HomeMy WebLinkAboutBy-law No. 2011-011 THE CORPORATION OF THE
MUNICIPALITY OF BAYHAM
BY-LAW NO. 2011-011
A By-law to regulate building construction, demolition, change of use permits,
septic systems, sewer connection permits and inspections and to repeal By-Law
No. 2007-023, as amended
WHEREAS Section 7 of the Building Code Act, 1992 empowers municipal Councils to pass by-
laws respecting construction, demolition and change of use permits and inspections.
AND WHEREAS the Council of the Municipality of Bayham is desirous of enacting a by-law
under Section 7 of the Building Code Act, 1992.
THEREFORE THE COUNCIL OF THE CORPORATION OF THE MUNICIPALITY OF
BAYHAM ENACTS AS FOLLOWS.
1. SHORT TITLE
1.1 This By-law may be cited as "The Building By-law".
2. DEFINITIONS
2.1 "Act" means the Building Code Act, 1992, as amended.
2.2 "Building" means;
(a) a structure occupying an area greater than 10 square metres consisting of a
wall, roof and floor, or any one or more of them, or a structural system
serving the function thereof, including all plumbing, works, fixtures and
service systems appurtenant thereto. It does not include the replacement of
roofing metal or shingles nor minor repairs providing the structural system is
not involved or altered.
(b) A structure occupying an area of 10 square metres or less that contains
plumbing, including the plumbing appurtenant thereto,
(c) Plumbing not located in a structure,
(c.1) a sewage system; or
(d) structures designated in the building code.
2.3 "Building Code" means the regulations made under Section 34 of the Act.
2.4 "Chief Building Official" means the Chief Building Official appointed by the By-
law of the Corporation of the Municipality of Bayham for the purpose of
enforcement of the Act.
2.5 "Corporation" means the Corporation of the Municipality of Bayham.
By-Law 2011-011 -2-
2.6 "Farm Building" means a farm building as defined in the Building Code.
2.7 "Permit" means written permission or written authorization from the Chief
Building Official to perform work regulated by this by-law and the Act.
2.8 "Plumbing" means plumbing as defined in Section 1(1) of the Act.
3. DUTIES AND POWERS OF THE AUTHORITY HAVING JURISDICTION.
3.1 The Authority having jurisdiction shall administer this by-law and keep records of
all applications received, permits and orders issued, inspections and tests made,
and shall retain copies of all papers and documents connected with the
administration of this by-law, which will form part of the public records.
3.2 The Authority having jurisdiction may:
3.2.1 Enter any building or premises at a reasonable time for the purpose of
administering or enforcing this by-law.
3.2.2 Cause a written notice to be delivered to the owner of any property
directing him to correct any condition where in the opinion of the
Authority having Jurisdiction, that conditions constitute a violation of this
by-law.
3.2.3 Order the owner to stop work on the building, if it is proceeding in
contravention of this by-law or if it is an unsafe condition.
3.2.4 Direct that tests of materials, devices, construction methods, structural
assemblies or foundation conditions be made, or sufficient evidence or
proof be submitted at the expense of the owner, where such evidence or
proof is necessary to determine whether the material, device, construction
or foundation condition meets the requirements of this by-law.
3.2.5 Revoke or refuse to issue a permit where, in its opinion, the results of
tests referred to clauses 3.2.4 are not satisfactory.
3.2.6 Order the removal of any building erected or placed in violation of this
by-law.
By-Law 2011-011 -3-
4. PERMITS
4.1 Classes of Permits with respect to the Construction of Buildings shall be as set out
below:
4.1.1 Building Permit - Required under subsection 8(1) of the Act.
-may include sewage systems and /or plumbing and/or farm buildings
and/or heating, ventilation and air conditioning permits.
4.1.2 Plumbing Permit - Formerly issued under by-laws made under the Ontario
Water Resources Act. May be classed under building permit.
4.1.3 Conditional Permit - Authorized under subsection 8(3) of the Act.
4.1.4 Change of Use Permit - Required under subsection 10(1) of the Act.
4.1.5 Demolition Permit- Required under subsection 8(1) of the Act.
4.2 To obtain a permit the owner or his authorized agent shall file an application in
writing on the form prescribed by the Chief Building Official, and pay the fee
prescribed for such permit.
