.92 September 15347 511.6 754.0 181.8 93.01 3.0 1.53 180.8 3.2 1.64 5.31 0.26 0.13 60.53 1.43 0.61 0.31 4.48 0.20 0.0018 0.0009 0.13 5.27 20.5 22.3 6.76 6.96 October 0.00 0.00 0.00 0.00 0.00 0.0000 November 0.00 0.00 0.00 0.00 0.00 0.0000 December 0.00 0.00 0.00 0.00 0.00 0.0000 AVERAGE I 18287.1 616.0 931.2 198.8 90.21 3.16 1.50 194.89 4.61 2.16 5.38 0.28 0.13 50.70 2.79 0.93 0.45 6.57 0.41 0.0028 0.0013 #DIV/0! r 11.12 5.31 14.0 16.6 6.81 7.20 #DIV/0! MAXIMUM J 24633.0 849.4 1889.0 260.2 154.85 4.50 3.82 269.20 7.30 4.93 6.25 0.37 0.30 60.53 6.88 1.94 1.36 16.03 0.88 0.0072 0.0039 0.000 5.39 21.2 22.8 7.01 7.62 0.00 CRITERIA Apr 16-Nov 30 1060.0 < 15 15.90 < 15 15.90 < 1.0 1.06 <2 2.16 0.10 0.106 1.25 200.00 CRITERIA Dec 1 -Apr 15 1060.0 < 15 15.90 < 15 15.90 < 1.0 1.06 <5 5.30 0.10 0.106 1.25 none MEETS Concentration Criteria YES YES YES YES YES YES YES YES YES YES YES Yes OBJECTIVES Apr 16-Nov 30 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <1 1.06 0.10 0.106 1.25 150.00 >5 OBJECTIVES Dec 1 -Apr 15 1060.0 < 10 10.60 < 10 10.60 <0.75 0.80 <3 3.18 0.10 0.106 1.25 150.00 >5 Reasons for failure/Other Problems: Remedial Actions: July 2014 - Federal (WSER) un-ionized ammonia sampling is no longer required. EFFLUENT MONITORING -OUTFALL SEWER MH79 Sample Date : 4/25/16 July 2016-Objective not met for Average Effluent Total Ammonia due to process loading and equipment maintenance. Parameter Result (mg/L) CBOD5 5 Total Suspended Solids 14 Total Phosphorus 0.46 Total Kjeldahl Nitrogen 1.4 Total Ammonia 0.5 Nitrate 4.01 Effluent discharge to the Big Otter Creek Nitrite 1.02