4.3 Except as otherwise permitted by the Chief Building Official, every applicant
shall:
4.3.1 Identify and describe in detail the work and proposed occupancy to be
covered by the permit for which the application is made;
4.3.2 Describe the land on which the work is done, by a description that will
readily identify and locate the building lot;
4.4 Except as otherwise permitted by the Chief Building Official, every Application
shall:
4.4.1 State the valuation of the proposed work including materials, the labour,
and be accompanied by the required fee;
4.4.2 State the names, addresses and telephone numbers of the owner,
authorized agent, architect, engineer, or other designer and constructor,
and;
4.4.3 Be accompanied by a written acknowledgement of the owner that he has
retained an architect or professional engineer to carry out the field review
of the construction where required by the Building Code, and;
4.4.4 Be signed by the owner or his authorized agent who shall certify the truth
of the contents of the application.
By-Law 2011-011 -4-
4.5 Where a permit has not been issued and the information in an application changes,
the applicant shall notify the Chief Building Official in writing of the changes.
4.6 An application for a permit may be deemed to have been abandoned and cancelled
six (6) months after the date of filing, unless such application is being seriously
proceeded with.
4.6.1 Where the construction of the building is, in the opinion of the Chief
Building Official substantially suspended or discontinued for a period of
more than one year, the Chief Building Official may revoke a permit.
4.7 No owner or authorized agent shall move any buildings into or within the
Municipality of Bayham without first obtaining a Building Construction Permit
and Moving Permit.
5. PLANS AND SPECIFICATIONS
5.1 When required by the Chief Building Official, every applicant shall furnish
sufficient plans, specifications, documents and other information, including
design calculations, to enable the Chief Building Official to determine
whether the proposed construction, demolition, or change of use conforms to
the Act and the Building Code, and any other applicable law.
5.2 When required by the Chief Building Official, every applicant shall furnish
a site plan. Such site plan shall:
5.2.1 Indicate the lot size and dimensions of the property;
5.2.2 Show the dimensions of any building existing and proposed and its
relationship to adjoining buildings, parking spaces and their location,
off street loading areas, location of driveways, landscaped areas, signs,
fences and all other structures, drains and such other information as the
Chief Building Official may require.
5.2.3 Indicate the proposed lot coverage;
5.2.4 Indicate the existing and finished grades and first floor elevations
referenced to an established datum at or adjacent to the site in respect
of which the application is made;
5.2.5 Show information relative to drainage;
5.2.6 Be prepared by an Ontario Land Surveyor (OLS) Professional
Engineer licensed to practice Engineering in the Province of Ontario,
when grades, elevations and drainage is provided on the site plan.
By-Law 2011-011 -5-
5.2.6.1 The as-constructed top of foundation wall elevation shall be
verified by an OLS or Engineer and written verification of
the as-constructed top of foundation elevation shall be
submitted to the Chief Building Official stating the as-
constructed elevation is within reasonable tolerance of the
proposed top of foundation wall elevation. Structural framing
of the building shall not commence until such written
verification has been received by the Chief Building Official.
5.2.6.2 The as-constructed finish grades, building elevation surface
drainage of the building lot shall be verified by an OLS or
Engineer and written verification of such grades and
elevations shall be submitted to the Chief Building Official.
The finish grades and elevations shall be within reasonable
tolerance of the proposed grades, elevations and surface
drainage. The letter of grading confirmation shall be
referred to as a grading certificate.
5.2.6.3 Reasonable tolerance shall be considered to be plus or
minus 150mm (six inches).
5.3 In lieu of separate specifications, the Chief Building Official may allow the
essential information to be shown on the plans;
5.4 Plans submitted shall be legible and be drawn to scale upon paper or such
other suitable and durable material as the Chief Building Official may
require.
5.5 Plans and specifications furnished according to this By-Law or otherwise
required by the Act become the property of the municipality and will be
disposed of or retained in accordance with relevant legislation.
5.6 Where a permit has been issued, application shall be made in writing to the
Chief Building Official for any revision of the permit before any change is
made.
5.7 Where application is made for a demolition permit under subsection 8(1) of
the Act, the application shall:
5.7.1 Contain the information required by clauses 4.3.1 to 4.4.4.
5.7.2 Be accompanied by satisfactory proof that arrangements have been
made with the proper authorities for the cutting off and plugging of
all water, sewer, gas, electric, telephone or other utilities and
services.
By-Law 2011-011 -6-
5.8 Where application is made for a conditional permit under subsection 8(3) of
the Act, the application shall:
5.8.1 Contain the information required by clauses 4.3.1 to 4.4.4
5.8.2 Contain such other information, plans and specifications concerning
the complete project as the Chief Building Official may require.
5.8.3 State the reasons why the applicant believes that unreasonable delays
in construction would occur if a conditional permit is not granted.
5.8.4 State the necessary approvals, which must be obtained in respect of
the proposed building and the time in which such approvals were
obtained.
5.8.5 State the time in which plans and specifications of the complete
building will be filed with the Chief Building Official.
5.9 Every application for a change of use permit issued under subsection
10(1) of the Act shall be submitted to the Chief Building Official, and shall:
5.9.1 Describe the building in which the occupancy is to be changed, by a
description that will readily identify and locate the building.
5.9.2 Identify and describe in detail the current and proposed occupancies
of the building or part of a building for which the application is
made.
5.9.3 Include plans and specifications which show the current and proposed
occupancy of all parts of the building, and which contain sufficient
information to establish compliance with the requirements of the
Building Code, including: floor plans; details of wall, ceiling and
roof assemblies identifying required fire resistance ratings and load
bearings capacities.
5.9.4 Be accompanied by the required fee.
5.9.5 State the name, address and telephone number of the owner.
5.9.6 Be signed by the owner or his or her authorized agent who shall
certify the truth of the contents of the application.
By-Law 2011-011 -7-
5.10 Where an application for a permit or for authorization to make a material
change to a plan, specification, document or other information on the
basis of which a permit was issued, contains an equivalent material,
system or building design for which authorization under section 9 of the
Act is requested, the following information shall be provided:
5.10.1 A description of the proposed material, system or building design
for which authorization under section 9 of the Act is requested.
5.10.2 Any applicable provisions of the Building Code.
5.10.3 Evidence that the proposed material, system or building design will
provide the level of performance required by the Building Code.
6.0 FEES
6.1 Fees for a required permit shall be set out in Schedule "A" to this by-law and are
due and payable upon submission of an application for a permit.
6.1.1 Fees payable in respect of an application for a change of use permit under
Subsection 10(1) of the Act are based on a flat rate of$80.00 as set out in
Schedule "A".
6.1.2 Occupancy Permits for residential dwelling units shall have a flat rate fee
of$200.00
6.2 Where the fees are based on the cost or valuation of the proposed work regulated
by the permit, including the cost of all material, labour, equipment, overhead and
professional and related services. The Chief Building Official may place valuation
on the cost of the work and the applicant shall pay the prescribed fee before the
issuance of the permit.
6.3 The permit fee may be recovered if the project is abandoned with a refund as set
out in Schedule"B"
6.4 A refundable security deposit in the amount of$1500.00 shall be paid to the
Municipality of Bayham at the time of building permit application. The
deposit is to assure total completion of work required under the permit taken.
The deposit will be held without interest until final inspection; the permit is
closed and then will be returned in full. The security deposit will be
required for building permits for construction of all dwelling units, all
engineered buildings and to any building with an estimated construction
value of$100,000 or more.
By-Law 2011-011 -8-
7.0 TIME OF NOTICE OF INSPECTION, RESPONSIBILITY AND DUTIES OF THE
OWNERS
7.1 The Person to whom the permit has been issued shall notify the Chief Building
Official of:
7.1.1 The proposed commencement of construction of the building, two or more
working days prior to the commencement thereof;
7.1.2 Any of the stages of construction specified in the building code, two or
more working days in advance;
7.1.3 The completion of construction before occupation, within two working
days prior to occupation of the building;
7.1.4 The change in the class of occupancy of any building, or part thereof.
8. SEWAGE SYSTEM PERMITS
8.1 Sewage Systems covered by the Ontario Building Code are those systems with a
design capacity less than 10,000 litres per day and which serve one lot.
8.2 A permit to connect to the Municipal Sewage System is required and the
submission of plans detailing location slopes and materials used in the installation.
An application will also be completed and an inspection of the new installation
prior to back filling is required. If an existing septic system is to be abandoned to
connect to the sewer, the following steps must be taken:
(1) previously used septic tanks must be pumped out by a licensed pumpout
operator
(2) previously used septic tanks must be filled with sand, earth or broken down
and backfilled or removed and properly disposed of.
9. ENFORCEMENT OF THE ACT AND REGULATIONS
9.1 As of April 6, 1998, septic standards enforcement became the responsibility of
the Municipality as part of their enforcement of the Building Code.
By-Law 2011-011 -9-
10. PROVISION FOR OFFENCES
10.1 Any person who contravenes any provision of the Building Code Act, or the
regulations of any by-law passed under the authority of the Building Code Act, is
guilty of an offence and, upon summary conviction is liable to a fine or
imprisonment, as provided by the Building Code Act.
11. BY-LAWS REPEALED
11.1 That By-law 2007-023 and all amendments regulating construction, demolition
and change of use permits and inspections be hereby repealed.
12. EFFECT
12.1 This By-Law shall come into force and effect upon final passing.
READ A FIRST, SECOND AND THIRD TIME AND FINALLY PASSED THIS 17th DAY
OF FEBRURARY 2011.
/ 64/71,9
� 1r1e
MAY•R CLERK
SCHEDULE "A"
TO BY-LAW NO. 2011-011
1. RESIDENTIAL BUILDINGS
a) New Single Family Dwellings $80.00 flat plus
Multiple Dwellings $0.48 per sq. foot
Additions to Dwellings
Living area to include finished areas in basements.
Structures in 1(b) will be an additional $0.48 per sq. foot
b) Garages, carports, indoor swimming pools & accessory $80 flat plus
buildings over 500sq ft, solariums, and any roofed $0.48 per sq. foot
over decks or porches, etc
c) Decks, ramps, wood stoves $80.00 flat
Carports
d) To construct an accessory building up to 500 sq ft $80.00 flat
e) Renovations of accessory buildings & residences $80.00 flat plus
$8.50 per $1000
construction value
1) Residential, privately owned outdoor swimming pools:
1. Inflated Pool $55.00
2. Above-Ground Pool (Base of pool at ground level) $55.00
3. On-Ground Pool (Below ground level and with a $185.00
top elevation of ain inimum of six (6) inches
4. In-Ground Pool (Top elevation of pool is at grade) $185.00
2. AGRICULTURAL BUILDINGS
a) Kilns - Tobacco
Silo & Manure Tanks $80.00 flat
Bunk Houses
b) Corn Cribs $80.00 flat
Steel Granaries
Hooped Barns
c) Renovations to Farm Buildings $80.00 flat plus
$8.50 per thousand
By-Law 2011-011 -11—
d) Farm Buildings and Additions $80.00 flat plus
With a building area up to 600m2 (6460 sq ft) $0.24 per sq. foot
e) Farm Buildings and Additions $80.00 flat plus
With a building area exceeding 600m2 (6460 sq ft) $0.16 per sq. foot
3. COMMERCIAL INDUSTRIAL, INSTITUTIONAL BUILDINGS
a) New or Additions $80.00 flat plus
With a building area up to 600m2 (6460 sq ft) $0.24 per sq. foot
b) New or Additions $80.00 flat plus
With a building area exceeding 600m2 (6460 sq ft) $0.16 per sq. foot
c) Renovations of buildings & accessory buildings $80.00 flat plus
$8.50 per $1000
construction value
d) Other structures such as public pools, silos, $80.00 flat plus
wind towers, grain dryers, etc $8.50 per $1000
construction value
4. MISCELLANEOUS
(a) Mobile Homes - as a second dwelling $80.00 flat plus
on a farm& trailer park $8.50 per $1000
construction value
(b) Modular Homes $80.00 flat plus
$0.48 per sq. foot
(c) Temporary Mobile Homes $80.00 flat plus any
(for supplementary farm dwellings) conditions laid out by
(Renewable every 1-3 years at a cost of$80.00 Council
for each term.)
(d) Temporary Mobile Homes $80.00 flat plus any
(used on site while residence is under construction) conditions laid out by
Council
By-Law 2011-011 -12-
(e) Existing buildings and houses moved to a new site $80.00 flat plus
$0.48 per sq. foot
Additions to these moved-in structures at the $0.48 per sq. foot
time of move
Additions to these moved-in structures at another time $80.00 flat plus
$0.48 per sq. foot
(f) The Chief Building Official may authorize the
transfer of a permit to another contractor if the permit
holder gives written permission. The fee for this service
is a minimum $80.00 flat
5. DEMOLITION PERMITS
a) Buildings located on a farm are exempt
b) Partial demolition projects for any part of buildings under the categories of
Assembly Occupancy, Industrial and Institutional Buildings shall be reviewed by
an architect or professional engineer providing a report with respect to the affects
of the demolition on the remaining parts of the structure or structures.
c) Permit Schedule for Demolition:
1) Assembly Occupancy $80.00 flat
2) Institutional $80.00 flat
3) Industrial $80.00 flat
4) Mercantile $80.00 flat
5) Residential & Accessory $80.00 flat
6. EXCEPTIONS
Inspections carried out for construction or installations falling $80.00 flat
under the Building Code that do not have a building permit
in place
1. Change of use permit $80.00 flat
2. Conditional permit as required under subsection 8(3) of the Act, and meeting the
requirements of 5.9 to 5.9.5 fees for the complete project are required based on
the applicable fee schedule in this by-law.
By-Law 2011-011 -13-
7. SEPTIC SYSTEMS
Class 1 - are exempt as per Section 1.3.1.1(1) (c) of Division C of the
Ontario Building Code
Class 2 - A greywater system, which can only receive greywater waste.
Fee $180.00
Class 3 - A cesspool system, which can only receive waste from a Class 1 system.
Fee $180.00
Class 4 - A leaching bed system, which accepts both human waste and greywater
waste.
Fee $375.00
Class 5 - A sanitary sewage system with an on-site holding tank for sanitary
sewage produced on-site prior to removal by a haulage service provider; it
can accept both human body waste and greywater.
Fee $375.00
Leaching Beds - can only be used in soils with percolation times greater than 1
minute and less than 125 minutes
Fee $375.00
Absorption Trench - shall have gravity flow up to 500 feet of distribution pipe and
beyond that it will require a distribution chamber with, a pump
to pressurize the system.
Fee $375.00
Filter beds - the total daily design sanitary sewage flow shall not exceed 5000 L
where the treatment unit is a septic tank, or 10,000 L where the treatment
unit is another treatment unit described in Article 8.6.2.2,Division B
of the Ontario Building Code
Fee $375.00
Repairs to:
Field beds, tanks and additions to field beds Fee $265.00
Lot Assessments - to be issued by and to the satisfaction of the Chief Building Official
as a condition of lot development
Fee $80.00
Sewage Connection Permit Fee $185.00
8. PLUMBING PERMIT Base $12.00 + $6.00 per fixture
By-Law 2011-011 -14-
SCHEDULE "B"
TO BY-LAW NO. 2011-011
REFUNDS:
Pursuant to Part 6 of this By-Law, the permit fees that may be refunded shall be a percentage of
the fees payable under this By-Law, calculated by the Chief Building Official as follows:
a) 90 percent if administrative functions only have been performed;
b) 80 percent if administrative and zoning functions have been performed;
c) 60 percent if administrative, zoning and plan examination functions have been performed;
d) 50 percent if the permit has been issued and no field inspections have been performed
subsequent to permit issuance;
e) a $80.00 fee for each field inspection that has been performed after the permit has been
issued will be deducted from all refunds;
f) If the calculated refund is less than the minimum $80.00 flat rate, no refund shall be
made of the fees paid.